References
- BIGGS , J. R. 1975 , An analysis of heuristic lot sizing and sequencing rules on the performance of a hierarchical multi-product, multi-stage production inventory system utilizing material requirements planning . Ph.D. disseration , The Ohio State University .
- BIGGS , J. R. , GOODMAN , S. H. , and HARDY , S. T. 1977 , Lot sizing rules in a hierarchical multi-stage inventory system , Production and Inventory Management , 18 , 104 .
- BIGGS , J. R. , and HAHN , C. K. Impact of capacity on lot sizing decisions , in Disaggregation Problems in Manufacturing and Service Organizations , edited by L. R. Tzman et al . ( Boston Martinus Nijhoff Publishing ), 313 – 327 .
- BUFFA , E. S. 1968 , Production Inventory System Planning and Control ( HomewoŌd, III . R. I ), lrwin, Inc. ).
- COLLEY , J. L. , JR. 1968 , Job shop scheduling . Systems and Procedures Journal , July/ August, September/October (reprint courtesy of Rath & Strong, Inc., Management Consultants ).
- CONWAY , R. W. 1965 , Priority dispatching and work-in-process inventory in a job shop , The Journal of Industrial Engineering , 16 , 123 .
- CONWAY , R. W. 1965 , Priority dispatching and job lateness in a job shop , The Journal of Industrial Engineering , 16 , 228 .
- CONWAY , R. W. , MAXWELL , W. L. , and MILLER , L. W. 1967 , Theory of Scheduling ( Reading , Mass Addison-Wesley Publishing Co., Inc. ).
- GOODMAN , S. H. , HARDY , S. T. , and VITT , L. D. 1973 , Hierarchical multi-stage inventory and scheduling doctrines . Working paper . The Ohio State University .
- HALL , R. W. , and VOLLMAN , T. E. 1977 , Black and Decker pioneers with MRP , in E. W. Davis (Ed.) , Studies in Material Requirements Planning, pre-publication edition ( Washington , D.C. The American Production and Inventory Control Society, Inc. ), 21 – 47 .
- INTERNICOLA , P. 1982 , The master schedule as a capacity management tool , Production and Inventory Management Review and A PICS News , 2 , 48 .
- KRIEBEL , C. H. 1971 , A Production Management Operating System Simulation ‘ Factory-2 ’ ( Pittsburgh : Graduate School of Industrial Administration, Carnegie-Mellon University ).
- Master Production Schedule Reprints , 1977 ( Washington , D.C. The American Production-and Inventory Control Society, Inc. ).
- O'GORMAN , K. 1977 , Material requirements planning as a priority planning tool on natural date driven priorities , Master Production Schedule Reprints ( Washington , D.C. The American Production and Inventory Control Society, Inc. ), 91 – 95 .
- ORLICKY , J. A. 1971 , Requirements planning system , Proceedings of the 13th Annual International Conference of the American Production, and Inventory Control Society ( Washington , D.C. ), 228 – 239 .
- ORLICKY , J. A. 1975 , Material Requirements Planning ( New York McGraw-Hill Book Co. ).
- SCHUSSEL G. 1968 , Workload balancing and inventory minimization for job shops , The Journal of Industrial Engineering , 19 , 194 .
- SIEOEL S. 1956 , Nonparametric Statistics for the Behavioural Sciences ( New York McGraw-Hill Book Co., Inc ).
- WHITE , E. M. , ANDERSON , J. C. , SCHRODER , R. G. , and TUPY , S. 1982 , A study of the MRP implementation process , Journal of Operations Management , 2 , 145 .
- WIGHT , O. W. 1968 , To order point or nut to order point , Production and Inventory Management , 10 , 13 .
- WIGHT , O. W. 1974 , Production and Inventory Management in the Computer Age ( Boston : Cahners Books International, Inc. ).
- The computer program used for the Mann-Whitney U Test is the BMDP3S, Health Sciences Computing Facility , University of California , 90024, October 1971–April 1972 .