625
Views
6
CrossRef citations to date
0
Altmetric
Articles

Risk-chasing behaviour in on-site construction decisions

, &
Pages 845-858 | Received 09 Nov 2015, Accepted 24 Jun 2016, Published online: 02 Aug 2016

References

  • Ahn, S., Lee, S. and Steel, R. (2014) Construction workers’ perceptions and attitudes toward social norms as predictors of their absence behavior. Journal of Construction Engineering and Management, 140(5), 04013069.
  • Allais, M. (1953) Le comportement de l’homme rationnel devant le risque: Critique des postulats et axiomes de l’école américaine [Behavior of the rational man under risk: Critical assumptions and axioms from the American School]. Econometrica, 21(4), 503–46.
  • Ariely, D., Huber, J. and Wertenbroch, K. (2005) When do losses loom larger than gains? JMR, Journal of Marketing Research, 42(2), 134–8.
  • Baloi, D. and Price, A.D.F. (2003) Modelling global risk factors affecting construction cost performance. International Journal of Project Management, 21(4), 261–9.
  • Bolton, G.E. and Ockenfels, A. (2012) Behavioral economic engineering. Journal of Economic Psychology, 33(3), 665–76.
  • Boukendour, S. and Hughes, W. (2014) Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), 279–89.
  • Campo, S. (2012) Risk aversion and asymmetry in procurement auctions: Identification, estimation and application to construction procurements. Journal of Econometrics, 168(1), 96–107.
  • Chan, C.T. (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), 903–14.
  • Chen, Y.Q., Zhang, S.J., Liu, L.S. and Hu, J. (2015) Risk perception and propensity in bid/no-bid decision-making of construction projects. Engineering, Construction and Architectural Management, 22(1), 2–20.
  • Chua, D.K.H., Kog, Y. and Loh, P.K. (1999) Critical success factors for different project objectives. Journal of Construction Engineering and Management, 125(3), 142–50.
  • Fiolet, J.C. (2015) Behavioural economics: Application to quotidian construction decisions. Masters thesis, in UWSPACE, University of Waterloo, Waterloo, Ontario.
  • Gajendran, T., Brewer, G., Gudergan, S. and Sankaran, S. (2014) Deconstructing dynamic capabilities: The role of cognitive and organizational routines in the innovation process. Construction Management and Economics, 32(3), 246–61.
  • Halevy, Y. (2008) Strotz meets Allais: Diminishing impatience and the certainty effect. The American Economic Review, 1145–62.
  • Han, S.H., Diekmann, J.E. and Ock, J.H. (2005) Contractor’s risk attitudes in the selection of international construction projects. Journal of Construction Engineering and Management, 131(3), 283–92.
  • Jato-Espino, D., Castillo-Lopez, E., Rodriguez-Hernandez, J. and Canteras-Jordana, J.C. (2014) A review of application of multi-criteria decision making methods in construction. Automation in Construction, 45, 151–62.
  • Kahneman, D. (2011) Thinking, Fast and Slow, Macmillan, New York, NY.
  • Kahneman, D. and Frederick, S. (2002) Representativeness Revisited: Attribute Substitution in Intuitive Judgment, Cambridge University Press, Cambridge.
  • Kahneman, D. and Tversky, A. (1979) Prospect theory: An analysis of decision under risk. Econometrica, 47(2), 263–91.
  • Kim, J. and Philips, P. (2014) Remuneration and absenteeism on a large construction site. Construction Management and Economics, 32(10), 983–99.
  • Levin, I.P., Schneider, S.L. and Gaeth, G.J. (1998) All frames are not created equal: A typology and critical analysis of framing effects. Organizational Behavior and Human Decision Processes, 76(2), 149–88.
  • Li, B., Akintoye, A., Edwards, P.J. and Hardcastle, C. (2005) Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(5), 459–71.
  • Liberman, N., Idson, L.C. and Higgins, E.T. (2005) Predicting the intensity of losses vs. non-gains and non-losses vs. gains in judging fairness and value: A test of the loss aversion explanation. Journal of experimental social psychology, 41(5), 527–34.
