1,209
Views
9
CrossRef citations to date
0
Altmetric
Articles

Supporting financial decision-making based on time value of money with singularity functions in cash flow models

Pages 238-253 | Received 16 Jul 2012, Accepted 13 Nov 2012, Published online: 05 Mar 2013

References

  • Abido , M.M. and Elazouni , A.M. 2011 . Multiobjective evolutionary finance-based scheduling: entire projects’ portfolio . Journal of Computing in Civil Engineering , 25 ( 1 ) : 85 – 97 .
  • Ali , M.M. and Elazouni , A.M. 2009 . Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities . Construction Management and Economics , 27 ( 9 ) : 839 – 856 .
  • Ammar , M.A. 2011 . Optimization of project time-cost trade-off problem with discounted cash flows . Journal of Construction Engineering and Management , 137 ( 1 ) : 65 – 71 .
  • Au , T. 1988 . Profit measures and methods of economic analysis for capital project selection . Journal of Management in Engineering , 4 ( 3 ) : 217 – 228 .
  • Berlekamp, E.R., Conway, J.H. and Guy, R.K. (2001) Winning Ways for Your Mathematical Plays: Volume 1, 2nd edn, A.K. Peters, Natick, MA.
  • Bourne, M., Neely, A. and Heyns, H. (2002) Lore reform. Financial Management, January, 23.
  • Chen , H.-L. , O’Brien , W.J. and Herbsman , Z.J. 2005 . Assessing the accuracy of cash flow models: the significance of payment conditions . Journal of Construction Engineering and Management , 131 ( 6 ) : 669 – 676 .
  • Chen , W.-N. , Zhang , J. , Chung , H.S.-H. , Huang , R.-Z. and Liu , O. 2010 . Optimizing discounted cash flows in project scheduling—an ant colony optimization approach . IEEE Transactions on Systems, Man, and Cybernetics, Part C: Applications and Reviews , 40 ( 1 ) : 64 – 77 .
  • Cui , Q. , Hastak , M. and Halpin , D.W. 2010 . Systems analysis of project cash flow management strategies . Construction Management and Economics , 28 ( 4 ) : 361 – 376 .
  • Duffy , G.A. , Oberlender , G.D. and Jeong , D.H.S. 2011 . Linear scheduling model with varying production rates . Journal of Construction Engineering and Management , 137 ( 8 ) : 574 – 582 .
  • Elazouni , A.M. 2009 . Heuristic method for multi-project finance-based scheduling . Construction Management and Economics , 27 ( 2 ) : 199 – 211 .
  • Elazouni , A.M. and Metwally , F.G. 2005 . Finance-based scheduling: tool to maximize project profit using improved genetic algorithms . Journal of Construction Engineering and Management , 131 ( 4 ) : 400 – 412 .
  • Fan , S.-L. and Tserng , H.P. 2006 . Object-oriented scheduling for repetitive projects with soft logics . Journal of Construction Engineering and Management , 132 ( 1 ) : 35 – 48 .
  • Fisher , F.M. and McGowan , J.J. 1983 . On the misuse of accounting rates of return to infer monopoly profits . American Economic Review , 73 ( 1 ) : 82 – 97 .
  • Graham , J.R. and Harvey , C.R. 2001 . The theory and practice of corporate finance. evidence from the field . Journal of Financial Economics , 60 ( 2–3 ) : 187 – 243 .
  • Hajdasinski , M.M. 2004 . The internal rate of return (IRR) as a financial indicator . The Engineering Economist , 49 ( 2 ) : 185 – 197 .
  • Hegazy , T. and Ersahin , T. 2001 . Simplified spreadsheet solutions. I: Subcontractor information system . Journal of Construction Engineering and Management , 127 ( 6 ) : 461 – 468 .
  • Howell , R.A. 2002 . Tying free cash flows to market valuations . Financial Executive , 18 ( 3 ) : 17 – 19 .
  • Iverson , K.E. 1962 . A Programming Language , New York , NY : John Wiley & Sons .
  • Jacobson , W.G. and Chinn , F.D. 1968 . Elementary Functions , Morristown , NJ : Silver Burdett Company .
  • Kenley , R. 2003 . Financing Construction: Cash Flows and Cash Farming , New York , NY : Spon Press .
  • Kennedy , W.F. and Plath , D.A. 1994 . A return-based alternative to IRR evaluations . Healthcare Financial Management , 48 ( 3 ) : 38 – 49 .
  • Lazonick , W. and O’Brien , M. 2000 . Maximizing shareholder value: a new ideology for corporate governance . Economy and Society , 29 ( 1 ) : 13 – 35 .
  • Liu , S.-S. and Wang , C.-J. 2008 . Resource-constrained construction project scheduling model for profit maximization considering cash flow . Automation in Construction , 17 ( 8 ) : 966 – 974 .
  • Liu , S.-S. and Wang , C.-J. 2009 . Two-stage profit optimization model for linear scheduling problems considering cash flow . Construction Management and Economics , 27 ( 11 ) : 1023 – 1037 .
  • Liu , S.-S. and Wang , C.-J. 2010 . Profit optimization for multiproject scheduling problems considering cash flow . Journal of Construction Engineering and Management , 136 ( 12 ) : 1268 – 1278 .
  • Longmore , D.R. 1989 . The persistence of the payback method: a time-adjusted decision rule perspective . Engineering Economist , 34 ( 3 ) : 185 – 194 .
