Effects of the location-based management system on production rates and productivity

, &
Pages 608-624 | Received 16 Oct 2012, Accepted 06 Oct 2013, Published online: 05 Feb 2014

References

  • AlSehaimi, A. and Koskela, L. (2008) What can be learned from studies on delay in construction?, in Tzortzopoulos, P. and Kagioglou, M. (eds) Proceedings of the 16th Annual Conference of the International Group for Lean Construction, Manchester, 15–17 July, pp. 95–106.
  • Arditi, D., Tokdemir, O.B. and Suh, K. (2001) Effect of learning on line-of-balance scheduling, International Journal of Project Management, 19(5), 265–77.
  • Arditi, D., Tokdemir, O.B. and Suh, K. (2002) Challenges in line-of-balance scheduling, Journal of Construction Engineering and Management, 128(6), 545–56.
  • Ballard, G. (2000) The Last Planner™ System of production control, Doctoral thesis, University of Birmingham, School of Civil Engineering, Birmingham.
  • Ballard, G. and Howell, G. (1998) Shielding production: essential step in production control, Journal of Construction Engineering and Management, 124(1), 11–17.
  • El-Rayes, K. and Moselhi, O. (1998) Resource-driven scheduling of repetitive activities, Construction Management and Economics, 16(4), 433–46.
  • Evinger, J. Mouflard, C. and Seppänen, O. (2013) Productivity effects of starting as early as possible in hospital construction, in Formoso, C. and Tzortzopoulos, P. (eds) Proceedings of the 21st Annual Conference of the International Group for Lean Construction, Fortaleza, Brazil, 31 July–2 August, pp. 689–98.
  • Galloway, P. (2006) CPM scheduling: how industry views its use, Cost Engineering, 48(1), 24–9.
  • Kala, T., Mouflard, C. and Seppänen, O. (2012) Production control using location-based management system on a hospital construction project, in Tommelein, I.D. and Pasquire, C. (eds) Proceedings of the 20th Annual Conference of the International Group for Lean Construction, San Diego, CA, 18–20 July, available at http://iglc.net/?page_id=277 (accessed 23 October 2013).
  • Kelley, J. and Walker, M. (1959) Critical-path planning and scheduling, in Heart, F. (ed.) Proceedings of the Eastern Joint Computer Conference, New York, 1–3 December, pp. 160–73.
  • Kenley, R. (2005) Dispelling the complexity myth: founding lean construction on location-based planning, in Kenley, R. (ed.) Proceedings of the 13th Annual Conference of the International Group for Lean Construction, Sydney, Australia, 19–21 July, pp. 245–51.
  • Kenley, R. and Seppänen, O. (2010) Location-Based Management for Construction: Planning, Spon Press, London and New York, Scheduling and Control.
  • Lowe, R.H., D’Onofrio, M.F., Fisk, D.M. and Seppänen, O. (2012) A comparison of location-based scheduling with the traditional critical path method. Paper prepared for the American College of Construction Lawyers 2012 Annual Meeting, San Francisco, CA, available at http://goo.gl/5aFLT (accessed 23 October 2013).
  • Lumsden, P. (1968) The Line-of-Balance method, Pergamon Press Limited, Industrial Training Division, London.
  • Melles, B. and Wamelink, J. (1993) Production Control in Construction, Delft University Press, Delft, Netherlands.
  • Meredith, J. and Mantel, S. (1995) Project Management: A Managerial Approach, John Wiley & Sons, New York.
  • Mohr, W. (1979) Project Management and Control, 2nd edn, University of Melbourne, Department of Architecture and Building, Melbourne, Australia.
  • Mohr, W. (1991) Project Management and Control, 5th edn, University of Melbourne, Department of Architecture and Building, Melbourne, Australia.
  • O’Brien, J. and Plotnick, F. (2009) CPM in Construction Management, 7th edn, McGraw-Hill, Boston, MA.
  • Project Management Institute. (2004) A Guide to the Project Management Body of Knowledge, 3rd edn, Project Management Institute, Upper Darby, PA.
  • Russell, A. and Wong, W. (1993) New generation of planning structures, Journal of Construction Engineering and Management, 119(2), 196–214.
  • Seppänen, O. (2009) Empirical research on the success of production control in building construction projects, PhD dissertation, Helsinki University of Technology, Finland, available at http://goo.gl/sLKIc (accessed 23 October 2013).
  • Seppänen, O. and Kankainen, J. (2004) An empirical research on deviations in production and current state of project control, in Lean Construction, DK. (eds) Proceedings of the 12th Annual Conference of the International Group for Lean Construction, Helsingor, Denmark, 6–8 August, available at http://iglc.net/?page_id=94 (accessed 23 October 2013).
  • Seppänen, O. Ballard, G. and Pesonen, S. (2010) The combination of Last Planner System and location-based management system, Lean Construction Journal, 6(1), 43–54.
  • Thomas, R. (2000) Schedule acceleration, work flow, and labour productivity, Journal of Construction Engineering and Management, 126(4), 261–7.
  • Thomas, R. and Horman, M. (2006) Fundamental principles of workforce management, Journal of Construction Engineering and Management, 132(1), 97–104.
  • Thomas, R., Horman, M., de Souza, U. and Zavrski, I. (2002) Reducing variability to improve performance as a lean construction principle, Journal of Construction Engineering and Management, 128(2), 144–54.
  • Yang, I.-T. and Ioannou, P. (2001) Resource-driven scheduling for repetitive projects: a pull-system approach, in Chua, D. and Ballard, G. (eds) Proceedings of the 9th Annual Conference of the International Group for Lean Construction, Singapore, 6–8 August, available at http://iglc.net/?page_id=103 (accessed 23 October 2013).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.