130
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

Due-date assignment for multi-server multi-stage assembly systems

Pages 1246-1256 | Received 11 Jan 2013, Accepted 07 Jun 2013, Published online: 09 Jul 2013

References

  • Ahmed, I., and Fisher, W.W. (1992), ‘Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling’, Decision Sciences, 23, 633–647.
  • Azaron, A., Katagiri, H., Kato, K., and Sakawa, M. (2006), ‘Modelling Complex Assemblies As a Queueing Network for Lead Time Control’, European Journal of Operational Research, 174, 150–168.
  • Azaron, A., and Kianfar, F. (2006), ‘A Multi-Objective Lead Time Control Problem in Multistage Assembly Systems Using an Interactive Method’, Applied Mathematics and Computation, 176, 609–620.
  • Azaron, A., and Kianfar, F. (2009), ‘Due Date Assignment for Multistage Assembly Systems’, Optimum Letters, 3, 199–210.
  • Azaron, A., and Modarres, M. (2005), ‘Distribution Function of the Shortest Path in Networks of Queues’, OR Spectrum, 27, 123–144.
  • Baker, K.R., and Powell, S.G. (1995), ‘A Predictive Model for the Throughput of Simple Assembly Systems’, European Journal of Operational Research, 81, 336–345.
  • Baybars, I. (1986), ‘A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem’, Management Science, 32, 909–932.
  • Bhat, U.N. (1986), ‘Finite Capacity Assembly-Like Queues’, Queueing Systems, 1, 85–101.
  • Biskup, D., and Jahnke, H. (2001), ‘Common Due Date Assignment for Scheduling on a Single Machine with Jointly Reducible Processing Times’, International Journal of Production Economics, 69, 317–322.
  • Chang, H.J., Su, R.H., Yang, C.T., and Weng, M.W. (2012), ‘An Economic Manufacturing Quantity Model for a Two-Stage Assembly System with Imperfect Processes and Variable Production Rate’, Computers & Industrial Engineering, 63, 285–293.
  • Chao, J.S., and Graves, S.C. (1998), ‘Reducing Flow Time in Aircraft Manufacturing’, Production and Operations Management, 7, 38–52.
  • Cheng, T.C.E., and Gupta, M.C. (1989), ‘Survey of Scheduling Research Involving Due Date Determination Decisions’, European Journal of Operational Research, 38, 156–166.
  • Cheng, T.C.E., Kang, L., and Ng, C.T. (2004), ‘Due-Date Assignment and Single Machine Scheduling with Deteriorating Jobs’, Journal of the Operational Research Society, 55, 198–203.
  • Ching, S.N., Meerkov, S.M., and Zhang, L. (2008), ‘Assembly Systems with Non-Exponential Machines: Throughput and Bottlenecks’, Nonlinear Analysis: Theory, Methods & Applications, 69, 911–917.
  • Di Mascolo, M., David, R. and Dallery, Y. (1991), ‘Modeling and Analysis of Assembly Systems with Unreliable Machines and Finite Buffer’, IIE Transactions, 21, 315–330.
  • Drexl, A., and Kolisch, R. (1996), ‘Assembly Management in Machine Tool Manufacturing and the PRISMA-Leitstand’, Productions and Inventory Management Journal, 37, 55–57.
  • Dumond, J., and Mabert, V.A. (1988), ‘Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis’, Management Science, 34, 101–118.
  • Eilon, S., and Chowdhury, I.G. (1976), ‘Due-Date in Job-Shop Scheduling’, International Journal of Production Research, 14, 223–237.
  • Elvers, D.A. (1973), ‘Job Shop Dispatching Rules Using Various Due-Date Setting Criteria’, Production and Inventory Management, 14, 63–79.
  • Ghosh, S., and Gagnon, R.J. (1989), ‘A Comprehensive Literature Review and Analysis of the Design, Balancing and Scheduling of Assembly Systems’, International Journal of Production Research, 27, 637–670.
  • Gordon, V., Proth, J.M., and Chu, C. (2002), ‘A Survey of the State-of-the-Art of Common Due Date Assignment and Scheduling Research’, European Journal of Operational Research, 139, 1–25.
  • Gordon, V.S., and Strusevich, V.A. (2009), ‘Single Machine Scheduling and Due Date Assignment with Positionally Dependent Processing Times’, European Journal of Operational Research, 198, 57–62.
  • Govil, M.K., and Fu, M.C. (1999), ‘Queueing Theory in Manufacturing: A Survey’, Journal of Manufacturing Systems, 18, 214–240.
  • Harrison J.M. (1973), ‘Assembly-Like Queues’, Journal of Applied Probability, 10, 354–367.
  • Hemachandra, N., and Eedupuganti, S.K. (2003), ‘Performance Analysis and Buffer Allocations in Some Open Assembly Systems’, Computers & Operations Research, 30, 695–704.
  • Ho, W.T., Pan, J.C.H., and Hsiao, Y.C. (2012), ‘Optimizing Multi-Stage Production for An Assembly-Type Supply Chain with Unequal Sized Batch Shipments’, Journal of Optimization Theory and Applications, 153, 513–531.
