REFERENCES
- ADAMS , J. , BALAS , E. and ZAWACK , D. 1988, The shifting bottleneck procedure for job shop scheduling . Management Science , 34 ( 3 ), 391 – 401 .
- BAKER , K. R. 1974 , Introduction to sequencing and scheduling ( New York Wiley ).
- CARLSON , B. J. and LETTIERE , C. A. 1993, A comparison of the DISASTERTM scheduling software with a simultaneous scheduling algorithm for minimizing maximum tardiness in job shops. MS thesis, AFIT/GSM/LAS/93S-9, Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology (AU), Wright-Patterson AFB, OH .
- DEMEULEMEESTER , E. L. and HERROELEN , W. S. 1992a, A branch-and-bound procedure for the multiple resource-constrained project scheduling problem . Management Science , 38 ( 12 ), 1803 – 1818 .
- DEMEULEMEESTER , E. L. and HERROELEN , W. S. 1992 b, A branch-and-bound procedure for the generalized resource-constrained project scheduling problem. Research Report N 9206, Department of Applied Economic Sciences, Katholieke Universiteit Leuven , Belgium .
- DEMEULEMEESTER , E. L. and HERROELEN , W. S. 1995 , Modelling setup times, process batches and transfer batches using activity network logic . European Journal of Operational Research , in press .
- FLORIAN , M. , TREPANT , P. and MCMAHON , G. 1971 , An implicit enumeration algorithm for the machine sequencing problem . Management Science , 17 , pB782–B792 p.
- GARGEYA , V. B. 1992, An evaluation of resource constraint measures in a dual constrained job environment. Proceedings of the Annual Meeting of the Decision Sciences Institute, San Francisco, CA Decision Sciences institute, pp. 1538–1540.
- GOLDRATT , E. M. 1990a , What is this thing called theory of constraints and how should it be implemented ?( Croton-on-Hudson , NY North River Press ).
- GOLDRATT , E. M. 1990b , Sifting information out of the data ocean the haystack syndrome ( Croton-on-Hudson , NY North River Press ).
- JAMES , S. W. and MEDIATE , B. A. Jr. , 1993 , Benchmark production scheduling problems for job shops with interactive constraints. MS thesis, AF1T/GSM/LAS/93S-9. Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology (AU) , Wright-Patterson AFB , OH .
- LUEBBE , R. and FINCH , B. 1992, Theory of constraints and linear programming a comparison . International Journal of Production Research , 30 (6), 1471 – 1478 .
- PLENERT , G. 1993, Optimizing theory of constraints when multiple constrained resources exist . European Journal of Operational Research , 70 , 126 – 133 .
- RIEZEBOS , J. , GAALMAN , G. J. C. and GUPTA , J. N. D. 1993, Flow shop scheduling with multiple operations and time lags. Proceedings of the FuCOM Conference, Monk,Belgium, 576–590.
- ROSE, C., 22 February 1993 , Personal Communication
- SCHRAGENHEIM , E. and RONEN , B. 1990 , Drum-buffer-rope shop floor control . production and Inventory Management Journal , Q3 , 31 , 18 – 23 .
- SIMONS , J. V. , Jr. and SIMPSON , W. P. , III. 1995 , An explication and characterization of the Goal System (formerly DISASTERTM ) approach to multiple constraint scheduling for drum-buffer-rope (DBR) production management systems. Technical Memorandum , AFIT-LA-TM-95-1, Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology (AU) , Wright-Patterson AFB , OH .
- UMBLE , M. M. and SRIKANTH , M. L. 1990 , Sychronous manufacturing principles for world class excellence ( Cincinnati , OH South-Western Publishing ).
- WOOLSEY , R. E. D. and SWANSON , H. S. 1975 , Operations Research for Intermediate Application-A Quick and Dirty Manual ( New York Harper & Row ).