30
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

AGV-served assembly lines: influence of sequencing and launch policies on system performances

Pages 1385-1399 | Received 01 Nov 1989, Published online: 30 Mar 2007

REFERENCES

  • BAKER , K. , 1974 , Introduction to Sequencing and Scheduling ( New York : Wiley )
  • DANNENBRING , D. G. , 1977 , An evaluation of flowshop sequencing heuristics . Management Science , 23 , 1174 – 1182 .
  • EGBELU , P. J. , and ROY , N. , 1988 , Material flow control in AGV/unit load based production lines . International Journal of Production Research , 26 , 81 – 94 .
  • EGBELU , P. J. , and TANCHOCO , J. M. , 1984 , Characterization of automatic guided vehicle dispatching rules . International Journal of Production Research , 22 , 359 – 374 .
  • FRENCH , S. , 1982 , Sequencing and Scheduling ( New York : Ellis Horwood ).
  • GRASSO , V. , MASNATA , A. , and PIACENTINI , M. , 1988 a , Heuristic procedures for group scheduling . Proceedings of the 4th International Conference on Mechanical Design and Production ( Oxford : Pergamon Press ).
  • GRASSO , V. , PIACENTINI , M. , and PEREZ , G. , 1988 b , Effectiveness of heuristic solutions for the flow-shop sequencing problem . Proceedings of the 20th CIRP International Seminar on Manufacturing Systems , Tbilisi ( to be published ).
  • GRASSO , V. , PIACENTINI , M. , and POLLINA , F. , 1986 , A cost optimization approach for multiproduct, multistage production systems . Proceedings of the 4th International Symposium on Production Control in the Metalworking Industry , 121 – 129 ( Beograd Masinski fakultet ).
  • HALL , D. N. , STECKE , K. E. , 1986 , Design problems of flexible assembly systems . Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems ( Amsterdam : Elsevier ), pp. 145 – 156 .
  • JOHNSON , S. M. , 1954 , Optimal two and three-stage production schedules with setup times included . Naval Research Logistics Quarterly , 1 , 61 – 68 .
  • KING , J. R. , 1979 , Scheduling and the problem of computational complexity . OMEGA , 1 , 233 – 240 .
  • KING , J. R. , and SPACHIS , A. S. , 1980 , Heuristics for flow-shop scheduling . International Journal of Production Research , 18 , 345 – 357
  • PARK , Y. B. , PEGDEN , C. D. ,ENSCORE, E. E. Jr , 1984 , A survey and evaluation of static flowshop scheduling heuristics . International Journal of Production Research , 22 , 127 – 141 .
  • RAJENDRAN , C. , CHAUDHURI , D. , NARENDKAN , T. T. , 1988 , Computer aided scheduling of jobs in flowshops . Proceedings of the Third International Conference on Computer-Aided Production Engineering ( Dearborn SME ) pp. 361 – 367 .
  • WILHELM , W. E. , 1986 , A model to approximate transient performance of the flowshop . International Journal of Production Research , 24 , 33 – 50 .
  • WILHELM , W. E. , AHMADI-MARANDI , S. , 1982 , A methodology to describe operating characteristics of assembly systems . IIE Transactions , 14 , 204 – 213 .
  • WOOLAM , C. R. , 1986 , Flowshop with no idle machine time allowed . Computers and Industrial Engineering , 10 , 69 – 76 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.