418
Views
2
CrossRef citations to date
0
Altmetric
Research Articles

Optimum risk/reward sharing framework to incentivize integrated project delivery adoption

ORCID Icon, ORCID Icon & ORCID Icon
Pages 519-535 | Received 12 Oct 2022, Accepted 11 Jan 2023, Published online: 28 Jan 2023

References

  • Abdellaoui, M., 2000. Parameter-free elicitation of utility and probability weighting functions. Management Science, 46 (11), 1497–1512. 10.1287/mnsc.46.11.1497.12080
  • Abdellaoui, M., Bleichrodt, H., and Paraschiv, C., 2007. Loss aversion under prospect theory: A parameter-free measurement. Management Science, 53 (10), 1659–1674. 10.1287/mnsc.1070.0711
  • Abdirad, H., and Dossick, C.S., 2019. Restructuration of architectural practice in Integrated Project Delivery (IPD): two case studies. Engineering, construction and architectural management, 26 (1), 104–117.
  • American Institute of Architects (AIA) National and AIA California Council., 2009. Experiences in collaboration – on the path to IPD. Washington, DC: AIA.
  • Al-Harbi, K.-S., 1998. Sharing fractions in cost-plus-incentive-fee contracts. International journal of project management, 16 (2), 73–80.
  • American Institute of Architects (AIA), 2009. AIA Document C191TM – 2009, Standard form multi-party agreement for integrated project delivery. Washington, DC: AIA.
  • Ashcraft, H.W., 2011. Negotiating an integrated project delivery agreement. San Francisco, CA: Hanson Bridgett LLP.
  • Ballard, G., et al., 2015. How to make shared risk and reward sustainable. Lean construction journal, 11 (2015), 25–33.
  • Barberis, N.C., 2013. Thirty years of prospect theory in economics: a review and assessment. Journal of economic perspectives, 27 (1), 173–196.
  • Barron, E.N., 2013. Cooeprative decision making, vol. 2. New York: John Wiley & Sons.
  • Borm, P., and Suijs, J., 2002. Stochastic cooperative games: theory and applications. In: Chapters in game theory. Berlin: Springer.
  • Boukendour, S., and Hughes, W., 2014. Collaborative incentive contracts: stimulating competitive behaviour without competition. Construction management and economics, 32 (3), 279–289.
  • Chang, C.-Y., 2014. Principal-agent model of risk allocation in construction contracts and its critique. Journal of construction engineering and management, 140 (1), 04013032.
  • Cheng, R., 2016. Motivation and means: How and why IPD and lean lead to success. Minnesota: University of Minnesota, University of Washington, University of British Columbia, Scan Consulting, IPDA and LCI.
  • Cheng, R., et al., 2012. IPD case studies. Minnesota: AIA, AIA Minnesota, University of Minnesota.
  • Choi, J., et al., 2019. Team integration and owner satisfaction: comparing integrated project delivery with construction management at risk in health care projects. Journal of management in engineering, 35 (1), 5018014.
  • Cohen, J., 2010. Integrated project delivery: case studies. Minnesota: AIA National, AIA California Council, AGC California and McGraw-Hill.
  • ConsensusDOCS., 2007. ConsensusDOCS 300 standard form of tri-party agreement for collaborative project delivery. Arlington, VA: ConsensusDOCS LLC.
  • Dal Gallo, L., O’Leary, S.T., and Louridas, L.J., 2009. Comparison of integrated project delivery agreements. San Francisco, CA: Hanson Bridgett LLP.
  • Darrington, J.W., and Lichtig, W.A., 2010. Rethinking the ‘G ’ in GMP: Why estimated maximum price contracts make sense on collaborative projects. The construction lawyer, 30 (2), 1–12.
  • Davies, A., Gann, D., and Douglas, T., 2009. Innovation in Megaprojects: systems integration at London Heathrow Terminal 5. California Management Review, 51 (2), 101–125.
  • Driessen, T.S.H., 2013. Cooperative games, solutions and applications (vol. 3). Berlin: Springer Science & Business Media.
  • Egan, J., 1998. Rethinking construction. London: Department of Trade and Industry.
  • El-adaway, I., Abotaleb, I., and Eteifa, S., 2017. Framework for Multiparty relational contracting. Journal of legal affairs and dispute resolution in engineering and construction, 9 (3), 4517018.
  • Elghaish, F., et al., 2021. Revolutionising cost structure for integrated project delivery: a BIM-based solution. Engineering, construction and architectural management, 28 (4), 1214–1240.
  • Farooq, M.U., Thaheem, M.J., and Arshad, H., 2018. Improving the risk quantification under behavioural tendencies: a tale of construction projects. International journal of project management, 36 (3), 414–428.
  • Fischer, M., et al., 2017. Integrating project delivery. Hoboken, New Jersey: John Wiley & Sons.
