73
Views
1
CrossRef citations to date
0
Altmetric
Research Articles

Reliability Evaluation of Complex Nuclear Energy Redundancy Systems with Atypical Time-Distribution Events

, , , , &
Pages 1129-1144 | Received 07 Oct 2022, Accepted 20 Mar 2023, Published online: 27 Apr 2023

References

  • D. MANDELLI et al., “Dynamic PRA Methods to Evaluate the Impact on Accident Progression of Accident Tolerant Fuels,” Nucl. Technol., 207, 3, 389 (2021); https://doi.org/10.1080/00295450.2020.1794234.
  • D. LIU et al., “Cut Sequence Set Generation for Fault Tree Analysis,” Proc. Int. Conf. Embedded Software and Systems, p. 592, Springer, Berlin, Heidelberg (2007).
  • T. SHORTHILL et al., “A Redundancy-Guided Approach for the Hazard Analysis of Digital Instrumentation and Control Systems in Advanced Nuclear Power Plants,” Nucl. Technol., 208, 5, 892 (2022); https://doi.org/10.1080/00295450.2021.1957659.
  • J. B. FUSSELL, “A Formal Methodology for Fault Tree Construction,” Nucl. Sci. Eng., 52, 4, 421 (1973); https://doi.org/10.13182/NSE73-A23308.
  • J. B. DUGAN, S. J. BAVUSO, and M. A. BOYD, “Dynamic Fault-Tree Models for Fault-Tolerant Computer Systems,” IEEE Trans. Reliab., 41, 3, 363 (1992); https://doi.org/10.1109/24.159800.
  • A. LINDHE, T. NORBERG, and L. ROSEN, “Approximate Dynamic Fault Tree Calculations for Modelling Water Supply Risks,” Reliab. Eng. Syst. Saf., 106, 61 (2012); https://doi.org/10.1016/j.ress.2012.05.003.
  • S. BAEK and G. HEO, “Application of Dynamic Fault Tree Analysis to Prioritize Electric Power Systems in Nuclear Power Plants,” Energies, 14, 14, 4119 (2021); https://doi.org/10.3390/en14144119.
  • T. YUGE and S. YANAGI, “Quantitative Analysis of a Fault Tree with Priority AND Gates,” Reliab. Eng. Syst. Saf., 93, 11, 1577 (2008); https://doi.org/10.1016/j.ress.2008.02.016.
  • L. XING, O. TANNOUS, and J. B. DUGAN, “Reliability Analysis of Nonrepairable Cold-Standby Systems Using Sequential Binary Decision Diagrams,” IEEE Trans. Syst. Man. Cybern. A Syst. Hum., 42, 3, 715 (2012); https://doi.org/10.1109/TSMCA.2011.2170415.
  • P. ZHU et al., “A Stochastic Approach for the Analysis of Dynamic Fault Trees with Spare Gates Under Probabilistic Common Cause Failures,” IEEE Trans. Reliab., 64, 3, 878 (2015); https://doi.org/10.1109/TR.2015.2419214.
  • S. WANG et al., “Analytical Calculation and Rapid Simulation of Survival Signatures in Dynamic Fault Trees with Priority-AND Gates,” IEEE Trans. Reliab. (2022); https://doi.org/10.1109/TR.2022.3214975.
  • “Risk Spectrum Analysis Tools. Theory Manual,” Version 3.0.0, Relcon Scandpower AB.
  • D. LIU et al., Quantification of Cut Sequence Set for Fault Tree Analysis,” Proc. Int. Conf. High Performance Computing and Communications, p. 755, Springer, Berlin, Heidelberg (2007).
  • D. GE et al., “Probabilistic Model–Based Multi-Integration Formulas for Quantifying a Generalized Minimal Cut Sequence,” Proc. Inst. Mech. Eng., Part O: J. Risk Reliab., 229, 1, 73 (2015).
  • “Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants,” NUREG/CR-6928, INL/EXT-06-11119, Idaho National Laboratory (2007).
  • T. YUGE and S. YANAGI, “Quantitative Analysis of a Fault Tree with Priority AND Gates,” Reliab. Eng. Syst. Saf., 93, 11, 1577 (2008).
  • D. GUO et al., “Dynamic Reliability Evaluation of Diesel Generator System of One Chinese 1000MWe NPP Considering Temporal Failure Effects,” Front. Energy Res., 9 (2021).
  • K. I. AHN and Y. H. JIN, “A Formal Approach for Quantitative Treatment of Modeling Uncertainties in Safety Analysis,” Nucl. Technol., 116, 2, 146 (1996); https://doi.org/10.13182/NT96-A35296.
  • N. SIU and A. MOSLEH, “Treating Data Uncertainties in Common-Cause Failure Analysis,” Nucl. Technol., 84, 3, 265 (1989); https://doi.org/10.13182/NT89-A34210.
  • M. HARUNUZZAMAN and T. ALDEMIR, “Optimization of Standby Safety System Maintenance Schedules in Nuclear Power Plants,” Nucl. Technol., 113, 3, 354 (1996); https://doi.org/10.13182/NT96-A35215.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.