Publication Cover
Vehicle System Dynamics
International Journal of Vehicle Mechanics and Mobility
Latest Articles
187
Views
0
CrossRef citations to date
0
Altmetric
Research Article

An exploration of the super-critical speed dynamic behaviours of the pantograph-catenary system

ORCID Icon, & ORCID Icon
Received 11 Jan 2023, Accepted 22 Nov 2023, Published online: 11 Dec 2023

References

  • Bruni S, Bucca G, Carnevale M, et al. Pantograph–catenary interaction: recent achievements and future research challenges. Int J Rail Transp. 2018;6:57–82.
  • Bruni S, Ambrosio J, Carnicero A, et al. The results of the pantograph-catenary interaction benchmark. Veh Syst Dyn. 2015;53:412–435.
  • Wang J, Mei G, Lu L. An improved full Fourier series method approaching the stitched catenary in high-speed railway. Int J Rail Transp. 2022:1–27. doi: 10.1080/23248378.2022.2129492
  • Yang CJ, Zhang WH, Zhang J, et al. Static form-finding analysis of a railway catenary using a dynamic equilibrium method based on flexible multibody system formulation with absolute nodal coordinates and controls. Multibody Syst Dyn. 2017;39(3):221–247.
  • Tur M, García E, Baeza L, et al. A 3D absolute nodal coordinate finite element model to compute the initial configuration of a railway catenary. Eng Struct. 2014;71:234–243.
  • Daocharoenporn S, Mongkolwongrojn M, Kulkarni S, et al. Pantograph/catenary wear using multibody system dynamic algorithms. ASME/IEEE Joint Rail Conference. American Society of Mechanical Engineers 2020;83587:V001T01A002.
  • Daocharoenporn S, Mongkolwongrojn M, Kulkarni S, et al. Prediction of the pantograph/catenary wear using nonlinear multibody system dynamic algorithms. J Tribol. 2019;141(5):051603.
  • Lee K, Cho Y, Chung J. Dynamic contact analysis of a tensioned beam with a moving mass-spring system. J Sound Vib. 2012;331:2520–2531.
  • Anastasio D, Fasana A, Garibaldi L, et al. Analytical investigation of railway overhead contact wire dynamics and comparison with experimental results. Mech Syst Signal Process. 2019;116:277–292.
  • Gil J, Gregori S, Tur M, et al. Analytical model of the pantograph–catenary dynamic interaction and comparison with numerical simulations. Veh Syst Dyn. 2022;60(1):132–155.
  • Roy S, DasGupta A, Chakraborty G. Dynamic interaction between multiple pantographs sliding on an overhead conductor wire: a multibody and wave-based approach. Arch Appl Mech. 2022;92:45–72.
  • Metrikine AV, Bosch AL. Dynamic response of a two-level catenary to a moving load. J Sound Vib. 2006;292:676–693.
  • Wilk A, Gelman L, Judek S, et al. Novel method of estimation of inertial and dissipative parameters of a railway pantograph model. Veh Syst Dyn. 2022;60:2413–2435.
  • Gregori S, Tur M, Tarancón JE, et al. Stochastic Monte Carlo simulations of the pantograph–catenary dynamic interaction to allow for uncertainties introduced during catenary installation. Veh Syst Dyn. 2019;57(4):471–492.
  • Wang J, Mei G, Lu L. Analysis of the pantograph's mass distribution affecting the contact quality in high-speed railway. Int J RAIL Transp. 2023;11(4):529–551.
  • Song D, Jiang Y, Zhang W. Dynamic performance of a pantograph–catenary system with consideration of the contact surface. Proc Inst Mech Eng Part F J Rail Rapid Transit. 2018;232:262–274.
  • Zou D, Zhou N, Rui Ping L, et al. Experimental and simulation study of wave motion upon railway overhead wire systems. Proc Inst Mech Eng Part F J Rail Rapid Transit. 2017;231(8):934–944.
  • Vo Van O, Massat JP, Balmes E. Waves, modes and properties with a major impact on dynamic pantograph-catenary interaction. J Sound Vib. 2017;402:51–69.
  • Song Y, Antunes P, Pombo J, et al. A methodology to study high-speed pantograph-catenary interaction with realistic contact wire irregularities. Mech Mach Theory. 2020;152:103940.
  • Song Y, Rønnquist A, Jiang T, et al. Identification of short-wavelength contact wire irregularities in electrified railway pantograph–catenary system. Mech Mach Theory. 2021;162:104338.
  • Yao Y, Zou D, Zhou N, et al. A study on the mechanism of vehicle body vibration affecting the dynamic interaction in the pantograph–catenary system. Veh Syst Dyn. 2021;59(9):1335–1354.
  • Song Y, Wang Z, Liu Z, et al. A spatial coupling model to study dynamic performance of pantograph-catenary with vehicle-track excitation. Mech Syst Signal Process. 2021;151:107336.
  • Shimizu M, Fujii Y. Improvement of structure of contact wire on overlap sections of Shinkansen[J]. Q Rep RTRI. 2000;41(4):159–162.
  • Mei G, Zhang W, Zhao H, et al. A hybrid method to simulate the interaction of pantograph and catenary on overlap span. Veh Syst Dyn. 2006;44(sup1):571–580.
