References
- Characterization of Corrosion Products on the Callaway Cycle 9 PWR Core, 1003129, Electric Power Research Institute (2001).
- A. BYERS, “Zinc and CRUD, How They Interact,” presented at the EPRI Fuel Reliability Program WG1 Mtg., Las Vegas, Nevada, September 1, 2005, p. 2 (2005).
- “Effects of Zinc Addition on Mitigation of PWSCC of Alloy 600,” p. 1003522, Electric Power Research Institute (2002).
- “PWR Primary Water Chemistry Guidelines,” Rev. 3, Appendix A, TR-105714, Electric Power Research Institute (1995).
- “PWR Dose Reduction Efforts at Exelon,” Proc. August 2011 EPRI PWR Primary Zinc Addition Workshop, Palo Alto, California, August 2–9, 2011 (2011).
- N. DONCEL et al., “Zinc Addition Experience at Spanish PWR Plant,” Proc. Water Reactor Performance Mtg., China, September 19–21, 2011.
- J. DESHON, “Boron-Induced Offset Anomaly (BOA) Risk Assessment Tool,” Version 3.0, p. 1021227, Electric Power Research Institute (2010).
- E. ABDELHAMEED et al., “Feasibility of Passive Autonomous Frequency Control Operation in a Soluble- Boron-Free Small PWR,” Ann. Nucl. Energy, 116, 131 (2018); https://doi.org/10.1016/j.anucene.2018.02.036.
- “Ulchin Unit 1 Cycle 17 Nuclear Design Report,” KEPCO NF (2009).
- H. KATO et al., “Ultra Cleaning Method and Device Therefor” U.S. patent number 5,467,791 (1995).
- J. DESHON et al., “Fuel Reliability Program Workshop,” Proc. Int. Workshop, Daejeon, Korea, August 13–14, 2009.
- “Evaluation of Fuel Cladding Corrosion and Corrosion Product Deposits from Vandellos 2 Cycle 15: Interim Report Following First Cycle of Zinc Addition,” 1016615, Electric Power Research Institute (2008).