1,191
Views
65
CrossRef citations to date
0
Altmetric
Articles

Experimental field testing of a real-time construction hazard identification and transmission technique

, &
Pages 1000-1016 | Received 26 Sep 2013, Accepted 27 May 2014, Published online: 12 Aug 2014

References

  • Abdelgawad, M. and Fayek, A.R. (2012) Comprehensive hybrid framework for risk analysis in the construction industry using combined failure mode and effect analysis, fault trees, event trees, and fuzzy logic. Journal of Construction Engineering and Management, 138(5), 642–51.
  • Abdelhamid, T.S. and Everett, J.G. (2000) Identifying root causes of construction accidents. Journal of Construction Engineering and Management, 126(1), 52–60.
  • Albert, A. and Hallowell, M.R. (2013) Safety risk management for electrical transmission and distribution line construction. Safety Science, 51(1), 118–26.
  • Albert, A., Hallowell, M.R. and Kleiner, B. (2014a) Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: multiple baseline study. Journal of Construction Engineering and Management, 140(2) (forthcoming).
  • Albert, A., Hallowell, M.R., Kleiner, B., Chen, A. and Golparvar-Fard, M. (2014b) Enhancing construction hazard recognition with high-fidelity augmented virtuality. Journal of Construction Engineering and Management, doi:10.1061/(ASCE)CO.1943-7862.0000860
  • Alsamadani, R., Hallowell, M. and Javernick-Will, A.N. (2012) Measuring and modelling safety communication in small work crews in the US using social network analysis. Construction Management and Economics, 31(6), 568–79.
  • Baer, D.M., Wolf, M.M. and Risley, T.R. (1968) Some current dimensions of applied behavior analysis. Journal of Applied Behavior Analysis, 1(1), 91–7.
  • Bahn, S. (2013) Workplace hazard identification and management: the case of an underground mining operation. Safety Science, 57, 129–37.
  • Barlow, D.H., Hersen, M. and Nock, M.K. (2009) Single Case Experimental Designs: Strategies for Studying Behavior Change, Pearson, Boston.
  • Baron, R.A. (2006) Opportunity recognition as pattern recognition: how entrepreneurs ‘connect the dots’ to identify new business opportunities. Academy of Management Perspectives, 20(1), 104–19.
  • Behm, M. and Schneller, A. (2013) Application of the Loughborough construction accident causation model: a framework for organizational learning. Construction Management and Economics, 31(6), 580–95.
  • Biglan, A., Ary, D. and Wagenaar, A.C. (2000) The value of interrupted time-series experiments for community intervention research. Prevention Science, 1(1), 31–49.
  • Blount, R.L., Drabman, R.S., Wilson, N. and Stewart, D. (1982) Reducing severe diurnal bruxism in two profoundly retarded females. Journal of Applied Behavior Analysis, 15(4), 565–71.
  • Borys, D. (2012) The role of safe work method statements in the Australian construction industry. Safety Science, 50(2), 210–20.
  • Bulté, I. and Onghena, P. (2009) Randomization tests for multiple-baseline designs: an extension of the SCRT-R package. Behavior Research Methods, 41(2), 477–85.
  • Bureau of Labor Statistics (2013) 2011 Census of fatal injuries, available at http://www.bls.gov/iif/oshwc/cfoi/cfch0010.pdf ( accessed 1 July, 2013).
  • Carbonari, A., Giretti, A. and Naticchia, B. (2011) A proactive system for real-time safety management in construction sites. Automation in Construction, 20(6), 686–98.
  • Carter, G. and Smith, S.D. (2006) Safety hazard identification on construction projects. Journal of Construction Engineering and Management, 132(2), 197–205.
  • Chandler, J. and Owen, M. (2002) Developing Brands with Qualitative Market Research, Vol. 5 of Qualitative Market Research: Principle and Practice, Sage, London.
  • Clemen, R.T. (1996) Making Hard Decisions: An Introduction to Decision Analysis, Duxbury Press, Belmont, CA.
  • Cook, N.M. (1989) The applicability of verbal mnemonics for different populations: a review. Applied Cognitive Psychology, 3(1), 3–22.
  • Cooke, T. and Lingard, H. (2011) A retrospective analysis of work-related deaths in the Australian construction industry, in Egbu, C. and Lou, E.C.W. (eds.) Proceedings 27th Annual ARCOM Conference, Bristol, 5–7 September, Association of Researchers in Construction Management, Reading, pp. 279–88.
  • Desai, P. (2002) Methods beyond Interviewing in Qualitative Market Research, Sage, London.
  • Diggle, P., Heagerty, P., Liang, K.-Y. and Zeger, S. (2013) Analysis of Longitudinal Data, Oxford University Press, Oxford.
