319
Views
10
CrossRef citations to date
0
Altmetric
Papers

Synthetic cash flow model with singularity functions for unbalanced bidding scenarios

&
Pages 35-54 | Received 14 Jul 2014, Accepted 20 Jan 2015, Published online: 17 Apr 2015

References

  • Afshar, A. and Amiri, H. (2010) Risk-based approach to unbalanced bidding in construction projects. Engineering Optimization, 42(4), 369–85.
  • Arditi, D. and Chotibhongs, R. (2009) Detection and prevention of unbalanced bids. Construction Management and Economics, 27(8), 721–32.
  • Ashley, D.B. and Teicholz, P.M. (1977) Pre-estimate cash flow analysis. Journal of the Construction Division, Proceedings of the American Society of Civil Engineers, 103(CO3), 369–79.
  • Awwad, R. and Ioannou, P. (2012). A risk-sensitive markup decision model, in. Hastak, M., Kandil, A.A’ and Cai, H. (eds) Proceedings of the 2012 Construction Research Congress, West Lafayette, IN, 21–23 May, American Society of Civil Engineers, Reston, VA, pp. 199–208.
  • Cattell, D.W. (1987) Item price loading, in Proceedings of the International Congress on Progress in Architecture, Construction and Engineering, Johannesburg, 21–23 July, Institute of South African Architects, Randburg, vol. II: session 3, 1–20.
  • Cattell, D.W., Bowen, P.A. and Kaka, A.P. (2007) Review of unbalanced bidding models in construction. Journal of Construction Engineering and Management, 133(8), 562–73.
  • Cattell, D.W., Bowen, P.A. and Kaka, A.P. (2011) Proposed framework for applying cumulative prospect theory to an unbalanced bidding model. Journal of Construction Engineering and Management, 137(12), 1052–9.
  • Christodoulou, S.E. (2008) A bid-unbalancing method for lowering a contractor’s financial risk. Construction Management and Economics, 26(12), 1291–302.
  • Code of Federal Regulations, 23 C.F.R. § 635.102 (DATE?) Definitions, available at http://goo.gl/rzBVLq (accessed 4 July 2014).
  • Code of Federal Regulations, 23 C.F.R. § 635.114 (DATE?) Award of contract and concurrence in award, available at http://goo.gl/nZlumD (accessed 4 July 2014).
  • Cui, Q., Hastak, M. and Halpin, D.W. (2010) Systems analysis of project cash flow management strategies. Construction Management and Economics, 28(4), 361–76.
  • Diekmann, J.E., Mayer, R.H. and Stark, R.M. (1982) Coping with uncertainty in unit price contracting. Journal of the Construction Division, 108(CO3), 379–89.
  • Elazouni, A.M. and Metwally, F.G. (2005) Finance-based scheduling: tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), 400–12.
  • Friedman, L. (1956) A competitive-bidding strategy. Operations Research, 4(1), 104–112.
  • Gates, M. (1967) Bidding strategies and probabilities. Journal of the Construction Division, Proceedings of the American Society of Civil Engineers, 93(CO1), 75–107.
  • Gransberg, D.D. and Riemer, C. (2009) Impact of inaccurate engineer’s estimated quantities on unit price contracts. Journal of Construction Engineering and Management, 135(11), 1138–45.
  • Green, S.D. (1989) Tendering: optimization and rationality. Construction Management and Economics, 7(1), 53–63.
  • Halpin, D.W. and Woodhead, R. W. (1998) Construction Management, John Wiley & Sons, New York.
  • Kenley, R. (2003) Financing Construction: Cash Flows and Cash Farming, Spon Press, New York.
  • Khosrowshahi, F. (2000) Information visualization in aid of construction project cash flow management, in Banissi, E., Bannatyne, M., Chen, C., Khosrowshahi, F., Sarfraz, M. and Ursyn, A. (eds) Proceedings of the 4th International Conference on Information Visualization, London, 19–21 July, IEEE Computer Society, Washington, DC, pp. 583–8.
