209
Views
1
CrossRef citations to date
0
Altmetric
Articles

A chance constrained programming method to determine optimal capital structure for privatized infrastructure

, , &
Pages 579-594 | Received 15 Oct 2020, Accepted 07 May 2021, Published online: 24 Jun 2021

References

  • Abdul-Aziz, A.R., 2001. Unraveling of bot scheme: Malaysia's Indah Water Konsortium. Journal of construction engineering and management, 127 (6), 457–460.
  • Akintola, A. and Ezekiel, C., 2005. Private Finance Initiative in the healthcare sector: trends and risk assessment. Engineering, construction and architectural management, 6, 601.
  • Alavipour, S.M.R. and Arditi, D., 2018. Optimizing financing cost in construction projects with fixed project duration. Journal of construction engineering and management, 144 (4), 04018012.
  • Bagui, S.K. and Ghosh, A., 2012. Uses of anti-glare screen barrier in economic, financial analysis and determination of optimal debt capacity ratio for a road project. KSCE journal of civil engineering, 16 (7), 1104–1114.
  • Bakatjan, S., Arikan, M., and Tiong, R.L.K., 2003. Optimal capital structure model for BOT power projects in Turkey. Journal of construction engineering and management, 129 (1), 89–97.
  • Baldly, D., 1998. The evaluation of risk management in public sector capital projects. International journal of project management, 16 (1), 35–41.
  • Bayat, M., Khanzadi, M., and Nasirzadeh, F., 2019. Determining optimal capital structure and concession period length in BOT scheme using trilateral bargaining game model. Journal of infrastructure systems, 25 (1), 04018036.
  • Brandao, L.E.T. and Saraiva, E., 2008. The option value of government guarantees in infrastructure projects. Construction management and economics, 26 (11), 1171–1180.
  • Cai, J., Li, S., and Cai, H., 2019. Empirical analysis of capital structure determinants in infrastructure projects under public–private partnerships. Journal of construction engineering and management, 145 (5), 04019032.
  • Carbonara, N. and Pellegrino, R., 2018. Revenue guarantee in public–private partnerships: a win–win model. Construction management and economics, 36 (10), 584–598.
  • Charnes, A. and Cooper, W.W., 1959. Chance constrained programming. Management science, 6 (6), 73–79.
  • Chen, B., 2020. Optimal capital structure of government-subsidized private participation in infrastructure projects. The engineering economist, 65 (4), 321–338.
  • Chen, B. and Liou, F.M., 2016. Optimal capital structure of power plant projects with various bargaining powers in project negotiations. Journal of energy engineering, 143 (2), 04016051.
  • Chen, B., Mao, C.K., and Hu, J.L., 2015. The optimal debt ratio of public–private partnership projects. International journal of construction management, 15 (3), 239–253.
  • Cui, C., et al., 2018. Review of studies on the public–private partnerships (PPP) for infrastructure projects. International journal of project management, 36 (5), 773–794.
  • Damodaran, A., 2016. Applied corporate finance: a user’s manual. 3rd ed. New York, NY: Wiley.
  • De Marco, A. and Mangano, G., 2013. Risk and value in privately financed health care projects. Journal of construction engineering and management, 139 (8), 918–926.
  • Dias, A., Jr. and Ioannou, P.G., 1995. Debt capacity and optimal capital structure for privately financed infrastructure projects. Journal of construction engineering management, 121 (4), 404–414.
  • Dong, F., et al., 2011. Stochastic optimization of capital structure in privately funded infrastructure projects. The journal of private equity, 15 (1), 36–47.
  • Donkor, E.A. and Duffey, M., 2013. Optimal capital structure and financial risk of project finance investments: a simulation optimization model with chance constraints. The engineering economist, 58 (1), 19–34.
  • Du, J., Wu, H., and Jin, R., 2019. Capital structure of public–private partnership projects: a sustainability perspective. Sustainability, 11 (13), 3505.
  • Du, J., Wu, H., and Zhao, X., 2018. Critical factors on the capital structure of public–private partnership projects: a sustainability perspective. Sustainability, 10 (6), 2066.
  • Feng, K., et al., 2017. Optimizing an equity capital structure model for public–private partnership projects involved with public funds. Journal of construction engineering and management, 143 (9), 04017067.
  • Grimsey, D. and Lewis, M.K., 2002. Evaluating the risks of public private partnerships for infrastructure projects. International journal of project management, 20 (2), 107–118.
  • Gurgur, C.Z. and Luxhoj, J.T., 2003. Application of chance-constrained programming to capital rationing problems with asymmetrically distributed cash flows and available budget. The engineering economist, 48 (3), 241–258.
  • Ho, S.P. and Liu, L.Y., 2002. An option pricing-based model for evaluating the financial viability of privatized infrastructure projects. Construction management and economics, 20 (2), 143–156.