  • Franz, B., et al., 2017. Impact of team integration and group cohesion on Project delivery performance. Journal of construction engineering and management, 143 (1), 4016088.
  • Franz, B.W., Leicht, R.M., and Riley, D.R., 2013. Project impacts of specialty mechanical contractor design involvement in the health care industry: comparative case study. Journal of construction engineering and management, 139 (9), 1091–1097.
  • Hall, D.M., and Bonanomi, M.M., 2021. Governing collaborative project delivery as a common-pool resource Scenario. Project management journal, 52 (3), 250–263.
  • Haque, S.M., Green, R., and Keogh, W., 2004. Collaborative relationships in the UK upstream oil and gas industry: critical success and failure factors. Problems and Perspectives in Management, 1 (1), 44–50.
  • Hauser, J.R., and Urban, G.L., 1979. Assessment of attribute importances and consumer utility functions: von neumann-morgenstern theory applied to consumer behavior. Journal of consumer research, 5 (4), 251–262.
  • Hosseinian, S.M., and Carmichael, D.G., 2013. Optimal Gainshare/Painshare in alliance projects. Journal of the operational research society, 64 (8), 1269–1278.
  • Hosseinian, M., Farahpour, E., and Carmichael, D.G., 2020. Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of construction engineering and management, 146 (7), 4020067.
  • Ibrahim, M.W., Hanna, A., and Kievet, D., 2020. Quantitative comparison of project performance between project delivery systems. Journal of management in engineering, 36 (6), 4020082.
  • Jung, W., Ballard, G., Kim, Y.-W., and Han, S.H., 2012. Understanding of target value design for integrated project delivery with the context of game theory. Construction Research Congress 2012: Construction Challenges in a Flat World, Berkeley, CA, United States 2012.
  • Kahneman, D., and Tversky, A., 1979. Prospect theory: an analysis of decision under risk. Econometrica, 47 (2), 263–292.
  • Kőszegi, B., and Rabin, M., 2007. Reference-dependent risk attitudes. American economic review, 97 (4), 1047–1073.
  • Kőszegi, B., and Rabin, M., 2009. Reference-dependent consumption plans. American economic review, 99 (3), 909–936.
  • Lahdenperä, P., 2012. Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction management and economics, 30 (1), 57–79.
  • Laurent, J., and Leicht, R.M., 2019. Practices for designing cross-functional teams for integrated project delivery. Journal of construction engineering and management, 145 (3), 5019001.
  • Li, K., and Cheung, S.O., 2019. Unveiling cognitive biases in construction project dispute resolution through the lenses of third-party neutrals. Journal of Construction Engineering and Management, 145 (11), 04019070.
  • Lichtig, W.A., 2006. The integrated agreement for lean project delivery. Improving healthcare through built environment infrastructure, 26 (3), 85–101.
  • Liu, J., Gao, R., and Cheah, C.Y.J., 2017. Pricing mechanism of early termination of PPP projects based on real option theory. Journal of management in engineering, 33 (6), 04017035.
  • Liu, H., Song, Y., and Yang, G., 2019. Cross-efficiency evaluation in data envelopment analysis based on prospect theory. European journal of operational research, 273 (1), 364–375.
  • Liu, M., Griffis, F.H., and Bates, A.J., 2013. Compensation structure and contingency allocation in integrated project delivery. ASEE Annual Conference and Exposition, Conference Proceedings, Atlanta, Georgia, USA, 2013.
  • Love, P.E.D., et al., 2011. Risk/reward compensation model for civil engineering infrastructure alliance projects. Journal of construction engineering and management, 137 (2), 127–136.
  • Ma, Q., Li, S., and Cheung, S.O., 2022a. Unveiling embedded risks in integrated project delivery. Journal of construction engineering and management, 148 (1), 04021180.
  • Ma, Q., et al., 2022b. Barriers to adopting integrated project delivery practices. Engineering, Construction and Architectural Management (ahead-of-print).
  • Manata, B., et al., 2021. The effect of commitment differentiation on integrated project delivery team dynamics: the critical roles of goal alignment, communication behaviors, and decision quality. International journal of project management, 39 (3), 1–11.
  • McDermott, R., Fowler, J.H., and Smirnov, O., 2008. On the evolutionary origin of prospect theory preferences. The journal of politics, 70 (2), 335–350.
  • Medda, F., 2007. A game theory approach for the allocation of risks in transport public private partnerships. International journal of project management, 25 (2007), 213–218.
  • Meinhardt, H.I., 2015. Cooperative game theory. Cooperative decision making in common pool situations, 4 (I), 867–880.
  • Melese, Y., et al., 2017. Cooperation under uncertainty: assessing the value of risk sharing and determining the optimal risk-sharing rule for agents with pre-existing business and diverging risk attitudes. International journal of project management, 35 (3), 530–540.
