Incorporating the effect of weather in construction scheduling and management with sine wave curves: application in the United Kingdom

ORCID Icon, ORCID Icon, &
Pages 666-682 | Received 15 Dec 2017, Accepted 11 May 2018, Published online: 02 Jul 2018

References

  • Alaghbari, W., et al., 2007. The significant factors causing delay of building construction projects in Malaysia. Engineering, construction and architectural management, 14, 192–206.
  • Alarcón, L.F., et al., 2005. Assessing the impacts of implementing lean construction. In: Proceedings for the 13th International Group for Lean Construction Annual Conference, 25–27 July 2006, Santiago. Sydney, Australia: International Group on Lean Construction, 387–393.
  • AlSehaimi, A. and Koskela, L. 2008. What can be learned from studies on delay in construction? In: Proceedings for the 16th Annual Conference of the International Group for Lean Construction, 16–18 July 2008. Manchester, UK: International Group on Lean Construction, 95–106.
  • American Concrete Institute. 1985. Manual of concrete practice, Part 1. Detroit, MI: American Concrete Institute.
  • Apipattanavis, S., et al., 2010. Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of construction engineering and management, 136, 1160–1168.
  • Assaf, S.A. and Al-Hejji, S., 2006. Causes of delay in large construction projects. International journal of project management, 24, 349–357.
  • Ballesteros-Pérez, P., 2017. M-PERT: a manual project duration estimation technique for teaching scheduling basics. Journal of construction engineering and management, 143 (9), 4017063.
  • Ballesteros-Pérez, P., et al., 2015. Climate and construction delays: case study in Chile. Engineering, construction and architectural management, 22, 596–621.
  • Ballesteros-Pérez, P., et al., 2017a. Dealing with weather-related claims in construction contracts: a new approach. In: ISEC 2017 – 9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction, 24–29 July 2017. Valencia, Spain: ISEC Press.
  • Ballesteros-Pérez, P., et al., 2017b. Weather-wise: a weather-aware planning tool for improving construction productivity and dealing with claims. Automation in construction, 84, 81–95.
  • Chinowsky, P., et al., 2013. Climate change adaptation advantage for African road infrastructure. Climatic change, 117, 345–361.
  • David, M., et al., 2010. A method to generate typical meteorological years from raw hourly climatic databases. Building and environment, 45, 1722–1732.
  • Duffy, G., et al., 2012. Advanced linear scheduling program with varying production rates for pipeline construction projects. Automation in construction, 27, 99–110.
  • Dytczak, M., et al., 2013. Weather influence-aware robust construction project structure. Procedia engineering, 57, 244–253.
  • El-Rayes, K. and Moselhi, O., 2001. Impact of rainfall on the productivity of highway construction. Journal of construction engineering and management, 127, 125–131.
  • Finke, M.R., 1990. Weather-related delays on government contracts. In: AACE International Transactions of the Annual Meetings, Association for the Advancement of Cost Engineering International (AACEI), 24–27 June 1990, Boston, MA. Morgantown, WV: AACE.
  • Głuszak, M. and Les¨niak, A., 2015. Construction delays in clients opinion – multivariate statistical analysis. Procedia engineering, 123, 182–189.
  • González, P., et al., 2014. Analysis of causes of delay and time performance in construction projects. Journal of construction engineering and management, 140, 4013027.
  • Gündüz, M., Nielsen, Y., and Özdemir, M., 2013. Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of management in engineering, 29, 133–139.
  • Hamzah, N., et al., 2011. Cause of construction delay – theoretical framework. Procedia engineering, 20, 490–495.
  • Irizarry, J., Simonsen, K.L., and Abraham, D.M., 2005. Effect of safety and environmental variables on task durations in steel erection. Journal of construction engineering and management, 131, 1310–1319.
  • Jang, M.H., et al., 2008. Method of using weather information for support to manage building construction projects. In: M. Ettouney, ed. AEI 2008: building integration solutions. Reston, VA: ASCE, 1–10. doi:10.1061/41002(328)38
  • Jung, M., et al., 2016. Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of construction engineering and management, 142, 4016007. doi:10.1061/(ASCE)CO.1943-7862.0001109
  • Kim, S.H. and Augenbroe, G., 2012. Using the national digital forecast database for model-based building controls. Automation in construction, 27, 170–182.
