2,249
Views
40
CrossRef citations to date
0
Altmetric
Articles

Innovation management model: a tool for sustained implementation of product innovation into construction projects

, &
Pages 209-232 | Received 06 Jun 2014, Accepted 13 Mar 2015, Published online: 08 Jun 2015

References

  • Abernathy, W.J. and Clark, K. (1985) Mapping the winds of change. Research Policy, 14, 3–22.10.1016/0048-7333(85)90021-6
  • Abernathy, W.J. and Utterback, J.M. (1978) Patterns of innovation in technology. Technology Review, 80(7), 40–47.
  • Anderson, F. and Manseau, A. (1999) A systemic approach to generation/transmission/use of innovation in construction activities. Innovation: Management Policy and Practice, 2(5–6), 43.
  • Andrey, P., Carvalho, A. and Helman, H. (1998) Looking for what could be wrong: an approach to lean thinking. Proceedings from the Sixth Annual Conference of the International Group for Lean Construction, Guaruja, Brazil, 13–15 August.
  • Aouad, G., Ozorhon, B. and Abbott, C. (2010) Facilitating innovation in construction: directions and implications for research and policy. Construction Innovation: Information, Process, Management, 10(4), 374–394.10.1108/14714171011083551
  • Azhar, S., Hein, M. and Sketo, B. (2008) Building information modelling (BIM) benefits, risks and challenges, in Proceedings of the 44th ASC National Conference, Auburn, Alabama, USA.
  • Baker, J., Lovell, K. and Harris, N. (2006) How expert are the experts? An exploration of the concept of ‘expert’within Delphi panel techniques. Nurse Researcher, 14(1), 59–70.10.7748/nr2006.10.14.1.59.c6010
  • Blayse, A.M. and Manley, K. (2004) Key influences on construction innovation. Construction Innovation, 4(3), 143–154.10.1108/14714170410815060
  • Blismas, N. and Wakefield, R. (2009) Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation: Information, Process, Management, 9(1), 72–83.10.1108/14714170910931552
  • Bresnen, M. and Marshall, N. (2001) Understanding the diffusion and application of new management ideas in construction. Engineering, Construction and Architectural Management, 8(5–6), 335–345.10.1046/j.1365-232X.2001.00216.x
  • Caerteling, J.S., Hartmann, A. and Tijhuis, W. (2006) Innovation processes in construction: two case studies. Joint Conference on Construction Culture, Innovation and Management, Dubai, United Arab Emirates.
  • Chan, A., Yung, E., Lam, P., Tam, C. and Cheung, S. (2001) Application of Delphi method in selection of procurement systems for construction projects. Construction Management and Economics, 19, 699–718.10.1080/01446190110066128
  • Cohen, J. (1988) Statistical Power Analysis for the Behavioral Sciences, 2nd edn, Lawrence Erlbaum Associates, New Jersey.
  • Cooper, R., Kagioglou, M., Aouad, G., Hinks, J., Sexton, M. and Sheath, D. (1998) The development of a generic design and construction process, in European Conference, Product Data Technology (PDT) Days, March 1998, pp. 1–10.
  • Cooper, R., Aouad, G., Lee, A., Wu, S., Fleming, A. and Kagioglou, M. (2005) Process management in design and construction, Wiley-Blackwell, Oxford.
  • Corotis, R.B., Harris, J.C. and Fox, R.R. (1981) Delphi methods: theory and design load application. Journal of the Structural Division, 107(6), 1095–1105.
  • Dainty, A.R., Bryman, A., Price, A.D., Greasley, K., Soetanto, R. and King, N. (2005) Project affinity: the role of emotional attachment in construction projects. Construction Management and Economics, 23(3), 241–244.10.1080/01446190500040596
  • Dalkey, N., Brown, B. and Cochran, S. (1970) The Delphi method III: use of self-ratings to improve group estimates. Technological Forecasting, 1, 283–291.10.1016/0099-3964(70)90029-3
  • Davenport, T.H. (2013) Process innovation: reengineering work through information technology, Harvard Business Press, Boston, MA.
  • Delbecq, A.L., Van de Ven, A.H. and Gustafson, D.H. (1975) Group techniques for program planning: a guide to nominal group and Delphi processes, Scott, Foresman, Glenview, IL.
  • Dewick, P. and Miozzo, M. (2004) Networks and innovation: sustainable technologies in Scottish social housing. R&D Management, 34(3), 323–33.
  • Dodgson, M. (2000) The management of technological innovation: an international and strategic approach, Oxford University Press, Oxford.
