References
- Brook, D. and Evans, D. A. (1972). “An Approach to the Probability Distribution of CUSUM Run-Length.” Biometrika 59, pp. 539–549.
- Champ, C. W. and Woodall, W. H. (1987). “Exact Results for Shewhart Control Charts With Supplementary Runs Rules.” Technometrics 29, pp. 393–399.
- Coleman, D. E. (1989). “Generalized Control Charting.” Statistical Process Control in Automated Manufacturing. (J. B. Keats and N. F. Hubele, Eds.). Marcel Dekker, New York, NY, pp. 155–191.
- Duncan, A. J. (1986). Quality Control and Industrial Statistics. 5th Ed. Richard D. Irwin, Homewood, IL.
- Elder, R. S.; Provost, L. P.; and Ecker, O. M. (1981). “U.S. Department of Agriculture Cusum Acceptance Sampling Procedures.” Journal of Quality Technology 13, pp. 59–64.
- Kemp, K. W. (1962). “The Use of Cumulative Sums for Sampling Inspection Schemes.” Applied Statistics 11, pp. 16–31.
- Lucas, J. M. (1985). “Counted Data CUSUMs.” Technometrics 27, pp. 129–144.
- Lucas, J. M. (1989). “Control Schemes for Low Count Levels.” Journal of Quality Technology 21, pp. 199–201.
- Lucas, J. M. and Crosier, R. B. (1982). “Fast Initial Response for CUSUM Quality Control Schemes: Give Your CUSUM a Head Start.” Technometrics 24, pp. 199–205.
- Page, E. S. (1954). “Continuous Inspection Schemes.” Biometrika 41, pp. 100–114.
- Pesotchinsky, L. (1987). “Plans for Very Low Fraction Nonconforming.” Journal of Quality Technology 19, pp. 191–196.
- Vardeman, S. and Ray, D. (1985). “Average Run Lengths for CUSUM Schemes when Observations are Exponentially Distributed.” Technometrics 27, pp. 145–150.