27
Views
8
CrossRef citations to date
0
Altmetric
Original Articles

Stochastic modelling and comparisons of two flexible manufacturing cells with single and double gripper robots

&
Pages 633-645 | Received 01 Feb 1992, Published online: 26 Apr 2007

References

  • ANDRE , P. , BUSSOD , D. , BERGER , J. , and CHAVEY , P. , |at 1982 , Programmable assembly robot formicro-mechanical applications . Proceedings Twelfth International Symposium on Industrial Robots , Paris , pp. 439 – 444 .
  • CHAN , D. , and BEDWORTH , D. D. , 1990 , Design of a scheduling system for flexible manufacturing cells . International Journal of Production Research , 28 (11) , 2037 – 2049 .
  • GROOVER , M. P. , 1987 , Automation, Production Systems, and Computer Integrated Manufacturing ( Englewood Cliffs, NJ Prentice-Hall ).
  • HENNEKE , M. J. , and CHOI , R. H. , 1990 , Evaluation of FMS parameters on overall system performance . Computers and Industrial Engineering , 18 (1) , 105 – 110 .
  • HITOMI , K. , and YOSHIMURA , M. , 1986 , Operations scheduling for work transportation by industrial robots in automated manufacturing systems . Material Flow , 3 131 – 139 .
  • HUTCHINSON , J. , LEOG , K. , SNADER , D. , and WARD , P. , 1991 , Scheduling approaches for random job shop flexible manufacturing systems . International Journal of Production Research , 29(5) , 1053 – 1067 .
  • MAIONE , B. , SEMERARO , Q. , and TURCHIANO , B. , 1986 , Closed analytical formulae for evaluating flexible manufacturing system performance measures . International Journal of Production Research , 24 (3) , 583 – 592 .
  • PHAM , D. T. , and YEO , S. H. , 1991 , Strategies for gripper design and selection in robotic assembly . International Journal of Production Research , 29 (2) , 303 – 316 .
  • RATMIROV , V. A. , and SNAKSAREV , A. M. , 1986 , A mathematical model of a flexible manufacturing module . Soviet Engineering Research , 6 (6) , 48 – 49 .
  • SABUNCUOGLU , I. , and HOMERTZHEIM , D. L. , 1989 , Expert simulation systems-recent developments and applications in flexible manufacturing systems . Computers and Industrial Engineering , 16 (4) , 575 – 585 .
  • SAVSAR , M. , 1991 , Modelling of a flexible manufacturing cell . Proceedings Seventh Conference of the Irish Manufacturing Committee on Advanced Manufacturing Technology , Dublin , pp. 331 – 348 , 29 – 31 August .
  • SAVSAR , M. , and FARRASH , S. , 1989 , Simulation of a robotized manufacturing cell Proceedings Sixth Conference of the Irish Manufacturing Committee on Advanced Manufacturing Technology , Dublin , pp. 178 – 191 , 31 August-1 September .
  • SEIDMANN , A. , 1987 , On-line scheduling of a robotic manufacturing cell with stochastic sequence dependent processing rates . International Journal of Production Research , 25 , 907 – 917 .
  • SNADER , K. R. , 1986 , Flexible manufacturing systems an industry overview . Production and Inventory Management , 27 (1), 6 – 11 .
  • STEHN , T. , 1985 , The development and implementation of industrial robots for assembly operations in the automative and electrical industry . Proceedings Sixth International Conference on Assembly Automation , Birmingham , pp. 41 – 48 .
  • SULIMAN , S. M. A. , EL-TAMIMI , A. M. , and WILLIAMS , D. F. , 1988 , Computer simulation of flexible assembly cells . Advances in Modelling and Simulation , 14 (1) , 15 – 28 .
  • YAO , D. D. , and BUZACOTT , J. A. , 1986 , Models of flexible manufacturing systems with limited local buffers . International Journal of Production Research , 24 (1) , 107 – 118 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.