1,251
Views
22
CrossRef citations to date
0
Altmetric
PAPERS

A lean‐agile model of homebuilders’ production systems

, &
Pages 25-35 | Received 07 Dec 2009, Accepted 05 Oct 2010, Published online: 27 Jan 2011

References

  • Arditi , D. , Tokdemir , O.B. and Suh , K. 2001 . Effect of learning on line‐of‐balance scheduling . International Journal of Project Management , 19 (5) : 265 – 77 .
  • Ballard , G. 2000 . “ The Last Planner™ system of production control, PhD dissertation ” . School of Civil Engineering, University of Birmingham .
  • Ballard , G. Cycle time reduction in home building . Proceedings of 9th Annual Conference on Lean Construction . August 6–8 , Singapore. pp. 1 – 9 .
  • Banks , J. , Carson , J.S. , Nelson , B.L. and Nicol , D.M. 2000 . Discrete Event Systems Simulation, , 3rd edn , Englewood Cliffs, NJ : Prentice Hall .
  • Bashford , H.H. , Sawhney , A. , Walsh , K.D. and Kot , K. 2003 . Implications of even flow production methodology for US housing industry . Journal of Construction Engineering and Management , 129 (3) : 330 – 7 .
  • Bashford , H.H. , Walsh , K.D. and Sawhney , A. 2005 . Production system loading‐cycle time relationship in residential construction . Journal of Construction Engineering and Management , 131 (1) : 15 – 22 .
  • Bergström , M. and Stehn , L. 2005 . Benefits and disadvantages of ERP in industrialised timber frame housing in Sweden . Construction Management and Economics , 23 : 831 – 8 .
  • Burney , T. 2009 . “ Builders who can’t sell, lease ” . In Builder Magazine (NAHB), available at http://www.builderonline.com/economic-conditions/builders-who-cant-sell-lease.aspx (accessed 17 November 2010)
  • Caldeira , E. 1999 . Even flow construction . Professional Builder , 64 (16) : 40
  • Chase , W. and Brown , F. 1992 . General Statistics, , 2nd edn , New York : Wiley .
  • Childerhouse , P. , Hong‐Minh , S.M. and Naim , M.M. House building supply chain strategies: selecting the right strategy to meet customer requirements . Proceedings of the 8th Annual Conference on Lean Construction . July 17–19 , Brighton, UK. available at http://www.iglc.net/conferences/2000/Papers/childerhouseetal.pdf
  • Christopher , M. 2005 . Logistics and Supply Chain Management: Creating Value‐adding Networks, , 3rd edn , Harlow : Financial Times/Prentice Hall .
  • Hajjar , D. and AbouRizk , S.M. 2002 . Unified modeling methodology for construction simulation . Journal of Construction Engineering and Management , 128 (2) : 174 – 85 .
  • Halpin , D.W. and Riggs , L. 1992 . Planning and Analysis of Construction Operations , New York : Wiley InterScience .
  • Hinze , J. and Tracy , A. 1994 . The contractor–subcontractor relationship: the subcontractor’s view . Journal of Construction Engineering and Management , 120 (2) : 274 – 87 .
  • Hoekstra , S. and Romme , J. 1992 . Integrated Logistics Structures: Developing Customer Oriented Goods Flow , London : McGraw‐Hill .
  • Höök , M. 2008 . “ Lean culture in industrialized housing: a study of timber volume element prefabrication, PhD thesis ” . Luleå, , Sweden : Luleå University of Technology .
  • Jones , D.T. and Womack , J. 2002 . Seeing the Whole: Mapping the Extended Value Stream , Brookline, MA : The Lean Enterprise Institute .
  • Kraemer , K.M. , Henrich , G. , Koskela , L. and Kagioglou , M. How construction flows have been understood in lean construction . Paper presented at the 4th International Research Symposium (SCRI), University of Salford . March 26–27 , Salford, UK. pp. 121 – 32 .
  • Naim , M. and Barlow , J. 2003 . An innovative supply chain strategy for customized housing . Construction Management and Economics , 21 : 593 – 602 .
  • National Association of Home Builders Research Center . 2006 . Going with the flow . ToolBase News , 11 (4)
  • Naylor , J.B. , Naim , M.M. and Berry , D. 1999 . Leagility: integrating the lean and agile manufacturing paradigms in the total supply chain . International Journal of Production Economics , 62 (1–2) : 107 – 18 .
  • Rother , M. and Shook , J. 1999 . Learning to See: Value Stream Mapping to Add Value and Eliminate Muda , Brookline, MA : Lean Enterprise Institute .
  • Roy , R. and Cochrane , S.P. 1999 . Development of a customer‐focused strategy in speculative house building . Construction Management and Economics , 17 : 777 – 87 .
  • Roy , R. , Brown , J. and Gaze , C. 2003 . Re‐engineering the construction process in the speculative house building sector . Construction Management and Economics , 21 : 137 – 46 .
  • Sacks , R. and Harel , M. 2006 . An economic game theory model of subcontractor resource allocation behaviour . Construction Management and Economics , 24 : 869 – 81 .
  • Shi , J. 2002 . Three methods for verifying and validating the simulation of a construction operation . Construction Management and Economics , 20 : 483 – 91 .
  • Smalley , A. 2004 . Creating Level Pull , Brookline, MA : The Lean Enterprise Institute .
  • Walsh , K.D. , Sawhney , A. and Bashford , H.H. 2007 . Production equations for unsteady‐state construction processes . Journal of Construction Engineering and Management , 133 (3) : 254 – 61 .
  • Willenbrock , J.H. 1998 . Residential Building Design and Construction , Upper Saddle River, NJ : Prentice Hall .
  • Winch , G.M. 1989 . The construction firm and the construction project: a transaction cost approach . Construction Management and Economics , 7 : 331 – 45 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.