20
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

Dynamic assignation of due-dates in an assembly shop based in simulation

&
Pages 1539-1554 | Received 01 Jul 1995, Published online: 19 Apr 2007

References

  • CHENG , T. C. E. 1984 , A combined approach to due-date scheduling . In Advances in Production Management Systems ( North Holland Elsevier ).
  • CONWAY , R. W. , MAXWELL , W. L. and MILLER , L. W. 1967 , Theory of Scheduling ( Reading , Mass Addison-Wesley ).
  • EILON , S. and CHOWDHURY , I. G. 1976 , Due dates in job shop scheduling . International Journal of Production Research , 14 , 223 – 237 .
  • FRY , T. D. , PHILIPOOM , P. R. and MARKLAND , R. E. 1990 , Due date assignment in a multistage job shop. IIE Transactions , 21 , 153 – 161 .
  • FRY , T. D. , OLIFF , M. D. , MINOR , E. D. and LEONG , G. K. 1989 , The effects of product structure and sequencing rule on assembly shop performance . International Journal of Production Research , 27 , 671 – 686 .
  • GERE , W. S. 1966 , Heuristics in job shop scheduling . Management Science , 13 , ( 3 ).
  • GOODWIN , J. S. and WEEKS , J. K. 1986 , Evaluating scheduling policies in a multilevel assembly system . International Journal of Production Research , 24 , 247 – 257 .
  • HUANG , P. Y. 1984 , A comparative study of priority dispatching rules in a hybrid assembly job shop . International Journal of Production Research , 22 , 375 – 387 .
  • MAXWELL , W. L. and MEHRA , M. 1968 , Multiple-factor rules for sequencing with assembly constraints . Naval Research Logistics Quarterly , 15 , 241 – 254 .
  • MIYAZAKI , S. 1981 , Combined scheduling system for reducing job tardiness in a job shop , International Journal of Production Research , 19 , pp. 201 – 211 .
  • PHILIPOOM , P. R. , RUSSELL , R. S. and FRY , T. D. 1991 , A preliminary investigation of multi-attribute based sequencing rules for assembly shops . International Journal of Production Research , 29 , 739;753 .
  • RAGATZ , G. L. and MABERT , V. A. 1984 , A simulation analysis of due date assignment rules . Journal of Operations Management , 5 , 27 – 39 .
  • ROCHETTE , R. and SADOWSKI , R. P. 1976 , A statistical comparison of simple dispatching rules for a particular set of job shops . International Journal of Production Research , 14 , 63 – 75 .
  • RUSSELL , R. S. , TAYLOR III , B. W. 1985 , An evaluation of scheduling policies in a dual resource constrained assembly shop . IIE Transactions , 17 , 219 – 232 .
  • SCULLI , D. 1987 , Priority dispatching rules in job shops with assembly operations and random delays . Omega 15 49 – 57 .
  • SIEGEL , G. B. 1971 , An investigation of job shop scheduling for job shops with assembly constraints . PhD thesis, Industrial Engineering, Cornell University , USA .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.