96
Views
0
CrossRef citations to date
0
Altmetric
Research Articles

Incentive-based coordination for scheduled delivery in prefab construction

&
Pages 624-639 | Received 10 Apr 2023, Accepted 10 Jan 2024, Published online: 24 Jan 2024

References

  • Anvari, B., Angeloudis, P., and Ochieng, W.Y., 2016. A multi-objective GA-based optimization for holistic manufacturing, transportation, and assembly of precast construction. Automation in construction, 71 (2), 226–241.
  • Altaf, M., et al., 2018. Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID. Automation in construction, 85, 369–383.
  • Ariningsih, P.K., Azyyati, S., and Satrio, G., 2022. The importance of information sharing in blanket order: case studies of system dynamics simulation. In: Y.-H. Kuo, Y. Fu, P.-C. Chen, C.K. Or, G.G. Huang, and J. Wang, eds. Intelligent engineering and management for Industry 4.0. New York, NY: Springer Cham, 147–158.
  • Arshad, H. and Zayed, T., 2022. Critical influencing factors of supply chain management in modular integrated construction. Automation in construction, 144, 104612.
  • Arshinder, K., Kanda, A., and Deshmukh, S.G., 2011. A review on supply chain coordination: coordination mechanisms, managing uncertainty and research directions. In: T.M. Choi and T. Cheng, eds. Supply chain coordination under uncertainty. International handbooks on information systems. Berlin; Heidelberg: Springer, 39–82.
  • Ballard, H.G., 2000. The last planner system of production control. Thesis (Doctor of Philosophy). University of Birmingham.
  • Banihashemi, S., Tabadkani, A., and Hosseini, M.R., 2017. Modular coordination-based generative algorithm to optimize construction waste. Procedia engineering, 180, 631–639.
  • Barnes-Schuster, D., Bassok, Y., and Anupindi, R., 2002. Coordination and flexibility in supply chain contracts with options. Manufacturing & service operations management, 4 (3), 171–207.
  • Barton, W. and Wang, Q., 2004. Vertical relationships in distribution channels: a marketing perspective. Antitrust bulletin, 49 (4), 859–876.
  • Bertram, N., et al., 2019. Capital projects & infrastructure, modular construction: From projects to products. McKinsey &Company [online]. Available from: https://www.ivvd.nl/wp-content/uploads/2019/12/Modular-construction-from-projects-to-products-full-report-NEW.pdf [Accessed 10 August 2023].
  • Bhore, S., 2022. Investigating the factors responsible for the material delivery time variance in the construction supply chain of prefabricated products. Thesis (Master of Science). University of Washington.
  • Blattberg, R.C., and Neslin, S.A., 1990. Sales promotion: Concepts, methods, and strategies. Englewood Cliffs, NJ: Prentice Hall.
  • Brandon-Jones, A., 2015. Fixed position layout. In: Wiley encyclopedia of management, Volume 10 operations management [online]. Available from: [Accessed 16 May 2022]. Hoboken, New Jersey: John Wiley & Sons.
  • Cachon, G.P., 2003. Supply chain coordination with contracts. In: S. Graves and T. de Kok, eds. Handbooks in operations research and management science: supply chain management. Amsterdam: Elsevier, 229–339.
  • Cachon, G.P. and Lariviere, M.A., 2005. Supply chain coordination with revenue-sharing contracts: strengths and limitations. Management science, 51 (1), 30–44.
  • Chen, X., et al., 2007. The impact of manufacturer rebates on supply chain profits. Naval research logistics, 54 (6), 667–680.
  • El-Anwar, O. and Kim, Y., 2010. Multi-objective optimization of process design using process-based sustainable impact analysis. In: Proceedings of 13th International Conference on Computing in Civil and Building Engineering, 30 June–2 July 2010. Nottingham: Nottingham University Press, 395.
  • Ghafourian, M. and Shirouyehzad, H., 2019. Classification of the critical success factors in sustainable supply chain management using interpretive structural modelling. International journal of services operations management, 34 (2), 159–179.
  • Giannoccaro, I. and Pontrandolfo, P., 2004. Supply chain coordination by revenue sharing contracts. International journal of production economics, 89 (2), 131–139.
  • Grant, J. and Kim, Y., 2021. Project delivery approaches for modular commercial construction focusing on the relationships between project stakeholders: case studies. Journal of land, housing, and urban affairs, 12 (1), 149–164.
  • Ho, C., Kim, Y., and Zabinsky, Z.B., 2022. Prefabrication supply chains with multiple shops: optimization for job allocation. Automation in construction, 136, 104155. rights and content
  • Hussein, M. and Zayed, T., 2021. Critical factors for successful implementation of just-in-time concept in modular integrated construction: a systematic review and meta-analysis. Journal of cleaner production, 284, 124716.
  • Jiang, W., et al., 2023. Modelling of pricing, crashing, and coordination strategies of prefabricated construction supply chain with power structure. PLOS one, 18 (8), e0289630.
  • Jeuland, A. and Shugan, S., 1983. Managing channel profits. Marketing science, 2 (3), 239–272.
  • Kent, D.C. and Becerik-Gerber, B., 2010. Understanding construction industry experience and attitudes toward integrated project delivery. Journal of construction engineering and management, 136 (8), 815–825.