  • Hopp, W.J., and Simon, J.T. (1989), ‘Bounds and Heuristics for Assembly-Like Queues’, Queueing Systems, 4, 137–156.
  • Jones, C.H. (1973), ‘An Economic Evaluation of Job Shop Dispatching Rules’, Management Science, 20, 293–307.
  • Kulkarni, V., and Adlakha, V. (1986), ‘Markov and Markov-Regenerative PERT Networks’, Operations Research, 34, 769–781.
  • Latouche, G., and Neuts, M.F. (1980), ‘Efficient Algorithm Solutions to Exponential Tandem Queue with Blocking’, SIAM Journal on Algebraic and Discrete Methods, 1, 93–106.
  • Lee, J.K., Lee, K.J., Park, H.K., Hong, J.S., and Lee, J.S. (1997), ‘Developing Scheduling Systems for Daewoo Shipbuilding: DAS Project’, European Journal of Operational Research, 97, 380–395.
  • Lipper, E.H., and Sengupta, B. (1986), ‘Assembly-Like Queues with Finite Capacity: Bounds, Asymptotics and Approximations’, Queueing Systems, 1, 67–83.
  • Liu, X.G., and Buzacott, J.A. (1990), ‘Approximate Models of Assembly Systems with Finite Inventory Banks’, European Journal of Operational Research, 45, 143–154.
  • Liu, L., and Yuan, X.M. (2001), ‘Throughput, Flow Times, and Service Level in an Unreliable Assembly System’, European Journal of Operational Research, 135, 602–615.
  • Louly, M.A., Dolgui, A., and Al-Ahmari, A. (2012), ‘Optimal MRP Offsetting for Assembly Systems with Stochastic Lead Times: POQ Policy and Service Level Constraint‘, Journal of Intelligent Manufacturing, 23, 2485–2495.
  • Luenberger, D. (1979), Introduction to Dynamic Systems, New York: John Wiley & Sons.
  • Manitz, M. (2008), ‘Queueing-Model Based Analysis of Assembly Lines with Finite Buffers and General Service Times’, Computers & Operations Research, 35, 2520–2536.
  • Mosheiov, G., and Sarig, A. (2009), ‘Due-Date Assignment on Uniform Machines’, European Journal of Operational Research, 193, 49–58.
  • Nof, S.Y., Wilhelm, W.E., and Warnecke, H. (1997), Industrial Assembly, London: Chapman and Hall.
  • Panwalkar, S.S., Smith, M.L., and Seidmann, A. (1982), ‘Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem’, Operations Research, 30, 391–399.
  • Papadopoulos, H.T., and Heavey, C. (1996), ‘Queueing Theory in Manufacturing Systems Analysis and Design: A Classification of Models for Production and Transfer Lines’, European Journal of Operational Research, 92, 1–27.
  • Perkgoz, C., Azaron, A., Katagiri, H., Kato, K., and Sakawa, M. (2007), ‘A Multi-Objective Lead Time Control Problem in Multi-Stage Assembly Systems Using Genetic Algorithms’, European Journal of Operational Research, 180, 292–308.
  • Rochette, R., and Sadowski, R.P. (1976), ‘A Statistical Comparison of the Performance of Simple Dispatching Rules for Particular Set of Job Shops’, International Journal of Production Research, 14, 63–75.
  • Seidmann, A., Panwalkar, S.S., and Smith, M.L. (1981), ‘Optimal Assignment of Due-Dates for a Single Processor Scheduling Problem’, International Journal of Production Research, 19, 393–399.
  • Seidmann, A., and Smith, M.L. (1981), ‘Due Date Assignment for Production Systems’, Management Science, 27, 571–581.
  • Steiner, G., and Zhang, R. (2011), ‘Minimizing the Weighted Number of Tardy Jobs with Due Date Assignment and Capacity-Constrained Deliveries’, Annals of Operations Research, 191, 171–181.
  • T'kindt, V., and Croce, F.D. (2012), ‘A Note on “Two-Machine Flow-Shop Scheduling with Rejection” and Its Link with Flow-Shop Scheduling and Common Due Date Assignment’, Computers & Operations Research, 39, 3244–3246.
  • Vinod, V., and Sridharan, R. (2011), ‘Simulation Modeling and Analysis of Due-Date Assignment Methods and Scheduling Decision Rules in a Dynamic Job Shop Production System’, International Journal of Production Economics, 129, 127–146.
  • Weeks, J.K. (1979), ‘A Simulation Study of Predictable Due-Dates’, Management Science, 25, 363–373.
  • Weeks, J.K., and Fryer, J.S. (1977), ‘A Methodology for Assignment Minimum Cost Due-Date’, Management Science, 23, 872–881.
  • Xia, Y., Chen, B., and Yue, J. (2008), ‘Job Sequencing and Due Date Assignment in a Single Machine Shop with Uncertain Processing Times’, European Journal of Operational Research, 184, 63–75.
  • Yaghoubi S., Noori, S., and Pourdadashi-komachali, F. (2012), ‘Lead Time Control in Multi-Server Multi-Stage Assembly System’, International Journal of Advanced Manufacturing Technology, 61, 351–368.
  • Yuan, X.M., and Liu, L. (2005), ‘Performance Analysis of Assembly Systems with Unreliable Machines and Finite Buffers’, European Journal of Operational Research, 161, 854–871.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.