246
Views
17
CrossRef citations to date
0
Altmetric
Original Articles

Product and process parameters determination for quality and cost

&
Pages 2042-2054 | Received 19 Apr 2012, Accepted 11 Dec 2012, Published online: 21 Jan 2013

References

  • Albiñana, J.C., and Vila, C. (2012), ‘A Framework for Concurrent Material and Process Selection During Conceptual Product Design Stages’, Materials and Design, 41, 433–446.
  • Chen, C.H., and Lai, M.T. (2007), ‘Determining the Optimum Process Mean Based on Quadratic Quality Loss Function and Rectifying Inspection Plan’, European Journal of Operational Research, 182, 755–763.
  • Chen, C.H., and Michael, B.C. (2009), ‘Optimum Process Mean and Manufacturing Quantity Settings for Serial Production System Under the Quality Loss and Rectifying Inspection Plan’, Computers and Industrial Engineering, 57, 1080–1088.
  • Danilovic, M., and Browning, T.R. (2007), Managing Complex Product Development Projects With Design Structure Matrices and Domain Mapping Matrices’, International Journal of Project Management, 25, 300–314.
  • Feng, Q., and Kapur, K.C. (2006), ‘Economic Development of Specifications for 100% Inspection Based on Asymmetric Quality Loss Functions’, IIE Transactions, 38, 659–669.
  • Hsu, C.M., Su, C.T., and Liao, D. (2003), ‘A Novel Approach for Optimizing the Optical Performance of the Broad Band Tap Coupler’, International Journal of Systems Science, 34, 215–226.
  • Huang, H.Z., and Gu, Y.K. (2006), Development Mode Based on Integration of Product Models and Process Models’, Concurrent Engineering: Research and Applications, 14(1), 27–34.
  • Jeang, A., Chung, C.P., and Hsieh, C.K. (2007), ‘Simultaneous Process Mean and Process Tolerance Determination With Asymmetrical Loss Function’, International Journal of Advanced Manufacturing Technology, 31, 694–704.
  • Kuskay, B., and Bulutcu, A.N. (2011), ‘Design Parameters of Boric Acid Production Process from Colemaniteore in the Presence of Propionic Acid’, Chemical Engineering and Processing, 50, 377–383.
  • Lamghabbar, A., Yacout, S., and Ouali, M.S. (2004), ‘Concurrent Optimization of the Design and Manufacturing Stages of Product Development’, International Journal of Production Research, 42(21), 4495–4512.
  • Pearn, W.L., Chang, Y.C., and Wu, C.W. (2006), ‘Multiple-Process Performance Analysis Chart Based on Process Loss Indices’, International Journal of Systems Science, 37(7):429–435.
  • Phadke, M.S. (1989), Quality Engineering Using Robust Design, Englewood Cliffs, NJ: Prentice Hall.
  • Rahim, M.A., and Shaibu, A.B. (2000), ‘Economic Selection of Optimal Target Values’, Process Control and Quality, 11, 369–381.
  • Rahim, M.A., Bhadury, J., and Al-Sultan, K.S. (2002), ‘Joint Economic Selection of Optimal Target Mean and Variance’, Engineering Optimization, 34, 1–14.
  • Rosenthal, R.E. (2008), GAMS – A User's Guide, Washington DC: GAMS Development Corporation.
  • Shi, J., and Zhou, S. (2009), ‘Quality Control and Improvement for Multistage Systems: A Survey’, IIE Transactions, 41, 744–753.
  • Su, C.T., and Chang, H.H. (2000), ‘Optimization of Parameter Design: An Intelligent Approach Using Neural Network and Simulated Annealing’, International Journal of Systems Science, 31, 1543–1549.
  • Taguchi, G., Elsayed, E., and Hsiang, T. (1989), ‘Quality Engineering in Production Systems, New York: McGraw Hill.
  • Teeravaraprug, J. (2005), ‘Determining Optimal Process Mean of Two Market Products’, International Journal of Advanced Manufacturing Technology, 25, 1248–1253.
  • Trott, M. (2006), The Mathematica Guide Book for Numeric, New York: Springer Science Business Media Inc.
  • Tsao, Y.C. (2012), ‘Combined Production-Maintenance Decisions in Situations With Process Deterioration’, International Journal of Systems Science. DOI: 10.1080/00207721.2012.669865.
  • Tsou, J.C. (2010), ‘Production System With Process Quality Control: Modelling and Application’, International Journal of Systems Science, 41(7), 865–874.
  • Tsou, J.C., Hejazi, S.R., and Barzoki, M.R (2012), ‘Economic Production Quantity Model for Items With Continuous Quality Characteristic, Rework and Reject’, International Journal of Systems Science, 43(12), 2261–2267.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.