  • Dossick, C.S. and Neff, G. (2011) Messy talk and clean technology: communication, problem-solving and collaboration using building information modelling. The Engineering Project Organization Journal, 1(2), 83–93.10.1080/21573727.2011.569929
  • Drucker, P.F. (1986) Innovation and Entrepreneurship, Pan, London.
  • Dubois, A. and Gadde, L.E. (2002) The construction industry as a loosely coupled system: implications for productivity and innovation. Construction Management & Economics, 20(7), 621–31.
  • Dulaimi, M. and Kumaraswamy, M.M. (2000) Procuring for innovation: the integrating role of innovation in construction procurement, in Proceedings of ARCOM 2000 Conference, Glasgow, pp. 303–312.
  • Dulaimi, M.F., Ling, F., Ofori, G. and De Silva, N. (2002) Enhancing integration and innovation in construction. Building Research and Information, 30(4), 237–247.10.1080/09613210110115207
  • Eaton, D., Akbiyikli, R. and Dickinson, M. (2006) An evaluation of the stimulants and impediments to innovation within PFI/PPP projects. Construction Innovation: Information, Process, Management, 6(2), 63–67.10.1108/14714170610710668
  • Edum-Fotwe, F.T. and McCaffer, R. (2000) Developing project management competency: perspectives from the construction industry. International Journal of Project Management, 18, 111–124.10.1016/S0263-7863(98)90075-8
  • Egan, J. (1998) Rethinking Construction. Report from the Construction Task Force.
  • Egbu, C.O. (1999) Skills, knowledge and competencies for managing construction refurbishment works. Construction Management & Economics, 17(1), 29–43.
  • El Asmar M. and Francom T. (2013) Assessing the impact of Building Information Modelling (BIM) on construction project performance, in Hajdu, M. and Skibniewski, M. (eds.) Procs Creative Construction Conference, 6–9 July 2013, Budapest, Hungary, pp. 101–110.
  • Emmitt, S. (2001) Technological gatekeepers: the management of trade literature by design offices. Engineering, Construction and Architectural Management, 8(1), 2–8.10.1046/j.1365-232x.2001.00166.x
  • Freeman, C. (1989) The Economics of Industrial Innovation, MIT Press, Cambridge, Mass.
  • Gann, D.M. (2000) Building Innovation: Complex Constructs in a Changing World, Thomas Telford, London.10.1680/bicciacw.25967
  • Gann, D.M. and Salter, A.J. (2000) Innovation in project-based, service-enhanced firms: the construction of complex products and systems. Research Policy, 29(7–8), 955–972.10.1016/S0048-7333(00)00114-1
  • Glass, J., Dainty, A.R. and Gibb, A.G. (2008) New build: materials, techniques, skills and innovation. Energy Policy, 36(12), 4534–4538.10.1016/j.enpol.2008.09.016
  • Gu, N. and London, K. (2010) Understanding and facilitating BIM adoption in the AEC industry. Automation in construction, 19(8), 988–999.10.1016/j.autcon.2010.09.002
  • Harkola, J. and Greve, A. (1995) Diffusion of technology: cohesion or structural equivalence? in Academy of Management Proceedings, No. 1, 422–426.
  • Hartmann, A. (2006) The context of innovation management in construction firms. Construction Management and Economics, 24, 567–578.10.1080/01446190600790629
  • Hartmann, T., Van Meerveld, H., Vossebeld, N. and Adriaanse, A. (2012) Aligning building information model tools and construction management methods. Automation in Construction, 22, 605–613.10.1016/j.autcon.2011.12.011
  • Henderson, R. and Clark, K. (1990) Architectural innovation: the reconfiguration of existing product technologies and the failure of established firms. Administrative Science Quarterly, 35, 9–22.10.2307/2393549
  • Ho, Y.T. and Feng C.W. (2013) An information-flow-based organisational framework to streamline the process of employing BIM within construction projects, in Hajdu, M.: Skibniewski, M. (eds.) Procs Creative Construction Conference, 6–9 July 2013, Budapest, Hungary, pp. 163–170.
  • Hughes, W. (1991) Modelling the construction projects using plans of work, in 4th Yugoslav Symposium on Organization and Management in Construction, Dubrovnik, Yugoslavia, pp. 81–86.
  • Ibrahim, M. and Moselhi O. (2013) Self adaptive forecasting for construction projects, in Hajdu, M. and Skibniewski, M. (eds.) Procs Creative Construction Conference, 6–9 July 2013, Budapest, Hungary.
