REFERENCES
- Ragsdell , K. M. 1994 . Total Quality Management. . Mfng Rev. , 7 : 194
- Tracy , M. 1994 . Achieving Agile Manufacturing: Part II. . Automot. Engng , 102 : 13
- Kurt Salmon Associates. 1994 . ‘The Quick Response Handbook’, Supplement to . Apparel Industry Magazine ,
- McCullough , T. 1993 . ‘Flexible Short Run Yarn and Fabric Formation: Yarn Costs and Availability’ Georgia Institute of Technology : a technical report submitted to the School of Textile and Fiber Engineering .
- Vollman , E. T. 1992 . Manufacturing Planning and Control Systems’, , 3rd edition Boston, MA, , USA : Irwin .
- Johnson , S. M. 1954 . Optimal Two and Three Stage Production Schedules with Setup Time Included. . Nav. Res. Logist. Q. , : 61
- Baker , K. R. 1990 . Scheduling Groups of Jobs in the Two-machine Flow Shop. . Math. Comput. Modelling , 13 ( No. 3 ) : 29
- Campbell , H. G. 1970 . A Heuristic Algorithm for the n Job m Machine Sequencing Problem . Manage. Sci. , 16 : 630
- Banks , J. and Carson , J. 1984 . ‘Discrete-event System Simulation’ Englewood Cliffs, NJ, , USA : Prentice Hall . ISBN 0–13-215582–6
- Pistikopoulos , E. N. and Grossman , I. E. 1989 . Optimal Retrofit Design for Improving Process Flexibility in Nonlinear Systems - I. Fixed Degree of Flexibility. . Comput. Chem. Engng , 13 : 1003