45
Views
16
CrossRef citations to date
0
Altmetric
Original Articles

Assembly line with flexible work-force

&
Pages 469-483 | Received 01 Feb 1991, Published online: 28 Mar 2007

REFERENCES

  • BUXEY , G. M. , SLACK , N. D. , and WILD , R. , 1973 , Production flow line system design-a review . A.I.I.E. Transactions , 5 , 37 – 48 .
  • BUZACOTT , J. A. , 1971 , The role of inventory banks in flow-line production systems . InternationalJournal of Production Research , 9 , 425 – 436 .
  • DOWNEY , B. S. , 1989 , Assembly line with a flexible work force . Ph.D Thesis , Department ofIndustrial Engineering, College of Engineering, University of Missouri , Columbia .
  • HELD , M. , KARP , R. M. , and SHARESHIAN , R. , 1963 , Assembly line balancing dynamicprogramming with precedence constraints . Operations Research , 11 , 442 – 459 .
  • HILLIER , F. S. , and BOLING , R. W. , 1966 , The effect of source design factors on the efficiencyof production lines with variable operations times . Journal of Industrial Engineering , 17 , 651 – 658 .
  • MAGAZINE , M. J. , and SILVER , G. L. , 1978 , Heuristics for determining output and workallocations in series flow lines . International Journal of Production Research , 16 , 169 – 181 .
  • SCHONBERGER , R. J. , 1983 , Japanese Manufacturing Techniques ( New York The London FreePress ).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.