  • Javidan, M. (1998) Core competence: what does it mean in practice? Long Range Planning, 31(1), 60–71.10.1016/S0024-6301(97)00091-5
  • Kamien, M. and Schwartz, N. (1975) Market structure and innovation. Journal of Economic Literature, 23(1), 1–37.
  • Keegan, A. and Turner, J.R. (2002) The management of innovation in project-based firms. Long Range Planning, 35(4), 367–388.10.1016/S0024-6301(02)00069-9
  • King, N. and Majchrzak, A. (1996) Concurrent engineering tools: are the human issues being ignored. Engineering Management, 43(2), 189–201.
  • Kinnear, P.R. and Gray, C.D. (2004) SPSS 12 made simple, Psychology Press, New York, NY.
  • Kiviniemi, A., Tarandi, V., Karlshøj, J., Bell, H. and Karud, O.J. (2008) Review of the development and implementation of IFC compatible BIM.
  • Koskela, L. and Vrijhoef, R. (2001) Is the current theory of construction a hindrance to innovation? Building Research and Information, 29(3), 197–207.10.1080/09613210110039266
  • Kwakye, A.A. (1997) Construction Project Administration in Practice. Longman [co-published with] the Chartered Institute of Building.
  • Laborde, M. and Sanvido, V. (1994) Introducing new process technologies into construction companies. Journal of Construction Engineering and Management, 120(3), 488–508.10.1061/(ASCE)0733-9364(1994)120:3(488)
  • Lampel, J. (2001) The core competencies of effective project execution the challenge of diversity. International Journal of Project Management, 19(8), 471–483.10.1016/S0263-7863(01)00042-4
  • Latham, M. (1994) Constructing the Team: Joint Review of Procurement and Contractual Arrangements in the UK Construction Industry. Government Report.
  • Lee, G., Sacks, R. and Eastman, C.M. (2006) Specifying parametric building object behaviour (BOB) for a building information modelling system. Automation in Construction, 15, 758–776.10.1016/j.autcon.2005.09.009
  • Ling, F.Y.Y. (2003) Managing the implementation of construction innovations. Construction Management and Economics, 21(6), 635–649.10.1080/0144619032000123725
  • Linstone, H.A. and Turoff, M. (Eds.) (1975) The Delphi method: Techniques and applications, Vol. 29, Addison-Wesley, Reading, MA.
  • Lloyd-Walker, B., Mills, A. and Walker, D. (2014) Enabling construction innovation: the role of a no-blame culture as a collaboration behavioural driver in project alliances. Construction Management and Economics, 32(3), 229–45.
  • Manley, K., Blayse, A. M. and McFallan, S. (2005) Demonstrating the benefits of construction innovation, in Creating an Entrepreneurial Economy: The Role of Enterprise and Innovation, International Research Conference, 7–8 July, University of Waikato, Hamilton, New Zealand.
  • Manseau, A. and Shields, R. (2005) Building Tomorrow: Innovation in Construction and Engineering, Ashgate Publishing, Aldershot, UK.
  • Marquis, D.G. (1968) The anatomy of successful innovations. Readings in the management of innovation, Tushman, M.L. and Moore, W.L. (eds.), Ballinger Publishing Co, Boston, MA, pp. 79–87.
  • McClelland, D.C. (1973) Testing for competence rather than for “intelligence”. American Psychologist, 28, 1–14.
  • Migilinskas, D., Popov, V., Juocevicius, V. and Ustinovichius, L. (2013) The benefits, obstacles and problems of practical BIM implementation. Procedia Engineering, 57, 767–774.10.1016/j.proeng.2013.04.097
  • Miozzo, M. and Dewick, P. (2002) Building competitive advantage: innovation and corporate governance in European construction. Research Policy, 31(6), 989–1008.10.1016/S0048-7333(01)00173-1
  • Mitropoulos, P. and Tatum, C.B. (1999) Technology adoption decisions in construction organizations. Journal of Construction Engineering and Management, 125(5), 330–338.10.1061/(ASCE)0733-9364(1999)125:5(330)
  • Moore, D.R. and Dainty, A.R. (2001) Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change. Construction Management & Economics, 19(6), 559–562.
  • Murphy, M. E. (2014) Implementing innovation: a stakeholder competency-based approach for BIM. Construction Innovation, 14(4), 433–452.
  • Murphy, M. E., Heaney G. and Perera S. (2011) A methodology for evaluating construction innovation constraints through project stakeholder competencies and FMEA. Journal of Construction Innovation, Construction Innovation: Information, Process, Management, 11(4), 416–440.10.1108/14714171111175891
  • Murphy, M. E. Heaney G. and Perera S. (2013) Modeling construction innovation constraints: a tool for sustaining innovation in projects, in Hajdu, M. and Skibniewski, M. (eds.) Proceedings, Creative Construction Conference 2013, 6–9 July 2013, Budapest, Hungary, pp. 525–535.