  • Kumaraswamy, M.M., 1997. Conflicts, claims and disputes in construction. Engineering, construction and architectural management, 4, 95–111.
  • Li, X., et al., 2016. Evaluating the impacts of high-temperature outdoor working environments on construction labor productivity in China: a case study of rebar workers. Building and environment, 95, 42–52.
  • Mahamid, I., Bruland, A., and Dmaidi, N., 2012. Causes of delay in road construction projects. Journal of management in engineering, 28, 300–310.
  • Marzouk, M. and Hamdy, A., 2013. Quantifying weather impact on formwork shuttering and removal operation using system dynamics. KSCE journal of civil engineering, 17, 620–626.
  • Matheron, G., 1969. Part 1 of Cahiers du Centre de morphologie mathématique de Fontainebleau. Le krigeage universel. École nationale supérieure des mines de Paris.
  • Mentis, M., 2015. Managing project risks and uncertainties. Forest ecosystems 2, 1–14. doi:10.1186/s40663-014-0026-z
  • Mezher, T.M. and Tawil, W., 1998. Causes of delays in the construction industry in Lebanon. Engineering, construction and architectural management, 5, 252–260.
  • Moselhi, O. and El-Rayes, K., 2002. Analyzing weather-related construction claims. Cost engineering, 44, 12–19.
  • National Cooperative Highway Research Program (NCHRP). 1978. Effect of weather on highway construction. NCHRP Synthesis 47, Transportation Research Board, FL, USA.
  • Nguyen, L.D., et al., 2010. Analysis of adverse weather for excusable delays. Journal of construction engineering and management, 136, 1258–1267.
  • Orangi, A., Palaneeswaran, E., and Wilson, J., 2011. Exploring delays in Victoria-based Australian pipeline projects. Procedia engineering, 14, 874–881.
  • Rogalska, M., et al., 2006. Methods of estimation of building processes duration including weather risk factors (in Polish). Building review, 1, 37–42.
  • Ruqaishi, M. and Bashir, H.A., 2015. Causes of delay in construction projects in the oil and gas industry in the gulf cooperation council countries: a case study. Journal of management in engineering, 31, 5014017. doi:10.1061/(ASCE)ME.1943-5479.0000248
  • Sato, K., et al., 2017. Improved forecasts of winter weather extremes over midlatitudes with extra Arctic observations. Journal of geophysical research: oceans, 122, 775–787.
  • Shahin, A., AbouRizk, S.M., and Mohamed, Y., 2011. Modeling weather-sensitive construction activity using simulation. Journal of construction engineering and management, 137, 238–246.
  • Shahin, A., et al., 2014. Simulation modeling of weather-sensitive tunnelling construction activities subject to cold weather. Canadian journal of civil engineering, 41, 48–55.
  • Shan, Y. and Goodrum, P.M., 2014. Integration of building information modeling and critical path method schedules to simulate the impact of temperature and humidity at the project level. Buildings, 4, 295–319.
  • Tanijiri, H., et al., 1997. Development of automated weather-unaffected building construction system. Automation in construction, 6, 215–227.
  • Thomas, H.R., Riley, D.R., and Sanvido, V.E., 1999. Loss of labor productivity due to delivery methods and weather. Journal of construction engineering and management, 125, 39–46.
  • Thorpe, D. and Karan, E.P. 2008. Method for calculating schedule delay considering weather conditions. In: Proceedings 24th Annual ARCOM Conference, 13 September 2008, Cardiff, UK. pp. 809–818.
  • Tian, W. and De Wilde, P. 2011. Uncertainty and sensitivity analysis of building performance using probabilistic climate projections: a UK case study. Automation in construction, 20, 1096–1109.
  • Trauner, T.J., et al., 2009. Construction delays, understanding them clearly, analyzing them correctly. Burlington, MA: Elsevier.
  • UK Met Office. 2018. Met Office Integrated Data Archive System (MIDAS) Land and Marine Surface Stations Data (1853-current). Available from: http://catalogue.ceda.ac.uk/uuid/220a65615218d5c9cc9e4785a3234bd0 [Accessed 8 March 2018].
  • Vanhoucke, M., 2012. Project management with dynamic scheduling: baseline scheduling, risk analysis and project control. Berlin and Heidelberg: Springer.
  • Vose, R.S. and Menne, M.J., 2004. A method to determine station density requirements for climate observing networks. Journal of climate, 17, 2961–2971. doi:10.1175/1520-0442(2004)017<2961:AMTDSD>2.0.CO;2
  • White, C.J., et al., 2017. Potential applications of subseasonal-to-seasonal (S2S) predictions. Meteorological applications, 24, 315–325.
  • Yogeswaran, K., Kumaraswamy, M.M., and Miller, D.R.A., 1998. Claims for extensions of time in civil engineering projects. Construction management and economics, 16, 283–293.