References
- W. ZHUO et al., “Experimental Research on Passive Residual Heat Removal System of Chinese Advanced PWR,” Sci. Technol. Nucl. Install., 2014, 325356 (2014); https://doi.org/10.1155/2014/325356.
- F. PIERRO et al., “Application of REPAS Methodology to Assess the Reliability of Passive Safety Systems,” Sci. Technol. Nucl. Install., 2009, 768947 (2009); https://doi.org/10.1155/2009/768947.
- L. SANTINI, D. PAPINI, and M. E. RICOTTI, “Experimental Characterization of a Passive Emergency Heat Removal System for a GenIII+ Reactor,” Sci. Technol. Nucl. Install., 2010, 864709 (2010); https://doi.org/10.1155/2010/864709.
- D. A. FYNAN and J. H. PARK, “Optimal Working Fluid Charge and Degradation Thresholds for a Closed-Circuit Intermediate Natural Circulation Heat Transport Loop,” Ann. Nucl. Energy, 118, 381 (2018); https://doi.org/10.1016/j.anucene.2018.04.015.
- O. B. SAMOILOV et al., “Integral Nuclear Power Reactor with Natural Coolant Circulation. Investigation of Passive RHR System,” Nucl. Eng. Des., 165, 1–2, 259 (1996); https://doi.org/10.1016/0029-5493(96)01188-0.
- D. A. FYNAN, Y. H. JUNG, and J. H. PARK, “Mission Definition for a Passive Reliability Assessment of SMART Passive Residual Heat Removal System,” Proc. PSA 2017, Pittsburgh, Pennsylvania, September 24–28, 2017, American Nuclear Society (2017).
- G. R. FANJOY, “Pressure Tube Failure—Pickering NGS UNIT 2,” CNS-75, Ontario Hydro (July 1984).
- “Fukushima Nuclear Accident Investigation Report. Interim Report—Supplementary Volume,” Tokyo Electric Power Company, Inc. (Dec. 2, 2011).
- “Evaluation of Operating Conditions of Isolation Condenser, Unit 1, Fukushima Daiichi Nuclear Power Station,” Tokyo Electric Power Company (Nov. 22, 2011).
- M. DERIVAN, “TMI Operators Took Actions They Were Trained to Take,” Atomic Insights Blog (Apr. 11, 2014); https://atomicinsights.com/tmi-operators-took-actions-trained-take/ (current as of Feb. 15, 2020).
- N. MASUDA, “Current Status and Challenges at Fukushima Daiichi Decontamination and Decommissioning,” presented at 2017 IAEA General Conf., Vienna, Austria, September 18, 2017.
- H. AYHAN and C. N. SÖKMEN, “Design and Modeling of the Passive Residual Heat Removal System for VVERs,” Ann. Nucl. Energy, 95, 109 (2016); https://doi.org/10.1016/j.anucene.2016.05.003.
- Y. J. CHUNG et al., “Two Phase Natural Circulation and the Heat Transfer in Passive Residual Heat Removal System of an Integral Type Reactor,” Ann. Nucl. Energy, 33, 3, 262 (2016); https://doi.org/10.1016/j.anucene.2005.09.009.
- Y. J. CHUNG et al., “Validation of the TASS/SMR and MARS Codes for a Natural-Circulation Experiment at the VISTA Facility,” Nucl. Technol., 165, 1, 32 (2009); https://doi.org/10.13182/NT09-A4060.
- Y. J. CHUNG et al., “Thermo-Hydraulic Characteristics of the Helically Coiled Tube and the Condensate Heat Exchanger for SMART,” Ann. Nucl. Energy, 55, 49 (2013); https://doi.org/10.1016/j.anucene.2012.11.026.
- H. S. PARK et al., “Design of the VISTA-ITL Test Facility for an Integral Type Reactor of SMART and a Post-Test Simulation of a SBLOCA Test,” Sci. Technol. Nucl. Install., 2014, 840109 (2014); http://doi.org/10.1155/2014/840109.
- H. S. PARK et al., “An Integral Effect Test of a Complete Loss of Reactor Coolant System Flow Fate for the SMART Design Using the VISTA-ITL Facility and its Simulation with the MARS-KS Code,” J. Nucl. Sci. Technol., 54, 3, 348 (2017); https://doi.org/10.1080/00223131.2016.1273147.
- N. E. TODREAS and M. S. KAZIMI, Nuclear Systems II, Elements of Thermal Hydraulic Design, Chap. 4, Taylor and Francis (2001).
- Y. S. KIM et al., “Investigation of Thermal Hydraulic Behavior of SBLOCA Tests in SMART-ITL Facility,” Ann. Nucl. Energy, 113, 25 (2018); https://doi.org/10.1016/j.anucene.2017.11.013.