  • Dimitrov, D.M. and Rumrill, Jr. P.D. (2003) Pretest-posttest designs and measurement of change. Work, 20(2), 159–65.
  • Eslinger, P.J. (2002) Neuropsychological Interventions: Clinical Research and Practice, Guilford Press, New York.
  • Fleming, M.A. (2009) Hazard recognition techniques. By Design, ASSE, 9(3), 15–8.
  • Goetsch, D.L. (1996) Occupational Safety and Health in the Age of High Technology: For technologists, engineers, and managers, Prentice Hall, Englewood Cliffs, NJ.
  • Goh, Y.M. and Chua, D.K.H. (2009) Case-based reasoning for construction hazard identification: case representation and retrieval. Journal of Construction Engineering and Management, 135(11), 1181–9.
  • Gyi, D., Gibb, A. and Haslam, R. (1999) The quality of accident and health data in the construction industry: interviews with senior managers. Construction Management and Economics, 17(2), 197–204.
  • Haddon, Jr. W. (1970) On the escape of tigers: an ecologic note. American Journal of Public Health and the Nation’s Health, 60(12), 2229–34.
  • Haddon, W. (1973) Energy damage and the ten countermeasure strategies. Human Factors: The Journal of the Human Factors and Ergonomics Society, 15(4), 355–66.
  • Hallowell, M.R. and Gambatese, J.A. (2010) Qualitative research: application of the Delphi method to CEM research. Journal of Construction Engineering and Management, 136(1), 99–107.
  • Hallowell, M., Hinze, J., Baud, K. and Wehle, A. (2013) Proactive construction safety control: measuring, monitoring, and responding to safety leading indicators. Journal of Construction Engineering and Management, 139(10), 04013010.
  • Haro, E. and Kleiner, B.M. (2008) Macroergonomics as an organizing process for systems safety. Applied Ergonomics, 39(4), 450–455.
  • Haslam, R.A., Hide, S.A., Gibb, A.G.F., Gyi, D.E., Pavitt, T., Atkinson, S. and Duff, A.R. (2005) Contributing factors in construction accidents. Applied Ergonomics, 36(4), 401–15.
  • Hawkins, N.G., Sanson-Fisher, R.W., Shakeshaft, A., D’Este, C. and Green, L.W. (2007) The multiple baseline design for evaluating population-based research. American Journal of Preventive Medicine, 33(2), 162–8.
  • Herrmann, D.J., Geisler, F.V. and Atkinson, R.C. (1973) The serial position function for lists learned by a narrative-story mnemonic. Bulletin of the Psychonomic Society, 2(6), 377–8.
  • Holt, A.S.J. (2006) Principles of Construction Safety, Blackwell, Oxford.
  • Huitema, B.E. and McKean, J.W. (2000) Design specification issues in time-series intervention models. Educational and Psychological Measurement, 60(1), 38–58.
  • Huitema, B.E. and McKean, J.W. (2007) Identifying autocorrelation generated by various error processes in interrupted time-series regression designs a comparison of AR1 and portmanteau tests. Educational and Psychological Measurement, 67(3), 447–59.
  • International Labour Organization (2013) Safety and Health at Work, International Labour Office, Geneva.
  • Kahneman, D., Slovic, P. and Tversky, A. (1982) Judgment under Uncertainty: Heuristics and Biases, Cambridge University Press, Cambridge.
  • Kazdin, A.E. and Kopel, S.A. (1975) On resolving ambiguities of the multiple-baseline design: problems and recommendations. Behavior Therapy, 6(5), 601–8.
  • Kirk, R.E. (2013) Experimental Design: Procedures for the Behavioral Sciences, Sage, Thousand Oaks, CA.
  • Kowalski-Trakofler, K.M. and Barrett, E.A. (2003) The concept of degraded images applied to hazard recognition training in mining for reduction of lost-time injuries. Journal of Safety Research, 34(5), 515–25.
  • Levin, J.R. (1993) Mnemonic strategies and classroom learning: a twenty-year report card. The Elementary School Journal, 94(2, Special Issue: Strategies Instruction), 235–44.
  • Mastropieri, M.A. and Scruggs, T.E. (1991) Teaching Students Ways to Remember: Strategies for Learning Mnemonically, Brookline Books, Cambridge, MA.
  • Mastropieri, M.A. and Scruggs, T.E. (1998) Enhancing school success with mnemonic strategies. Intervention in School and Clinic, 33(4), 201–8.
  • McCoy, A.P., Saunders, L., Kleiner, B. and Blismas, N. (2012) Application of safety project interview data to a cyclical research model of translation. International Journal of Construction Education and Research, 8(4), 260–80.
  • McGuigan, F.J. (1997) Experimental Psychology: Methods of Research, Prentice Hall, Upper Saddle River, NJ.
