249
Views
9
CrossRef citations to date
0
Altmetric
Articles

Win-win pricing method for BOT projects using a simulation-based evolutionary optimization

&
Pages 157-171 | Received 27 Feb 2019, Accepted 13 Aug 2019, Published online: 30 Aug 2019

References

  • Attarzadeh, M., et al., 2017. Options-based negotiation management of PPP–BOT infrastructure projects. Construction management and economics, 35, 676–692.
  • Carbonara, N., Costantino, N., and Pellegrino, R., 2014. Concession period for PPPs: a win-win model for a fair risk-sharing. International journal of project management, 32, 1223–1232.
  • Chen, T.-C., Lin, Y.-C., and Wang, L.-C., 2012. The analysis of BOT strategies based on game theory–a case study on Taiwan's high-speed railway project. Journal of civil engineering and management, 18, 662–674.
  • Cruz, C.O. and Marques, R.C., 2013. Flexible contracts to cope with uncertainty in public-private partnerships. International journal of project management, 31, 473–483.
  • European Commission, 2003. Guidelines for successful public-private partnerships. Brussels: Directorate-General regional policy .
  • Ho, S.P., 2006. Model for financial renegotiation in public-private partnership projects and its policy implications: game-theoretic view. Journal of construction engineering and management, 132, 678–688.
  • Ho, S.P. and Liu, L.Y., 2004. Analytical model for analysing construction claims and opportunistic bidding. Journal of construction engineering and management, 130, 94–104.
  • Iyer, K., and Sagheer, M., 2009. Hierarchical structuring of PPP risks using interpretative structural modeling. Journal of construction engineering and management, 136, 151–159.
  • Ke, Y., Liu, X., and Wang, S., 2008. Equitable financial evaluation method for public-private partnership projects. Tsinghua science and technology, 13, 702–707.
  • Kerf, M., et al., 1998. Concessions for infrastructure: a guide to their design and award. Washington DC: The World Bank.
  • Kokkaew, N., et al., 2011. Valuing expansion opportunities in BOT highway projects: a branching and folding back (BFB) method. Journal of the Eastern Asia society for transportation studies, 9, 66–81.
  • Konak, A., Coit, D.W., and Smith, A.E., 2006. Multi-objective optimisation using genetic algorithms: a tutorial. Reliability engineering and system safety, 91, 992–1007.
  • Liu, J., et al., 2017. Evolutionary game of investors’ opportunistic behaviour during the operational period in PPP projects. Construction management and economics, 35, 137–153.
  • Macnamara, J., 2014. The development of international standards for measurement and evaluation of public relations and corporate communication: a review. Report for the Australian Centre for Public Communication, November. Sydney: University of Technology Sydney.
  • Mccall, J., 2005. Genetic algorithms for modelling and optimisation. Journal of computational and applied mathematics, 184, 205–222.
  • Mota, J. and Moreira, A., 2015. The importance of non-financial determinants on public–private partnerships in Europe. International journal of project management, 33, 1563–1575.
  • Ng, S.T., et al., 2007. A fuzzy simulation model for evaluating the concession items of public-private partnership schemes. Automation in construction, 17, 22–29.
  • Renyong, G. and Huang, H., 2007. Joint optimisation model of road-use pricing and capacity using the optimal control theory. Journal of transportation systems engineering and information technology, 7, 61–66.
  • Shen, L., et al., 2007. Using bargaining-game theory for negotiating concession period for BOT-type contract. Journal of construction engineering and management, 133, 385–392.
  • Shen, L., Li, H., and Li, Q., 2002. Alternative concession model for build operate transfer contract projects. Journal of construction engineering and management, 128, 326–330.
  • Song, J., Jin, L., and Dong, W., 2016. Excess revenue allocation for Build-Operate-Transfer highway projects. Journal of transport economics and policy, 50, 304–324.
  • Song, J., Song, D., and Zhang, D., 2015. Modelling the concession period and subsidy for bot waste-to-energy incineration projects. Journal of construction engineering and management, 141, 04015033.
  • Song, J., et al., 2012. Decision-making model of concession price and period for traffic BOT projects under elastic demand. Fifth international conference on business intelligence and financial engineering (BIFE), 18-21 August 2012. Gansu: IEEE Computer Society, 550–555.
  • Soomro, M., Soomro, S., and Memon, A., 2016. Process and limitations of value for money analysis tests for infrastructure public-private partnerships. International journal of emerging technology and innovative engineering, 2, 380–386.
  • SROI Network. 2012. A guide to social return on investment. London: The Cabinet Office.
  • Wang, B., et al., 2018. The influence of quality benefit and marginal contribution on the optimal equity structure of the PPP projects: balancing public and private benefits. Construction management and economics, 36, 611–622.
  • World Bank Institute, 2016. Public-private partnerships reference guide. Washington DC: The World Bank Institute.
  • Xu, Y., et al., 2012a. Developing a concession pricing model for PPP highway projects. International journal of strategic property management, 16, 201–217.
  • Xu, Y., et al., 2012b. System Dynamics (SD)-based concession pricing model for PPP highway projects. International journal of project management, 30, 240–251.
  • Yang, H. and Meng, Q., 2000. Highway pricing and capacity choice in a road network under a build–operate–transfer scheme. Transportation research part A: policy and practice, 34, 207–222.
  • Zapata Quimbayo, C.A., Mejía Vega, C.A. and Marques, N.L., 2019. Minimum revenue guarantees valuation in PPP projects under a mean reverting process. Construction management and economics, 37, 121–138.
  • Zhang, X. and Abourizk, S.M., 2006. Determining a reasonable concession period for private sector provision of public works and service. Canadian journal of civil engineering, 33, 622–631.
  • Zhang, X., et al., 2016. A model for determining the optimal project life span and concession period of BOT projects. International journal of project management, 34, 523–532.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.