  • Lloyd-walker, B.M., Mills, A.J. and Walker, D.H. (2014) Enabling construction innovation: The role of a no-blame culture as a collaboration behavioural driver in project alliances. Construction Management and Economics, 32(3), 229–45.
  • Malenka, D.J., Baron, J.A., Johansen, S., Wahrenberger, J.W. and Ross, J.M. (1993) The framing effect of relative and absolute risk. Journal of General Internal Medicine, 8(10), 543–48.
  • Mazar, N., Amir, O. and Ariely, D. (2008) The dishonesty of honest people: A theory of self-concept maintenance. Journal of Marketing Research, 45(6), 633–44.
  • McGraw, A.P., Larsen, J.T., Kahneman, D. and Schkade, D. (2010) Comparing gains and losses. Psychological Science, 21(10), 1438–45.
  • Mikels, J.A. and Reed, A.E. (2009) Monetary losses do not loom large in later life: Age differences in the framing effect. The Journals of Gerontology. Series B, Psychological Sciences and Social Sciences, 64(4), 457–60.
  • Novemsky, N. and Kahneman, D. (2005) How do intentions affect loss aversion? JMR, Journal of Marketing Research, 42(2), 139–40.
  • Rabin, M. and Schrag, J.L. (1999) First impressions matter: A model of confirmatory bias. The Quarterly Journal of Economics, 114(1), 37–82.
  • Sacks, R. and Harel, M. (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management and Economics, 24(8), 869–81.
  • Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M. and Coyle, M. (1992) Critical success factors for construction projects. Journal of Construction Engineering and Management, 118(1), 94–111.
  • Sawacha, E., Naoum, S. and Fong, D. (1999) Factors affecting safety performance on construction sites. International Journal of Project Management, 17(5), 309–15.
  • Schmidt, U. (1998) A measurement of the certainty effect. Journal of Mathematical Psychology, 42(1), 32–47.
  • Simonson, I. and Tversky, A. (1992) Choice in context: Tradeoff contrast and extremeness aversion. JMR, Journal of Marketing Research, 29(3), 281–295.
  • Tabish, S. and Jha, K.N. (2011) Identification and evaluation of success factors for public construction projects. Construction Management and Economics, 29(8), 809–23.
  • Tom, S.M., Fox, C.R., Trepel, C. and Poldrack, R.A. (2007) The neural basis of loss aversion in decision-making under risk. Science, 315(5811), 515–8.
  • Tversky, A. and Kahneman, D. (1974) Judgment under uncertainty: Heuristics and biases. Science, 185(4157), 1124–31.
  • Tversky, A. and Kahneman, D. (1986) Rational choice and the framing of decisions. Journal of Business, 59(4), S251–78.
  • Tversky, A. and Kahneman, D. (1981) The framing of decisions and the psychology of choice. Science, 211(4481), 453–8.
  • Weber, B.J. and Chapman, G.B. (2005) The combined effects of risk and time on choice: Does uncertainty eliminate the immediacy effect? Does delay eliminate the certainty effect? Organizational Behavior and Human Decision Processes, 96(2), 104–18.
  • Yong, Y.C. and Mustaffa, N.E. (2013) Critical success factors for Malaysian construction projects: An empirical assessment. Construction Management and Economics, 31(9), 959–78.
  • Yousefi, S., Hipel, K.W. and Hegazy, T. (2010) Attitude-based negotiation methodology for the management of construction disputes. Journal of Management in Engineering, 26(3), 114–22.
  • Zhao, X., Hwang, B. and Low, S.P. (2013) Critical success factors for enterprise risk management in Chinese construction companies. Construction Management and Economics, 31(12), 1199–214.
  • Zhu, R., Peng, Y., Sun, Y. and Gu, J. (2012) The game study of engineering bidding mode and incentive mechanism, in Information Management, Innovation Management and Industrial Engineering (ICIII), 2012 International Conference on IEEE, Sanya, p. 397.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.