729
Views
8
CrossRef citations to date
0
Altmetric
Papers

Developing and evaluating a framework for process improvement in an alliance project: a New Zealand case study

, &
Pages 625-640 | Received 01 May 2012, Accepted 08 Dec 2013, Published online: 07 May 2014

References

  • Abdelhamid, T. (2007) Lean construction reading primer, available at http://bit.ly/JCs5Ja ( accessed 12 July 2010).
  • Alves, T.D.C.L., Milberg, C. and Walsh, K.D. (2012) Exploring lean construction practice, research, and education. Engineering, Construction and Architectural Management, 19(5), 512–25.
  • Arleroth, J. and Kristensson, H. (2011) Waste in lean construction: a case study of a PEAB construction site and the development of a lean construction tool, Master’s thesis, Department of Technology Management and Economics, University of Technology, Göteborg, Sweden.
  • Ballard, G. (1999) Improving work flow reliability, in Tommelein, I.D. and Ballard, G. (eds) Proceedings of the International Group for Lean Construction (IGLC), International Group for Lean Construction, CA, pp. 275–86.
  • Ballard, H.G. (2000) The last planner system of production control (Doctoral thesis), The University of Birmingham, Birmingham.
  • Beary, T.M. and Abdelhamid, T.S. (2005) Production planning process in residential construction using lean construction and six sigma principles, in Proceedings of the Construction Research Congress, CA, pp. 1–10.
  • Bratic, D. (2011) Six sigma: a key driver for process improvement. Total Quality Management, 10(1), 30–45.
  • Bridgeland, D.M. and Zahavi, R. (2009) Business Modeling: A Practical Guide to Realizing Business Value, Morgan Kaufmann OMG Press, Burlington, MA.
  • Bryde, D.J. and Schulmeister, R. (2012) Applying lean principles to a building refurbishment project: experiences of key stakeholders. Construction Management and Economics, 30(9), 777–94.
  • Darrington, J. (2011) Using a design-build contract for lean integrated project delivery. Lean Construction, 8(1), 85–91.
  • Deming, W.E. (1986) Out of the Crisis, Massachusetts Institute of Technology, Cambridge, UK.
  • Diekmann, J.E., Krewedl, M., Balonick, J., Stewart, T. and Wonis, S. (2004) Application of Lean Manufacturing Principles to Construction, CII Report 191, Construction Industry Institute, Austin, TX.
  • Egan, J. (1998) Rethinking Construction, Construction Task Force Report for Department of the Environment, Transport and the Regions, HMSO, London.
  • Eisenhardt, K.M. (1989) Building theories from case study research. Academy of Management Review, 14(4), 532–50.
  • Forbes, L.H. and Ahmed, S.M. (2011) Modern Construction: Lean Project Delivery and Integrated Practices, CRC Press, Boca Raton, FL.
  • Jorgensen, B. and Emmitt, S. (2008) Lost in transition: the transfer of lean manufacturing to construction. Engineering, Construction and Architectural Management, 15(4), 383–98.
  • Josephson, P.E. and Saukkoriipi, L. (2007) Waste in construction projects: Call for a new approach, The Centre for Management of the Built Environment, Chalmers University of Technology, Gothenburg, Sweden.
  • Kagioglou, M., Cooper, R. and Aouad, G. (1999) Re-engineering the UK construction industry: the process protocol. Paper presented at the Second International Conference on Construction Process Re-engineering (CPR99), University of New South Wales, Sydney, Australia, 12–13 July.
  • Kock, N., Gallivan, M.J. and DeLuca, D. (2008) Furthering information systems action research: a post-positivist synthesis of four dialectics. Journal of the Association for Information Systems, 9(2).
  • Koskela, L. (1992) Application of the New Production Philosophy to Construction, CIFE Technical Report No. 72, Stanford University, Stanford, CA.
  • Koziołek, S. and Derlukiewicz, D. (2012) Method of assessing the quality of the design process of construction equipment with the use of DFSS (design for six sigma). Automation in Construction, 22(1), 223–32.
  • Lahdenperä, P. (2012) Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(1), 57–79.
  • Liker, J. (2004) The Toyota Way, McGraw-Hill, New York, NY.
  • Macdonald, J. (1995) Together TQM and BPR are winners. The TQM Magazine, 7(3), 21–5.
  • Mitropoulos, P. and Tatum, C. (2000) Management-driven integration. Journal of Management in Engineering, 16(1), 48–58.
  • Ohno, T. (1988) Toyota Production System: Beyond Large-scale Production, Productivity Press, Portland, OR.
  • Peer, S. (1986) An improved systematic activity sampling technique for work study. Construction Management and Economics, 4(2), 151–9.
  • Pinch, L. (2005) Lean construction: eliminating the waste. Construction Executive, 34–5.
  • Shingo, S. (1989) A Study of the Toyota Production System from an Industrial Engineering Viewpoint, Productivity Press, New York, NY.
  • Shingo, S. and Dillon, A.P. (1989) A Study of the Toyota Production System: From an Industrial Engineering Viewpoint, Productivity Press, New York, NY.
  • Speroff, T. and O’Connor, G.T. (2004) Study designs for PDSA quality improvement research. Quality Management in Healthcare, 13(1), 17–32.
  • Stewart, R.A. and Spencer, C.A. (2006) Six sigma as a strategy for process improvement on construction projects: a case study. Construction Management and Economics, 24(4), 339–48.
  • Sweeney, S. (2009) Addressing market failure: using transaction cost economics to improve the construction industry’s performance, Doctoral thesis, Department of Civil and Environmental Engineering, The University of Melbourne, Melbourne, Australia.
  • Walker, D.H.T., Hampson, K.D. and Peters, R. (2000) Relationship Based Procurement Strategies for the 21st Century, AusInfo, Canberra.
  • Ward, A.C. (2007) Lean Product and Process Development, Lean Enterprise Institute Inc., Cambridge, MA.
  • Watson, M.A. and Gryna, F.M. (2002) Quality culture in small business: four case studies. Quality Control and Applied Statistics, 47(1), 63–4.
  • Yin, R.K. (1994) Case Study Research: Design and Methods, 2nd edn, Sage, London.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.