  • Kim, Y., 2019. The impact of make-ready process on project cost performance in heavy civil construction projects. Production planning and control, 30 (13), 1064–1071.
  • Kim, T. and Kim, Y., 2021. Early due low uncertainty (EDLU) for improving supply chain performance under order reliability in precast concrete production. In: Proceedings of the 29th Annual Conference of the International Group for Lean Construction, 14-16 July 2021, Lima, Peru, 965–973.
  • Kim, Y. and Ballard, G., 2010. Management thinking in the earned value method and the last planner system. ASCE, journal of management in engineering, 26 (4), 223–228.
  • Kim, T., Kim, Y., and Cho, H., 2020. Dynamic production scheduling model under due date uncertainty in precast concrete construction. Journal of cleaner production, 257 (1), 1–13.
  • Kim, Y.-W. and Rhee, B.-D., 2020. The impact of empowering front-line managers on planning reliability and project schedule performance. ASCE, journal of management in engineering, 36 (3), 04020004.
  • Kong, L., et al., 2017. Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates. Automation in construction, 81, 34–43.
  • Lahdenperä, P., 2012. Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction management and economics, 30 (1), 57–79.
  • Langabeer, J. and Seifert, D., 2003. Supply chain integration: the key to merger success. Supply chain management review, 7 (2), 58–64.
  • Lantz, B., 2009. The double marginalization problem of transfer pricing: theory and experiment. European journal of operational research, 196 (2), 434–439.
  • Lariviere, M.A., 1999. Supply chain contracting and coordination with stochastic demand. In: S. Tayur, R. Ganeshan, and M. Magazine, eds. Quantitative models for supply chain management. Norwell, MA: Kluwers, 234–268.
  • Lee, H.L., et al., 2000. Price protection in the personal computer industry. Management science, 46 (4), 467–482.
  • Lee, C.H. and Rhee, B.-D., 2007. Channel coordination using product returns for a supply chain with stochastic salvage capacity. European journal of operational research, 177 (1), 214–238.
  • Lee, C.H. and Rhee, B.-D., 2008. Optimal guaranteed profit margins for both vendors and retailers in the fashion apparel industry. Journal of retailing, 84 (3), 325–333.
  • Lin, R. and Liao, C.-J., 2013. Batch scheduling problem for a machinery factory with fixed-position layout. International journal of production research, 51 (3), 910–926.
  • McGraw Hill Construction, 2011. Smart Market Report. Prefabrication and Modularization: Increasing productivity in the construction industry [online]. Available from: https://www.nist.gov/sites/default/files/documents/el/ economics/Prefabrication-Modularization-in-the-Construction-Industry-SMR-2011R.pdf [Accessed 18 March 2017].
  • Meng, X., 2012. The effect of relationship management on project performance in construction. International journal of project management, 30 (2), 188–198.
  • Mohamed, M., 2021. Stakeholder perception on supply chain coordination in prefabricated building projects. Thesis (Master of Science). University of Washington.
  • Moorthy, K.S., 1987. Managing channel profits: comment. Marketing science, 6 (4), 375–379.
  • Noordewier, T.G., 1989. A comparison of blanket and systems contracts. Journal of purchasing and materials management, 25 (2), 35–40.
  • Oláh, J., Sadaf, R., and Popp, D., 2018. The influence of the management success factors of logistics service providers on firms’ competitiveness. Polish journal of management studies, 17 (1), 175–193.
  • Parker, G.G. and Anderson, E.G., 2002. From buyer to integrator: the transformation of the supply-chain manager in the vertically disintegrating firm. Production and operations management, 11 (1), 75–91.
  • Pasternack, B.A., 1985. Optimal pricing and return policies for perishable commodities. Marketing science, 4 (2), 166–176.
  • Perry, M.K., 1989. Vertical integration: determinants and effects. In: R. Schmalensee and R. Willig, eds. Handbook of industrial organization volume 1. Amsterdam: North-Holland, 183–255.
  • Rausch, C., et al., 2016. Optimum assembly planning for modular construction components. Journal of computing in civil engineering, 31 (1), 04016039.
  • Taylor, T.A., 2002. Supply chain coordination under channel rebates with sales effort effects. Management science, 48 (8), 992–1007.
  • Tsay, A.A., 1999. Quantity-flexibility contract and supplier-customer incentives. Management science, 45 (10), 1339–1358.
  • Wang, Y. and Gerchak, Y., 2001. Supply chain coordination when demand is shelf-space dependent. Manufacturing & service operations management, 3 (1), 82–87.
  • Weng, Z.K., 1995. Channel coordination and quantity discount. Management science, 41 (9), 1509–1522.
  • Yang, Y., Pan, M., and Pan, W., 2019. Co-evolution through interaction of innovative building technologies: the case of modular integrated construction and robotics. Automation in construction, 107, 102932.
  • Zimina, D., Ballard, G., and Pasquire, C., 2012. Target value design: using collaboration and a lean approach to reduce construction cost. Construction management and economics, 30 (5), 383–398.
  • Zheng, X.X., et al., 2019. Coordinating a closed-loop supply chain with fairness concerns through variable-weighted Shapley values. Transportation research part E: logistics and transportation review, 126, 227–253.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.