A model for lot sizing and sequencing in process industries

&
Pages 647-674 | Received 01 Mar 1987, Published online: 07 May 2007

References

  • ARAS , O S. , and SWANSON , L. A. , 1982 , A lot sizing and sequencing algorithm for dynamicdemands upon a single facility . Journal of Operations Management , 2 , 177 .
  • BAHL , H. C. , RITZMAN , L. P. , and GUPTA , J. N. D. , 1984 , A review of production planning withsignificant setups , Operations Research , 35 .
  • BARNES , J. W. , and VANSTON , L. K. , 1981 , Scheduling jobs with linear delay penalties andsequence dependent setup costs . Operations Research , 29 , 146 .
  • BIIXINGTON , P. J. , MCCLAIN , J. O. , and THOMAS , L. J. , 1983 , Mathematical programmingapproaches to capacity-constrained MRP systems review, formulation and problemreduction . Management Science , 29 , 1126 .
  • BILLINCTON , P. J. , MCCLAIN , J. O. , and THOMAS , L. J. , 1985 , Heuristics for a multilevel lot-sizingwith a bottleneck . Management Science , 32 , 989 .
  • BITRAN , G. R. , and YANASSE , H. H. , 1982 , Computational complexity of the capacitated iot sizeproblem . Management Science , 28 , 44 .
  • BROWN , G. G. , GEOFFRION , A. M. , and BRADLEY , G. H. , 1981 , Production and sales planning withlimited shared tooling at the key operation . Management Science , 27 , 247 .
  • BRUVOLD , N. T. , and EVANS , J. R. , 1985 , Flexible mixed-integer programming formulations forproduction scheduling problems . IEE Transactions , 17 , 2 .
  • BYRD , J. , and MOORE , L. T. , 1978 , The application of a product mix linear programming model incorporate policy making . Management Science , 24 , 1342 .
  • DIXON , P. S. , and SILVER , E. A. , 1981 , A heuristic solution procedure for the multi-item SingleLevel Limited Capacity Lot Sizing Problem . Journal of Operations Management , 2 , 23 .
  • DOGRAMACI , A. , PANAYIOTOPOULOS , J. C. , and ADAM , N. R. , 1981 , The dynamic lot sizing problemfor multiple items under limited capacity . AIIE Transactions , 13 , 294 .
  • DRISCOLL , W. C. , and EMMONS , H. , 1977 , Scheduling production on one machine withchangeover costs . AIIE Transactions , 9 , 388 .
  • EILON , S. , 1969 , Multi-product scheduling in a chemical plant . Management Science , 15 , B267.
  • EISENHUT , P. S. , 1975 , A dynamic lot sizing algorithm with capacity constraints . AIIETransactions , 7 , 170 .
  • FLORIAN , M. , LENSTRA , J. K. , RINNOOY KAN , A. H. G. , 1980 , Deterministic productionplanning algorithms and complexity . Management Science , 26 , 669 .
  • GAVETT , J. W. , 1965 , Three heuristic rules for sequencing jobs to a single production facility . Management Science , 11 , B166.
  • GLASSEY , C. R. , 1968 , Minimum changeover scheduling of several products on one machine . Operations Research , 16 , 342 .
  • GORENSTEIN , S. , 1970 , Planning tire production . Management Science , 17 , B- 72 .
  • GUPTA , S. K. , 1982 , n jobs and m machine job-shop problems with sequence-dependent setup times . International Journal of Production Research , 20 , 643 .
  • IGNALL , E. , and SCHRAGE , L. E. , 1965 , Application of the branch and bound technique to someflow shop scheduling problems . Operations Research , 13 , 400 ,
  • JOHNSON , S. M. , 1954 , Optimal two- and three-stage production schedules with setup timesincluded . Naval Research Logistics Quarterly , 1 , 61 .
  • KARNI , R. , and ROLL , Y. , 1982 , A heuristic algorithm for the multi-item lot sizing problem withcapacity constraints . IEE Transactions , 14 , 249 .
  • LAMBRECHT , M. R. , and VANDERVEKEN , H. , 1979 , Heuristic procedures for the single operationmulti-item loading problem . AIIE Transactions , 11 , 319 .
  • LAWLER , E. L. , LENSTRA , J. K. , RINNOOY KAN , A. H. G. , and SHMOYS , D. B. , Editors , 1986 , TheTraveling Salesman Problem ( John Wiley and Sons Ltd. ).
  • MARKLAND , R. E. , and NEWETT , R. J. , 1976 , Production-distribution planning in a large scalecommodity processing network . Decision Sciences , 7 , 579 .
  • MARKLAND , R. E. , 1980 , Improving fuel utilization in steel mill operations using linearprogramming . Journal of Operations Management , 1 , 95 .
  • MCMAHON , G. B. , and BURTON , P. G. , 1967 , Flow-shop scheduling with the branch and boundmethod . Operations Research , 15 , 473 .
  • MEHREZ , A. , 1985 , A resource allocation problem with the aid of an integer zero-oneprogramming model in the plastic industry . Journal of Operations Management , 5 , 455 .
  • NAWAZ , M. , EPSCRORE , E. , and HAM , I. , 1983 , A heuristic algorithm for the m machine, n job flowshop sequence problem . OMEGA , 11 , 1 .
  • NEWSON , E. F. P. , 1975 , Multi-item lot size scheduling by heuristic part 1 with fixed resources . Management Science , 21 , 1186 .
  • NICHOLSON , T. A- J-. , and PULLEN , R. D. , 1971 , A linear programming model for integrating theannual planning of production and marketing . International Journal of ProductionResearch , 9 , 103 .
  • PARK , Y. B. , PEGDEN , C. D. , and ENSCORE , E. E. , 1984 , A survey and evaluation of static flowshopscheduling heuristics . International Journal of Production Research , 22 , 127 .
  • PRABHAKAR , T. , 1974 , A production scheduling problem with sequencing considerations . Management Science , 21 , 34 .
  • RATURI , A. , and HILL , A. V. , 1987 , An experimental analysis of capacity sensitive lotsizingprocedures for MRP systems . Working Paper , Carlson School of Management,University of Minnesota , U.S.A .
  • SCHRAGE , L. , 1985 , Users Manual, Linear, Integer and Quadratic Programming with LIN DO , 2ndedition ( Palo Alto , California Scientific Press ).
  • SEWARD , S. M. , TAYLOR , S. G. , and BOLANDER , S. F. , 1985 , Progress in integrating and optimizingproduction plans and schedules . International Journal of Production Research , 23 , 609 .
  • SMITH-DANIELS , V. L. , and SMITH-DANIELS , D. E. , 1986 , A mixed integer programming model forlot sizing and sequencing packaging lines in the process industries . IEE Transactions , 18 , 278 .
  • TAYLOR , S. G. , SEWARD , S. M. , and BOLANDER , S. F. , 1981 , Why the process industries aredifferent . Production and Inventory Management , 22 , 9 .
  • TRIGEIRO , W. W. , THOMAS , L. J. , MCCI.AIN , J. O. , 1985 , Capacitated lot sizing with setuplimes . Working Paper 85-07 , Georgetown University , U.S.A .
  • USKUP , E. , and SMITH , S. B. , 1975 , A branch-and-bound algorithm for two-stage production-sequencing problems . Operations Research , 23 , 118 .
  • VICKERY , S. K.M. , ARKLAND , R. E. , 1986 , Multi-stage lot sizing in a serial production system . International Journal of Production Research , 24 , 517 .
  • ZANAKIS , S. II. , and SMITH , J. S. , 1980 , Chemical production planning via goal programming . International Journal of Production Research , 18 , 687 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.