37
Views
25
CrossRef citations to date
0
Altmetric
Original Articles

Design of a scheduling system for flexible manufacturing cells†

&
Pages 2037-2049 | Received 01 Apr 1990, Published online: 30 Mar 2007

REFERENCES

  • BAKER , K. R. , 1974 , Introduction to Sequencing and Scheduling ( New York John Wiley ).
  • BANSAL , S. P. , 1977 , Minimizing the sum of completion times of n-jobs over m-machines in a flow shop—a branch and bound approach . AIIE Transactions , 9 , 306 .
  • BARTOS , F. J. , 1988 , Cell and area controls make automation building blocks . Control Engineering , 35 , 72 .
  • CAMPBELL , H. G. , DUDECK , R. A. , and SMITH , M. L. , 1970 , A heuristic algorithm for the n-job, m-machine sequencing problem . Management Science , 16 , B630 .
  • CONWAY , R. W. , MAXWELL , W. L. , and MILLER , L. W. , 1967 , Theory of Scheduling ( Reading , Mass . Addison-Wesley ).
  • FOLEY , R. D. , and SURESH , S. , 1984 , Minimizing the expected flowtime in stochastic flow shops . AIIE Transactions , 4 , 11 .
  • GUPTA , J. N. , 1972 , Heuristic algorithms for the multistage flow-shop scheduling problem . AIIE Transactions , 4 , 11 .
  • GUPTA , J. N. , and REDDI , S. S. , 1978 , Improved dominance conditions for the three-machine flow-shop scheduling problem . Operations Research , 26 , 200 .
  • IGNALL , E. , and SCHRAGE , L. , 1965 , Applications of the branch and bound technique to some flow-shop scheduling problems . Operations Research , 13 , 400 .
  • KRONE , M. , 1974 , Heuristic programming solution of a flow-shop scheduling problem . Operations Research , 22 , 629 .
  • MELNYK , S. A. , and CARTER , P. L. , 1987 , Production Activity Control A Practical Guide ( Homewood , Il Don Jones-Irwin ).
  • MIYAZAKI , S. , NISHIYAMA , N. , and HASHIMOTO , F. , 1978 , An adjacent pairwise approach to the mean flow-time scheduling problem . Journal of the Operations Research Society of Japan , 21 , 287 .
  • PANWALKER , S. S. , and KHAN , A. W. , 1976 , An ordered flow-shop sequencing problem with mean completion time criterion . International Journal of Production Research , 14 , 631 .
  • SARIN , S. C. , and EYBL , D. , 1978 , The two-machine mean-flowtime flowshop problem and some special cases . TIMS-ORSA Meeting , Los Angeles , November .
  • SEIDMANN , A. , 1987 , On-line scheduling of a robotic manufacturing cell with stochastic sequence-dependent processing rates . International Journal of Production Research , 25 , 907 .
  • SNADER , K. R. , 1986 , Flexible manufacturing systems an industry overview . Production and Inventory Management , 27 , 1 .
  • SZWARC , W. , 1978 , Dominance conditions for the three-machine flow-shop problem . Operations Research , 26 , 203 .
  • SZWARC , W. , 1984 , The flow-shop problem with mean completion time criterion . IIE Transactions , 15 , 172 .
  • †This paper is based on PhD research performed by D.-Y. Chan at Arizona State University: ‘Design of a scheduling system for a flexible manufacturing cell’. A complete copy of the paper may be obtained through University Microfilms, Ann Arbor, Michigan, U.S.A.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.