  • Lucko, G. (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), 711–20.
  • Lucko, G. (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), 523–35.
  • Lucko, G. (2013) Supporting financial decision-making based on time value of money with singularity functions in cash flow models. Construction Management and Economics, 31(3), 238–53.
  • Lucko, G. and Su, Y. (2014) Singularity functions as new tool for integrated project management, in Hajdu, M. and Skibniewski, M. (eds) Proceedings of the 2014 Creative Construction Conference, Prague, 21–24 June, Szent István University, Budapest, pp. 414–20.
  • Lucko, G., Vorster, M.C. and Anderson-Cook, C.M. (2007) Unknown element of owning costs – impact of residual value. Journal of Construction Engineering and Management, 133(1), 3–9.
  • Macaulay, W.H. (1919) Note on the deflection of beams. Messenger of Mathematics, 48(9), 129–30.
  • Manzo, F.A. (1997) The impact of an unbalanced bid on the change order process. Paper, Greyhawk, Woodbury, NY, available at http://greyhawk.com/news-type/technical-papers (accessed 4 July 2014), supplement to Chapter 7: Unbalanced bids and avoiding disputes relating to them, in Sweeney, N.J. and Currie, O.A. (eds) 1997 Wiley Construction Law Update (Construction Law Library), Wiley Law Publications/John Wiley and Sons, New York, NY.
  • O’Brien, J.J. and Plotnick, F. L. (2010) CPM in Construction Management, 7th edn, McGraw-Hill, New York City.
  • Park, C.S. (2011) Contemporary Engineering Economics, 5th edn, Prentice Hall, Upper Saddle River, NJ.
  • Stark, R.M. (1968) Unbalanced bidding models – theory. Journal of the Construction Division, Proceedings of the American Society of Civil Engineers, 94(CO2), 197–209.
  • Su, Y. and Lucko, G. (2013) Novel use of singularity functions to model periodic phenomena in cash flow analysis, in Pasupathy, R., Kim, S.-H., Tolk, A., Hill, R. and Kuhl, M.E. (eds) Proceedings of the 2013 45th Winter Simulation Conference, Washington, DC, 8–11 December, Institute of Electrical and Electronics Engineers, Piscataway, NJ, pp. 3157–68.
  • Su, Y. and Lucko, G. (2014) Unevenly distributed markup in cash flow modeling with singularity functions, in Ashuri, B. and Irizarry, J. (eds) Proceedings of the 2014 Construction Research Congress, Atlanta, GA, 19–21 May, American Society of Civil Engineers, Reston, VA, pp. 1438–47.
  • Su, Y. and Lucko, G. (2014b) Synthetic cash flow model with singularity functions I: theory for periodic phenomena and time value of money. Journal of Construction Engineering and Management, forthcoming.
  • Su, Y. and Lucko, G. (2014c) Synthetic cash flow model with singularity functions II: analysis of feasible prompt payment discount scenarios. Journal of Construction Engineering and Management, forthcoming.
  • Tong, Y. and Lu, Y. (1992) Unbalanced bidding on contracts with variation trends in client-provided quantities. Construction Management and Economics, 10(1), 69–80.
  • Wang, W.-C. (2004) Electronic-based procedure for managing unbalanced bids. Journal of Construction Engineering and Management, 130(3), 455–60.
  • Yuan, X.-X. (2011) A correlated bidding model for markup size decisions. Construction Management and Economics, 29(11), 1101–19.
  • Yuan, X.-X. (2013) Has the dust settled? A revisit to the Friedman–Gates controversy, in Attalla, M. and Francis, A. (eds) Proceedings of the 2013 4th Construction Specialty Conference at the Canadian Society for Civil Engineering Annual Conference, Montréal, Québec, 29 May–1 June, Canadian Society for Civil Engineering, Montréal, Québec, pp. CON-058-1–CON-058-10.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.