  • Meldrum, A., Hare, B. and Cameron, I. (2009) Road testing a health and safety worker engagement tool-kit in the construction industry. Engineering, Construction and Architectural Management, 16(6), 612–32.
  • Mitropoulos, P. and Cupido, G. (2009) Safety as an emergent property: investigation into the work practices of high-reliability framing crews. Journal of Construction Engineering and Management, 135(5), 407–15.
  • Mushtaq, F. and Chung, P.W.H. (2000) A systematic Hazop procedure for batch processes, and its application to pipeless plants. Journal of Loss Prevention in the Process Industries, 13(1), 41–8.
  • National Academy of Sciences. (2008) Traumatic Injury Research at NIOSH, National Academies Press, Washington, DC.
  • Ortmeier, F., Reif, W. and Schellhorn, G. (2006) Deductive cause-consequence analysis (DCCA), in Proceedings Of 16th IFAC World Congress, Elsevier, Amsterdam. ISBN: 978-0-08-045108-4 and 0-08-045108-X.
  • Pinto, A., Nunes, I.L. and Ribeiro, R.A. (2011) Occupational risk assessment in construction industry – overview and reflection. Safety Science, 49(5), 616–24.
  • Ployhart, R.E. and Vandenberg, R.J. (2010) Longitudinal research: the theory, design, and analysis of change. Journal of Management, 36(1), 94–120.
  • Richards, S.E., Taylor, R., Ramasamy, R. and Richards, R.Y. (1999) Single Subject Research: Applications in Educational and Clinical Settings, Cengage Learning, San Diego, CA.
  • Rozenfeld, O., Sacks, R., Rosenfeld, Y. and Baum, H. (2010) Construction job safety analysis. Safety Science, 48(4), 491–8.
  • Sacks, R., Rozenfeld, O. and Rosenfeld, Y. (2009) Spatial and temporal exposure to safety hazards in construction. Journal of Construction Engineering and Management, 135(8), 726–36.
  • Scruggs, T.E. and Mastropieri, M.A. (1990) Mnemonic instruction for students with learning disabilities: what it is and what it does. Learning Disability Quarterly, 13(4), 271–80.
  • Scruggs, T.E., Mastropieri, M.A., Berkeley, S.L. and Marshak, L. (2010) Mnemonic strategies: evidence-based practice and practice-based evidence. Intervention in School and Clinic, 46(2), 79–86.
  • Sherratt, F., Farrell, P. and Noble, R. (2013) UK construction site safety: discourses of enforcement and engagement. Construction Management and Economics, 31(6), 623–35.
  • Singer, J.D. and Willett, J.B. (2003) Applied Longitudinal Data Analysis: Modeling Change and Event Occurrence, Oxford University Press, New York.
  • Stamatis, D.H. (2003) Failure Mode and Effect Analysis: FMEA from Theory to Execution, ASQC Quality Press, Milwaukee, WI.
  • Tversky, A. and Kahneman, D. (1974) Judgment under uncertainty: heuristics and biases. Science, 185(4157), 1124–31.
  • Waehrer, G.M., Dong, X.S., Miller, T., Haile, E. and Men, Y. (2007) Costs of occupational injuries in construction in the United States. Accident Analysis & Prevention, 39(6), 1258–66.
  • Wang, H. and Boukamp, F. (2011) Ontology-based representation and reasoning framework for supporting job hazard. Analysis Journal of Computing in Civil Engineering, 25(6), 442–456.
  • Watson, P.J. and Workman, E.A. (1981) The non-concurrent multiple baseline across-individuals design: an extension of the traditional multiple baseline design. Journal of Behavior Therapy and Experimental Psychiatry, 12(3), 257–9.
  • Weisberg, R.W. and Reeves, L. (2013) Cognition: From Memory to Creativity, Wiley, Hoboken, NJ.
  • Wilkins, J.R. (2011) Construction workers’ perceptions of health and safety training programmes. Construction Management and Economics, 29(10), 1017–26.
  • Willett, J.B. (1989) Some results on reliability for the longitudinal measurement of change: implications for the design of studies of individual growth. Educational and Psychological Measurement, 49(3), 587–602.
  • Wilson, B.A. (1987) Rehabilitation of Memory, Guilford Press, New York, NY.
  • Worthen, J.B. and Hunt, R.R. (2011) Mnemonology: Mnemonics for the 21st Century, Psychology Press, New York.
  • Zhou, W., Whyte, J. and Sacks, R. (2012) Construction safety and digital design: a review. Automation in Construction, 22( Special Issue: Planning Future Cities – Selected Papers from the 2010 eCAADe Conference), 102–11.
  • Zou, P.X. and Zhang, G. (2009) Comparative study on the perception of construction safety risks in China and Australia. Journal of Construction Engineering and Management, 135(7), 620–7.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.