  • Iyer, K.C. and Sagheer, M., 2012. Optimization of bid-winning potential and capital structure for build-operate-transfer road projects in India. Journal of management in engineering, 28 (2), 104–113.
  • Jasiukevičius, L. and Vasiliauskaitė, A., 2012. Formation of optimal capital structure in private–public partnership. Economics and management, 17 (4), 1275–1281.
  • Jian-cheng, D., et al., 2013. Determine optimal capital structure for metro PPP projects to reduce financial risks: theory and empirical analysis. In 2013 International Conference on Management Science and Engineering 20th Annual Conference Proceedings. New York, NY: IEEE, 2105–2111.
  • Keers, B.B.M. and Van Fenema, P.C., 2018. Managing risks in public-private partnership formation projects. International journal of project management, 36 (6), 861–875.
  • Liu, H., et al., 2020. Monte-Carlo optimization model for dynamic capital structure adjustment in Chinese public-private partnerships under revenue uncertainty. Transportation research part A: policy and practice, 142, 115–128.
  • Ma, G., Du, Q., and Wang, K., 2018. A concession period and price determination model for PPP projects: based on real options and risk allocation. Sustainability, 10 (3), 706.
  • Merville, L.J. and Tavis, L.A., 1973. Optimal working capital policies: a chance-constrained programming approach. The journal of financial and quantitative analysis, 8 (1), 47–59.
  • Miller, M.H., 1977. Debt and taxes. Journal of finance, 32 (2), 261–275.
  • Moszoro, M.W., 2010. Efficient public-private partnerships. Available at SSRN 1679993.
  • Moszoro, M.W. and Gasiorowski, P., 2007. Optimal capital structure of public–private partnerships. IMF Working Papers, 1–13.
  • Myers, S., 1977. Determinants of corporate borrowing. Journal of financial economics, 5 (2), 147–175.
  • Park, A. and Chang, C.Y., 2013. Impacts of construction events on the project equity value of the channel tunnel project. Construction management and economics, 31 (3), 223–237.
  • Pellegrino, R., Carbonara, N., and Costantino, N., 2019. Public guarantees for mitigating interest rate risk in PPP projects. Built environment project and asset management, 9 (2), 248–261.
  • Robert, O.K. and Chan, A.P.C., 2015. Review of studies on the critical success factors for public–private partnership (PPP) projects from 1990 to 2013. International journal of project management, 33 (6), 1335–1346.
  • Scott, J.H., Jr. 1976. A theory of optimal capital structure. The bell journal of economics,7, 33–54.
  • Sharma, D.K., et al., 2010. Balancing private and public interests in public–private partnership contracts through optimization of equity capital structure. Transportation research record: journal of the transportation research board, 2151 (1), 60–66.
  • Singh, L.B. and Kalidindi, S.N., 2006. Traffic revenue risk management through annuity model of PPP road projects in India. International journal of project management, 24 (7), 605–613.
  • Wang, Y. and Jin, X., 2019. Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, construction and architectural management, 26, 1348–1366.
  • Wang, B., et al., 2018. The influence of quality benefit and marginal contribution on the optimal equity structure of the PPP projects: balancing public and private benefits. Construction management and economics, 36 (11), 611–622.
  • Wibowo, A. and Kochendörfer, B., 2005. Financial risk analysis of project finance in Indonesian toll roads. Journal of construction engineering and management, 131 (9), 963–972.
  • Xu, J. and Moon, S., 2013. Stochastic revenue and cost model for determining a BOT concession period under multiple project constraints. Journal of management in engineering, 30 (3), 04014011.
  • Yang, I.T., 2005. Chance-constrained time–cost tradeoff analysis considering funding variability. Journal of construction engineering and management, 131 (9), 1002–1012.
  • Ye, S.D. and Tiong, R.L.K., 2000. NPV-at-risk method in infrastructure project investment evaluation. Journal of construction engineering and management, 126 (3), 227.
  • Yun, S., et al., 2009. Capital structure optimization for build-operate-transfer (BOT) projects using a stochastic and multi-objective approach. Canadian journal of civil engineering, 36 (5), 777–790. Vol. No.
  • Zhang, X. and Xiong, W., 2015. Renegotiation and early-termination in public private partnerships. International journal of architecture, engineering and construction, 4 (4), 203–212.
  • Zhang, X., 2005. Financial viability analysis and capital structure optimization in privatized public infrastructure projects. Journal of construction engineering and management, 131 (6), 656–668.
  • Zhang, S., et al., 2016. Critical review on PPP research – a search from the Chinese and international journals. International journal of project management, 34 (4), 597–612.
  • Zhao, L.L. and You, Q., 2013. Investigating the decision of adjustment fund in highway BOT projects. Journal of industrial engineering and engineering management, 27 (3), 81–86.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.