412
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Determining the optimal number of Kanban in multi-products supply chain system

, &
Pages 189-201 | Received 12 Feb 2008, Accepted 22 Apr 2009, Published online: 19 Jan 2010

References

  • Al-Tahat, M.D., Liverani, A., and Persiani, F. (2001a), Computer Supported Design of Flexible Kanban System for a Multi-stage Multi-product Manufacturing, in First International Industrial Engineering Conference, September 23–27, Amman, Jordan
  • Al-Tahat, M.D., Liverani, A., and Persiani, F. (2001b), ‘Design of a Marketing Decision Support Method for Price Quotation in a Multi-Stage Single-product Kanban-based, Manufacturing Environment’, in XII ADM International Conference, September 5–7, Rimini, Italy
  • Al-Tahat, M.D., Liverani, A., Persiani, F. and Caligiana, G. (2002), ‘Using Genetic Algorithms to Optimize Kanban-based Production System’, in The European Applied Business Research Conference, June 17–21, Rothenburg, Germany
  • Al-Tahat, M.D.A. (2005a), ‘Queuing-Based Control strategy for Kanban Controlled Manufacturing systems’, In Third Minia International Conference for Advanced Trends in Engineering, April, 3–5, Egypt, El-Minia
  • Al-Tahat, M.D. (2005b), ‘Optimizing of Work In Progress (WIP) in Kanban Controlled Production Lines’, Dirasat, Engineering Sciences 32(2), 123–132
  • Al-Tahat , MD and Mukattash , AM . 2006 . Design an Analysis of Production Control Scheme for Kanban-based JIT Environment . Journal of the Franklin Institute , 343 : 521 – 531 .
  • Bart , J and Golany , B . 1991 . Determining the Number of Kanbans in a Multi product Multistage Production System . International Journal of Production Research , 29 ( 5 ) : 881 – 895 .
  • Chang , TM and Yih , Y . 1994 . Determining The Number of Kanbans and Lot sizes in a Generic Kanban System: A Simulated Annealing Approach . Computers and Industrial Engineering , 32 ( 8 ) : 1991 – 2004 .
  • Chen , P , Guo , Y , Lim , A and Ridrigues , B . 2006 . Multiple Cross Docks with Inventory and Time Windows . Computers & Operations Research , 33 : 43 – 63 .
  • Collins , NE , Eglese , RW and Golden. , BL . 1988 . Simulated Annealing–An Annotated Bibliography . American Journal of Mathematical and Management Sciences , 8 : 209 – 308 .
  • Martin , AD , Chang , TM , Yih , Y and Kincaid , RK . 1998 . Using Tabu Search to Determine The Number of Kanbans and Lot sizes in Generic Kanban System . Annals of Operations Research , 78 : 201 – 217 .
  • Miyazaki , S , Ohta , H and Nishiyama , N . 1988 . The Optimal Operational Planning of Kanban to Minimize the Total Operational Cost . International Journal of Production Research , 26 ( 10 ) : 1605 – 1611 .
  • Moeeni , F and Chang , Y . 1990 . An Approximate Solution to Deterministic Kanban Systems . Decision Science , 21 : 596 – 607 .
  • Monden , Y . 1983 . Toyota Production System , Norcross, , Georgia : Industrial Engineering and Management Press .
  • Murty , KG . 1995 . Operations Research: Deterministic Optimization Models , Englewood Cliffs : Prentice Hall .
  • Philipoom , PR , Rees , LP , Taylor , BW and Huang , PY . 1990 . A Mathematical Programming Approach for Determining Work Centre Lot Sizes in a Just-in-time System with Signal Kanbans . International Journal of Production Research , 28 ( 1 ) : 1 – 15 .
  • Pujawan, N. (1997), Determining the Number of Kanbans and Withdrawal Lot Sizes in a Multistage and Multiproduct Assembly System. AIT thesis, Asian Institute of Technology
  • Rabbani , M , Layegh , J and Ebrahim , RM . 2008 . Determination of Number of Kanbans in a Supply Chain System Via Memetic Algorithm . Advances in Engineering Software , 40 ( 6 ) : 431 – 437 .
  • Sarker , BR and Balan , CV . 1999 . Operations Planning for Multi-stage Kanban System . European Journal of Operational Research , 112 : 284 – 303 .
  • Shahabudeen , P , Gopinath , R and Krishnaiah , K . 2002 . Design of Bi-criteria Kanban System Using Simulated Annealing Technique . Computers & Industrial Engineering , 41 : 355 – 370 .
  • Wang , S and Sarker , BR . 2006 . Optimal Models for a Multi-stage Supply Chain System Controlled by Kanban Under Just-in-time Philosophy . European Journal of Operational Research , 172 : 179 – 200 .
  • Yokota , T , Gen , M and Li , YX . 1996 . Genetic Algorithm for Non Linear Mixed Integer Programming Problems and Its Applications . Computers and Industrial Engineering , 30 ( 4 ) : 905 – 917 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.