  • Nahod, M.-M., Vukomanovic, M., and Radujkovic, M. (2013a) Framework for measuring and evaluating behavioral competencies in construction projects, in Hajdu, M. and Skibniewski, M. (eds.) Procs Creative Construction Conference 2013, 6–9 July 2013, Budapest, Hundary, pp. 536–545.
  • Nahod, M.-M., Vukomanovic, M. and Radujkovic, M. (2013b) The impact of ICB 3.0 competencies on project management success. Procedia - Social and Behavioural Science, 74(1), 105–115.
  • Nam, C.H. and Tatum, C.B. (1989) Toward an understanding of product innovation process in construction. Journal of Construction Engineering and Management, 115(4), 517–534.10.1061/(ASCE)0733-9364(1989)115:4(517)
  • Nam, C.H. and Tatum, C.B. (1997) Leaders and champions for construction innovation. Construction Management Economics, 15, 259–270.10.1080/014461997372999
  • Newton, P.W. (1999) Modelling innovation in AEC: understanding the fourth dimension of competition, http://bit.ly/1Bdp8Ug (accessed 19 July 2005).
  • Nielsen, A. (2002) Use of FMEA – failure modes effects analysis on moisture problems in buildings. 6th Symposium on Building Physics in the Nordic Countries, Trondheim, Norway, June 17.
  • Okoli, C. and Pawlowski, D. (2004) The Delphi method as a research tool: an example, design consideration and applications. Information and Management, 42, 15–29.10.1016/j.im.2003.11.002
  • Organisation for Economic Co-operation and Development (2005) Oslo Manual: Guidelines for Collecting and Interpreting Innovation Data, OECD publishing, European Commission, Eurostat.
  • Perera, S., Pearson, J., Zhou, L. and Ekundayo, D. (2013) Professional, academic and industrial development needs: a competency mapping and expert opinion review. International Journal of Strategic Property Management, Special Issue in Construction Education, 17(2), 143–160.10.3846/1648715X.2013.806966
  • Porter, M. (1980) Competitive Strategy, Techniques for Analysing Industries and Competitors, Free Press, New York, NY.
  • Prahalad, C. K. and Hamel, G. (1990) The Core Competence of the Corporation, Harvard Business Review, Boston, MA.
  • Pries, F. and Janszen, F. (1995) Innovation in the construction industry: the dominant role of the environment. Construction Management and Economics, 13, 43–51.10.1080/01446199500000006
  • Riddle, D. (2000) Why innovate? International Trade Forum, 2, 18–19.
  • Rogers, E. (1995) Diffusion of Innovations, Simon & Schuster, New York, NY.
  • Rosenberg, N. (1982) Inside the Black Box, Technology and Economics, Cambridge University Press, London.
  • Rothwell, R. (1976) Innovation in textile machinery: some significant factors in success and failure, Science Policy Research Unit, Occasional Paper Series No. 2, June.
  • Rothwell, R. (1992) Successful industrial innovation: critical factors for the 1990s. R&D Management, 22(3), 221–239.
  • Sacks, R., Koskela, L., Dave, B.A. and Owen, R. (2010) Interaction of lean and building information modelling in construction. Journal of construction engineering and management, 136(9), 968–980.10.1061/(ASCE)CO.1943-7862.0000203
  • Salter, A. and Gann, D. (2003) Sources of ideas for innovation in engineering design. Research Policy, 32(8), 1309–1324.10.1016/S0048-7333(02)00119-1
  • Schmidt, J.B. (1995) New product mytopia. Journal of Business & Industrial Marketing, Winter 10(1), 23–34.
  • Schumpeter, J.A. (1947) The creative response in economic history. Journal of Economic History, 7, 149–159.10.1017/S0022050700054279
  • Seaden, G. (1996) Economics of innovation in the construction industry. Journal of Infrastructure Systems, 2(3), 103–107.10.1061/(ASCE)1076-0342(1996)2:3(103)
  • Sebastian, R. (2011) Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(2), 176–187.10.1108/09699981111111148
  • Shields, T., Silcock, G., Donegan, H. and Bell, Y. (1987) Methodological problems associated with the use of the Delphi technique. Fire Technology, 23(3), 175–185.10.1007/BF01036934
  • Slaughter, E.S. (1998) Models of construction innovation. Journal of Construction Engineering and Management, 124(3), 226–231.10.1061/(ASCE)0733-9364(1998)124:3(226)
  • Slaughter, E.S. (2000) Implementation of construction innovations. Building Research and Information, 28(1), 2–17.10.1080/096132100369055
  • Spencer, S.M. and Spencer, L.M. (1993) Competence at work: models for superior performance, John Wiley & Sons, New York, NY.
