REFERENCES
- CHENG , T. C. E. , 1985 , Analysis of job flow-time in a job shop , Journal of the Operational Research Society , 36 , 225 .
- CONWAY , R. W. , 1965 , Priority dispatching and job lateness in a job shop , Journal of Industrial Engineering , 16 , 228 .
- EILON , S. , and CHOWDHURY , I. G. , 1976 , Due dates in job shop scheduling , International Journal of Production Research , 14 , 223 .
- JACKSON , J. R. , 1963 , Jobshop-like queueing systems , Management Science , 10 , 59 .
- SEIDMANN , A. , and SMITH , M. L. , 1981 , Due date assignment for production systems , Management Science , 27 , 571 .
- WEEKS , J. K. , 1979 , A simulation study of predictable due-dates . Management Science , 25 , 363 .
- WEEKS , J. K. , and FRYER , J. S , 1977 , A methodology of assigning minimum cost due-dates , Management Science , 23 , 872 .
- Based on a paper presented at the 7th International Conference on Production Research (Windsor, Canada), August 1983