  • Meng, X., and Gallagher, B., 2012. The impact of incentive mechanisms on project performance. International journal of project management, 30 (3), 352–362.
  • Mesa, H.A., Molenaar, K.R., and Alarcón, L.F., 2016. Exploring performance of the integrated project delivery process on complex building projects. International journal of project management, 34 (7), 1089–1101.
  • Mesa, H.A., Molenaar, K.R., and Alarcón, L.F., 2019. Comparative analysis between integrated project delivery and lean project delivery. International journal of project management, 37 (3), 395–409.
  • Neuman, J.v., and Morgenstern, O., 1944. Theory of games and economic behavior. Princeton, New Jersey: Princeton university press.
  • Peleg, B., and Sudhölter, P., 2007. Introduction to the theory of cooperative games. Berlin: Springer Science & Business Media.
  • Pishdad-Bozorgi, P., and Srivastava, D., 2018. Assessment of Integrated Project Delivery (IPD) risk and reward sharing strategies from the standpoint of collaboration: a game theory approach. Construction Research Congress 2018, New Orleans, Louisiana.
  • Ramos, G.M., Daamen, W., and Hoogendoorn, S., 2014. A state-of-the-art review: developments in utility theory, prospect theory and regret theory to investigate travellers’ behaviour in situations involving travel time uncertainty. Transport reviews, 34 (1), 46–67.
  • Ross, J., 2003. Introduction to project alliancing. Brisbane, Queensland: Project Control International Pty Limited.
  • Schroeder, G., 2014. Integrated project delivery under State of Washington and Colorado CM/GC type contracts. Lean construction journal.
  • Song, D.-W., and Panayides, P.M., 2002. A conceptual application of cooperative game theory to liner shipping strategic alliances. Maritime policy & management, 29 (3), 285–301.
  • Su, G., et al., 2021. Risk sharing strategies for IPD projects: interactional analysis of participants’ decision-making. Journal of management in engineering, 37 (1), 4020101.
  • Suijs, J., 2003. Cost allocation in spanning network enterprises with stochastic connection costs. Games and economic behavior, 42 (1), 156–171.
  • Suijs, J., 2012. Cooperative decision-making under risk. Berlin: Springer Science & Business Media.
  • Suijs, J., and Borm, P., 1999. Stochastic cooperative Games: superadditivity, convexity, and certainty equivalents. Games and economic behavior, 27 (2), 331–345.
  • Suijs, J., et al., 1999. Cooperative games with stochastic payoffs. European journal of operational research, 113 (1), 193–205.
  • Suijs, J., De Waegenaere, A., and Borm, P., 1998. Stochastic cooperative games in insurance. Insurance, 22 (3), 209–228.
  • Teng, Y., et al., 2017. Using cooperative game theory to determine profit distribution in IPD projects. International journal of construction management, 2017, 1–14.
  • Thomsen, C., et al., 2009. Managing integrated project delivery. McLean, VA: Construction Management Association of America (CMAA).
  • Tversky, A., and Kahneman, D., 1992. Advances in prospect theory cumulative representation of uncertainty. Journal of risk and insurance, 5 (4), 297–323.
  • Walker, D.H., Hampson, K., and Peters, R., 2002. Project alliancing vs project partnering: a case study of the Australian National Museum Project. Supply Chain Management: An International Journal, 7 (2), 83–91. 10.1108/13598540210425830
  • Walker, D.H.T., Harley, J., and Mills, A., 2015. Performance of project alliancing in australasia: a digest of infrastructure development from 2008 to 2013. Construction economics and building, 15 (1), 1–18.
  • Wang, Y., Cui, P., and Liu, J., 2018. Analysis of the risk-sharing ratio in PPP projects based on government minimum revenue guarantees. International journal of project management, 36 (6), 899–909.
  • Wang, Y., and Liu, J., 2015. Evaluation of the excess revenue sharing ratio in PPP projects using principal-agent models. International journal of project management, 33 (6), 1317–1324.
  • Whang, S.-W., Park, K.S., and Kim, S., 2019. Critical success factors for implementing integrated construction project delivery. Engineering, construction and architectural management, 26 (10), 2432–2446.
  • Zhang, L., and Li, F., 2014. Risk/reward compensation model for integrated project delivery. Engineering economics, 25 (5), 558–567.
  • Zheng, L., et al., 2017. Benefit sharing for BIM implementation: tackling the Moral Hazard Dilemma in inter-firm cooperation. International journal of project management, 35 (3), 393–405.
  • Zhu, L., and Cheung, S.O., 2022. Incentivizing relationship investment for improved project performance. Project management journal.
  • Zimina, D., Ballard, G., and Pasquire, C., 2014. Target value design: using collaboration and a lean approach to reduce construction cost. Construction management and economics, 30 (5), 383–398.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.