  • Sproull, L.S. and Goodman, P.S. (1990) Technology and organizations: integration and opportunities. Technology and organizations, 254–265.
  • Steel, J., Drogemuller, R. and Toth, B. (2012) Model interoperability in building information modelling. Software & Systems Modelling, 11(1), 99–109.
  • Steele, J. and Murray, M. (2004) Creating, supporting and sustaining a culture of innovation. Engineering, Construction and Architectural Management, 11(5), 316–322.10.1108/09699980410558502
  • Tatum, C.B. (1986) Potential mechanisms for construction innovation. Journal of Construction Engineering and Management, 112(2), 178–191.10.1061/(ASCE)0733-9364(1986)112:2(178)
  • Tatum, C.B. (1988) Classification system for construction technology. Journal of Construction Engineering and Management, 114(3), 344–363.10.1061/(ASCE)0733-9364(1988)114:3(344)
  • Tatum, C.B. (1989) Organizing to increase innovation in construction firms. Journal of Construction Engineering and Management, 115(4), 602–617.10.1061/(ASCE)0733-9364(1989)115:4(602)
  • Teece, D.J., Pisano, G. and Shuen, A. (1997) Dynamic Capabilities and Strategic Management, Oxford University Press, Oxford.
  • Toole, T.M. (1998) Uncertainty and home builders’ adoption of technological innovations. Journal of Construction Engineering and Management, 124(4), 323–332.10.1061/(ASCE)0733-9364(1998)124:4(323)
  • Tushman, M.L. and Anderson, P. (1986) Technological discontinuities and organizational environments. Administrative Science Quarterly, 31, 439–465.10.2307/2392832
  • Urabe, K. (1988) Innovation and the Japanese management system, in Urabe, K., Child, J. and Kagono, T. (eds.) Innovation and Management, International Comparisons, De Gruyter & Co., Berlin, pp. 3–25.
  • Utterback, J.M. and Abernathy, W.J. (1975) A dynamic model of process and product innovation. Omega, 3(6), 639–656.10.1016/0305-0483(75)90068-7
  • Van der Panne, G., Van Beers, C. and Kleinknecht, A. (2003) Success and failure of innovation: a literature review. International Journal of Innovation Management, 7(3), 309–338.10.1142/S1363919603000830
  • Van der Ven, A.H. (1986) Central problems in the management of innovation. Management Science, 32, 590–607.
  • Von Hippel, E. (1988) The Sources of Innovation, Oxford University Press, New York, NY.
  • Voss, C.A. (1988) Implementation: a key issue in manufacturing technology: the need for a field of study. Research Policy, 17, 55–63.10.1016/0048-7333(88)90021-2
  • Wadalkar, M.S. and Pimplikar, S.S. (2012) Effective training program for gap closing in construction industry. Journal of Mechanical and Civil Engineering, 3, 31–38.
  • Wagner, H.T., Morton, S.C., Dainty, A.R. and Burns, N.D. (2011) Path dependent constraints on innovation programmes in production and operations management. International Journal of Production Research, 49(11), 3069–3085.10.1080/00207543.2010.482569
  • Winch, G. (1998) Zephyrs of creative destruction: understanding the management of innovation. Building Research and Information, 26(5), 268–279.10.1080/096132198369751
  • Wix, J. and Katranuschkov, P. (2002) Defining the matrix of communication processes in the AEC/FM industry: current developments and gap analysis, CIB w78 Conference, Aarhus School of Architecture, Denmark, pp. 20–28.
  • Womack, J.P., Jones, D.T. and Roos, D. (1990) The Machine that Changed the World. Rawson Associates: Maxwell Macmillan, New York; Oxford.
  • Yeung, J.F., Chan, A.P., Chan, D.W. and Li, L.K. (2007) Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study. Construction Management and Economics, 25(12), 1219–1237.10.1080/01446190701598673
  • Yu, W.D., Cheng, S.T., Wu, C.M. and Lou, H.R. (2012) A self-evolutionary model for automated innovation of construction technologies. Automation in Construction, 27, 78–88.10.1016/j.autcon.2012.04.018
  • Zuppa, D., Issa, R.R. and Suermann, P.C. (2009) BIM’s impact on the success measures of construction projects. Technical Council on Computing and Information Technology of ASCE Reston, VA.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.