  • Gregori S, Gil J, Tur M, et al. Analysis of the overlap section in a high-speed railway catenary by means of numerical simulations. Eng Struct. 2020;221:110963.
  • Yao Y, Yang Z, Wang J, et al. Analysis of contact force and uplift of pantograph–catenary system in overlap section based on numerical simulations and experimental tests. Veh Syst Dyn. 2023;61(10):2492–2515.
  • Song Y, Rønnquist A, Jiang T, et al. Railway pantograph-catenary interaction performance in an overlap section: Modelling, validation and analysis[J]. J Sound Vib. 2023;548:117506.
  • Antunes P, Ambrósio J, Pombo J, et al. A new methodology to study the pantograph–catenary dynamics in curved railway tracks. Veh Syst Dyn. 2020;58:425–452.
  • Ambrósio J, Antunes P, Pombo J, et al. Pantograph-catenary interaction in curved railway tracks. Advances in Engineering Materials, Structures and Systems: Innovations, Mechanics and Applications. CRC Press; 2019. p. 1791–1798.
  • Li R, Zhang W, Ning Z, et al. Influence of a high-speed train passing through a tunnel on pantograph aerodynamics and pantograph-catenary interaction. Proc Inst Mech Eng Part F J Rail Rapid Transit. 2017;231(2):198–210.
  • Song Y, Zhang M, Øiseth O, et al. Wind deflection analysis of railway catenary under crosswind based on nonlinear finite element model and wind tunnel test. Mech Mach Theory. 2022;168:104608.
  • Song Y, Liu Z, Wang H, et al. Analysis of the galloping behaviour of an electrified railway overhead contact line using the non-linear finite element method. Proc Inst Mech Eng Part F J Rail Rapid Transit. 2018;232(10):2339–2352.
  • Liu Z, Jönsson PA, Stichel S, et al. On the implementation of an auxiliary pantograph for speed increase on existing lines. Veh Syst Dyn. 2016;54:1077–1097.
  • Zhu M, Zhang SY, Jiang JZ, et al. Enhancing pantograph-catenary dynamic performance using an inertance-integrated damping system. Veh Syst Dyn. 2022;60:1909–1932.
  • Sanchez-Rebollo C, Jimenez-Octavio JR, Carnicero A. Active control strategy on a catenary-pantograph validated model. Veh Syst Dyn. 2013;51(4):554–569.
  • Santamato G, Chiaradia D, Solazzi M, et al. Detecting early damages in the railway pantograph mechanism: a multiple excitation approach for the frequency domain[J]. Veh Syst Dyn. 2023:1–22. doi: 10.1080/00423114.2023.2242529
  • Cho CJ, Park Y. New monitoring technologies for overhead contact line at 400 km·h−1. Engineering. 2016;2:360–365.
  • Lee JH, Park TW, Oh HK, et al. Analysis of dynamic interaction between catenary and pantograph with experimental verification and performance evaluation in new high-speed line. Veh Syst Dyn. 2015;53:1117–1134.
  • Kwon SY, Cho YH, Lee K, et al. Simulation and testing of the effect of current collection performance according to Pre-sag in 400 km/h Overhead Contact Lines. J Korean Soc Railw. 2016;19(3):288–296.
  • Cho YH, Park Y, Jung HJ. Implementation technique of real-time monitoring system for high-speed rail contact wire with high tension. Trans Korean Inst Electr Eng. 2015;64(8):1256–1261.
  • Mei G, Wang J, Zhao C, et al. Research on aerodynamic experiment and dynamic performance of new developed V500 pantograph at 400 km/h or higher. Dyn Veh Roads Tracks - Proc 24th Symp Int Assoc Veh Syst Dyn IAVSD 2015. 2016;919–926.
  • Song Y, Duan F, Liu Z. Analysis of critical speed for high-speed railway pantograph-catenary system. IEEE Trans Veh Technol. 2022;71:3547–3555.
  • Roy S, Chakraborty G, DasGupta A. Coupled dynamics of a viscoelastically supported infinite string and a number of discrete mechanical systems moving with uniform speed. J Sound Vib. 2018;415:184–209.
  • EN 50318: Railway applications - Current collection systems - Validation of simulation of the dynamic interaction between pantograph and overhead contact line. 2018.
  • Kia SH, Bartolini F, Mpanda-Mabwe A, et al. Pantograph-catenary interaction model comparison. IECON 2010-36th annual conference on IEEE industrial electronics society. IEEE; 2010. p. 1584–1589.
  • EN 50367: Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead line; 2012.
  • Mei G, Wang J, Zhao C, et al. Research on aerodynamic experiment and dynamic performance of new developed V500 pantograph at 400 km/h or higher. Dyn Veh Roads Tracks - Proc 24th Symp Int Assoc Veh Syst Dyn IAVSD 2015; 2016.
  • EN 50119: Railway applications -Fixed installations - Electric traction overhead contact lines; 2009.
  • Kiessling F, Rainer P, Schmieder A, et al. Contact lines for electric railways: planning, design, implementation, maintenance. Third edition. Paris: Publicis; 2018.
  • EN 50149: Railway applications — Fixed installations — Electric traction — Copper and copper alloy grooved contact wires; 2001.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.