  • Lucko , G. 2007 . “ Flexible modeling of linear schedules for integrated mathematical analysis ” . In Proceedings of the 2007 39th Winter Simulation Conference, Washington, DC, 9–12 December , Edited by: Henderson , S.G. , Biller , B. , Hsieh , M.-H. , Shortle , J. , Tew , J.D. and Barton , R.R. 2159 – 2167 . Piscataway , NJ : Institute of Electrical and Electronics Engineers .
  • Lucko, G. (2008) Analysis of linear schedules with singularity functions versus critical path method, in Plotnick, F.L. (ed.) Proceedings of the 2008 5th Project Management Institute—College of Scheduling Annual Conference, Chicago, Illinois, 4–7 May, Project Management Institute, Newtown Square, PA.
  • Lucko , G. 2009 . Productivity scheduling method: linear schedule analysis with singularity functions . Journal of Construction Engineering and Management , 135 ( 4 ) : 246 – 253 .
  • Lucko, G. and Thompson, R.C. (2010) Derivation and assessment of interest in cash flow calculations for time-cost optimizations in construction project management. Proceedings of the 2010 42nd Winter Simulation Conference, eds. Johansson, B., Jain, S., Montoya-Torres, J., Hugan, J. and Yücesan, E. Baltimore, Maryland, 5-8 December, Institute of Electrical and Electronics Engineers, Piscataway, NJ, pp. 3037–3048.
  • Lucko , G. 2011a . Integrating efficient resource optimization and linear schedule analysis with singularity functions . Journal of Construction Engineering and Management , 137 ( 1 ) : 45 – 55 .
  • Lucko , G. 2011b . Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing . Journal of Construction Engineering and Management , 137 ( 7 ) : 523 – 535 .
  • Lucko, G. (2012) Improving Combined Time-Cost Forecasting Capabilities for Contractors, Research Report, ELECTRI International—The Foundation for Electrical Construction, Bethesda, MD.
  • Macaulay , W.H. 1919 . Note on the deflection of beams . Messenger of Mathematics , 48 ( 9 ) : 129 – 130 .
  • McDaniel , W.R. , McCarty , D.E. and Jessell , K.A. 1988 . Discounted cash flow with explicit reinvestment rates: tutorial and extension . Financial Review , 23 ( 3 ) : 369 – 385 .
  • Miles , J.A. and Ezzell , J.R. 1980 . The weighted average cost of capital, perfect capital markets, and project life: a clarification . Journal of Financial and Quantitative Analysis , 15 ( 3 ) : 719 – 730 .
  • Newnan , D.G. , Eschenbach , T.G. and Lavelle , J.P. 2004 . Engineering Economic Analysis , 9th edn , New York , NY : Oxford University Press .
  • O’Brien , J.J. and Plotnick , F.L. 2006 . CPM in Construction Management , 6th edn , New York , NY : McGraw-Hill .
  • Park , M. , Chu , Y. , Lee , H.-S. and Kim , W. 2009 . Evaluation methods for construction projects . Journal of Civil Engineering and Management , 15 ( 4 ) : 349 – 359 .
  • Pinder , J.P. and Marucheck , A.S. 1996 . Using discounted cash flow heuristics to improve project net present value . Journal of Operations Management , 14 ( 3 ) : 229 – 240 .
  • Ranasinghe , M. 1996 . Total project cost: a simplified model for decision makers . Construction Management and Economics , 14 ( 6 ) : 497 – 505 .
  • Reider , R. and Heyler , P.B. 2003 . Managing Cash Flow: An Operational Focus , Hoboken , NJ : John Wiley and Sons .
  • Ross , S.A. , Westerfield , R.W. and Jordan , B.D. 2000 . Fundamentals of Corporate Finance , 5th edn , Boston , MA : Irwin/McGraw-Hill .
  • Senouci , A.B. and El-Rayes , K. 2009 . Time-profit trade-off analysis for construction projects . Journal of Construction Engineering and Management , 135 ( 8 ) : 718 – 725 .
  • Setzer , S. 2009 . Slow payment is sapping contractors’ strength: subs and GCs walk a fine line between getting paid and continuing to work . Engineering News-Record , 262 ( 21 ) : 20
  • Shull , D.M. 1992 . Efficient capital project selection through a yield-based capital budgeting technique . The Engineering Economist , 38 ( 1 ) : 1 – 18 .
  • Tamimi , S. and Diekmann , J.E. 1988 . Soft logic in network analysis . Journal of Computing in Civil Engineering , 2 ( 3 ) : 289 – 300 .
  • Tanchoco , J.M.A. , Buck , J.R. and Leung , L.C. 1981 . Modeling and discounting of continuous cash flows under risk . Engineering Costs and Production Economics , 5 ( 3–4 ) : 205 – 216 .
  • Wang , W.-C. 2005 . Impact of soft logic on the probabilistic duration of construction projects . International Journal of Project Management , 23 ( 8 ) : 600 – 610 .
  • Warszawski , A. 2003 . Parametric analysis of the financing cost in a building project . Construction Management and Economics , 21 ( 5 ) : 447 – 459 .
  • Weisstein, E.W. (2012) Natural logarithm. MathWorld—A Wolfram Web Resource, Wolfram Research, Champaign, IL, available at http://mathworld.wolfram.com/NaturalLogarithm.html (accessed 16 May 2012).
  • Zhang , D. 2005 . A different perspective on using multiple internal rates of return: the IRR parity technique . The Engineering Economist , 50 ( 4 ) : 327 – 335 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.