956
Views
15
CrossRef citations to date
0
Altmetric
PAPERS

Progress monitoring of construction projects using pattern recognition techniques

&
Pages 355-370 | Received 23 Mar 2010, Accepted 10 Jan 2011, Published online: 01 Jun 2011

References

  • Abd Majid , M.Z. , Memon , Z.A. and Mustaffar , M. Conceptual digital monitoring model for evaluating the progress of work . CONVR 2004: Conference on Construction Applications of Virtual Reality . September 14–15 , Lisbon , Portugal. pp. 161 – 6 .
  • Abdel‐Wahhab , O. and Elazouni , A. Progress monitoring of construction projects using statistical pattern recognition . Construction Research Congress . May 8–10 , Banff , Canada. Vol. II , pp. 1204 – 13 .
  • Abdel‐Wahhab , O. and Sid‐Ahmed , M.A. 1997 . A new scheme for training feed‐forward neural networks . Pattern Recognition , 30 (3) : 519 – 24 .
  • Abeid , J. , Allouche , E. , Arditi , D. and Hayman , M. 2003 . PHOTO‐NET II: a computer based monitoring system applied to project management . Automation in Construction , 12 (5) : 603 – 16 .
  • Barraza , G.A. , Back , E. and Mata , F. 2000 . Probabilistic monitoring of project performance using SS‐curves . Journal of Construction Engineering and Management , 126 (2) : 142 – 8 .
  • Brilakis , I. and Soibelman , L. 2006 . Multimodal image retrieval from construction databases and model‐based systems . Journal of Construction Engineering and Management , 132 (7) : 777 – 85 .
  • Cheng , M. and Chen , J. 2002 . Integrating barcode and GIS for monitoring construction progress . Automation in Construction , 11 (1) : 23 – 33 .
  • Davidson , I.N. and Skibniewski , M.J. 1995 . Simulation of automated data collection in buildings . ASCE Journal of Computing in Civil Engineering , 9 : 9 – 20 .
  • Domingos , P. and Pazzani , M. 1997 . On the optimality of the simple Bayesian classifier under zero‐one loss . Machine Learning , 29 : 103 – 37 .
  • Elazouni , A. and Abdel‐Wahhab , O. Progress monitoring of erection of off‐site produced units using pattern recognition . Proceedings of Construction Management and Economics 25 Conference, University of Reading . July 16–18 , UK.
  • Elazouni , A. and Abdel‐Wahhab , O. Using statistical pattern recognition to monitor the erection progress of off‐site produced units . Paper presented at the 7th joint Conference of APSEC and 2nd EACEF . August 4–6 , Langkawi , Malaysia.
  • Elazouni , A. and Abdel‐Wahhab , O. Progress monitoring of construction projects using neural networks pattern recognition . Paper presented at the Construction Research Congress . April 5–7 , Seattle , USA.
  • Ergena , E. , Akinci , B. and Sacks , R. 2007 . Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS . Automation in Construction , 16 : 354 – 67 .
  • Golparvar‐Fard , M. , Pena‐Mora , F. , Arboleda , A. and Lee , S‐H. 2009a . Visualization of construction progress monitoring with 4D simulation model overlaid on time‐lapsed photographs . Journal of Computing in Civil Engineering , 23 (6) : 391 – 404 .
  • Golparvar‐Fard , M. , Savarese , S. and Pena‐Mora , F. Interactive visual construction progress monitoring with D4AR‐4D augmented reality‐ models . Paper presented at the Construction Research Congress . April 5–7 , Seattle , USA.
  • Hiroshi , N. and Nobuoh , H. Filing of construction photos linked with database . 5th International Conference on Computing in Civil and Building Engineering . June 7–9 , Anaheim , California . Vol. 1 , pp. 718 – 21 . ASCE .
  • Kotsiantis , S. and Pintelas , P. Increasing the classification accuracy of simple Bayesian classifier . Lecture Notes in Artificial Intelligence AIMSA 2004 . September 2–4 , Varna , Bulgaria. Vol. 3192 , pp. 198 – 207 . Springer‐Verlag .
  • Kubicki , S. , Halin , G. and Bignon , J.C. Assistance to building construction coordination by image . ECPPM Conference . March 28 , Istanbul , Turkey. Edited by: Dikbas , A. and Scherer , R.
  • Memon , Z.A. , Abd Majid , M.Z. and Mustaffar , M. An automatic project progress monitoring model by integrating auto CAD and digital photos . International Conference on Computing in Civil Engineering . July 12–15 , Cancun , Mexico. pp. 1605 – 17 . ASCE .
  • Nassar , K.M. , Gunnarsson , H.G. and Hegab , M.Y. 2005 . Using Weibull analysis for evaluation of cost and schedule performance . Journal of Construction Engineering and Management , 131 (12) : 1257 – 62 .
  • Navon , R. 2005 . Automated project performance control of construction projects . Automation in Construction , 14 : 467 – 76 .
  • Navon , R. and Shpatnitsky , Y. 2005 . A model for automated monitoring of road construction . Construction Management and Economics , 23 : 941 – 51 .
  • Poku , S.E. and Arditi , D. 2006 . Construction scheduling and progress control using geographical information systems . Journal of Computing in Civil Engineering , 20 (5) : 351 – 60 .
  • Quiñones‐Rozo , C. , Hashash , Y. and Liu , L. 2008 . Digital image reasoning for tracking excavation activities . Automation in Construction , 17 (5) : 608 – 22 .
  • Rebolj , D. , Čuš Babič , N. , Magdič , A. , Podbreznik , P. and Pšunder , M. 2008 . Automated construction activity monitoring system . Advanced Engineering Informatics , 22 : 493 – 503 .
  • Riley , D. and Whitesides , J. 1999 . Implementing digital image photography in the building industry . Journal of Construction Education , 4 (2) : 162 – 74 .
  • Roh , S. , Pena‐Mora , F. , Golparvar‐Fard , M. and Han , S.‐U. Visualization application for interior progress monitoring in 3D environment . Paper presented at the Construction Research Congress . April 5–7 , Seattle , USA.
  • Russell , A. and Fayek , A. 1994 . Automated corrective action selection assistant . Journal of Construction Engineering and Management , 120 (1) : 11 – 33 .
  • Sacks , R. , Navon , R. and Goldschmidt , E. 2003 . Building project model support for automated labor monitoring . Journal of Computing in Civil Engineering , 17 (1) : 19 – 27 .
  • Sacks , R. , Navon , R. , Brodetskaia , I. and Shapira , A. 2005 . Feasibility of automated monitoring of lifting equipment in support of project control . Journal of Construction Engineering and Management , 131 (5) : 604 – 14 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.