- ARCUS , A. L. , 1966 , COMSOAL a computer method for sequencing operations for assembly lines . International Journal of Production Research , 4 , 259 .
- BIXEY , G. M. , 1974 , Assembly line balancing with multiple stations , Management Science , 20 , 1010 .
- BUXEY, G. M.. SLACK , N. D. , and WILD , R. , 1973 , Production flow line system design–a review , A I.I.E. Transactions , 5 , 33 .
- DAR-EL , E. M. , 1973 , MALB– a heuristic technique for balancing large single-model assembly lines , A.I I.E. Transactions , 5 , 343 .
- DAR-EL., E. M., 1975 , Solving large single-model assembly line balancing problems—a comparative study , A.I.I.E. Transactions , 7 , 302 .
- DAR-EL,E. M.,and RUBINOVITCH, 1979 , MUST—a multiple solutions technique for balancing single model assembly lines , Management Science , 25 , 1105 .
- FREEKMAN , D. R. , and JUCKER , J. V. , 1961 , The line balancing problem , Journal of Industrial Engineering , 18 , 301 .
- GEHRLIN , W. V. , and PATTERSON , J. H. , 1975 , Sequencing for assembly line with integer task times , Management Science , 21 , 1064 .
- GEHRLIN , W. V. , and PATTERSON , J. H. , 1978 , Balancing single model assembly lines comments on a paper by E. M. Dar-El (Mansoor) , A.I.I.E. Transactions , 10 , 109 .
- HELGESON , W. B. , and BIRNIE , D. P. , 1961 , Assembly line balancing using the rank positional weight technique , Journal of Industrial Engineering , 12 , 394 .
- HILLIER , F. S. , and BOLING , R. N. , 1966 , The effect of some design factors on the efficiency of production lines with variable operations times , Journal of Industrial Engineering , 17 , 651 .
- HOFFMAN , T. R. , 1963 , Assembly line balancing with a precedence matrix , Management Science , 9 , 551 .
- IGNALL , E. J. , 1965 , A review of assembly line balancing , Journal of Industrial Engineering , 16 , 244 .
- KILBRIDGE , M. D. , and WESTER , L. , 1961 , A heuristic method for assembly line balancing , Journal of Industrial Engineering , 12 , 292 .
- LEHMAN , M. , 1969 , What' going on in products assembly , Industrial Engineering ( April ), 41 .
- MASTOR , A. A. , 1970 , An experimental evaluation and comparative evaluation of production line balancing techniques , Management Science , 16 , 728 .
- MOODIE , C. L. , and YOUNG , H. H. , 1965 , A heuristic method of assembly line balancing for assumptions of constant variable work element times , Journal of Industrial Engineering . 16 , 23 .
- PINTO , P. , DANNENBRING. D. G., and KHUMANAWALA , B. M. , 1975 , A branch and bound algorithm for assembly line balancing with paralleling , International Journal of Production Research , 13 , 183 .
- RAO , N. P. , 1976 , A generalization of the ‘bowl phenomenon’ in series production systems , International Journal of Production Research , 14 , 437 .
- RIETER , P. , 1969 , On assembly line balancing problems , Operations Research , 17 , 685 .
- SALVESON , M. E. , 1955 , The assembly line balancing problems , Journal of Industrial Engineering , 6 , ( 3 ), 18 .