0
Views
0
CrossRef citations to date
0
Altmetric
Research Article

A comprehensive approach for assessing the causes of low productivity in the construction sector: a systematic categorization and ranking using Pareto and Fuzzy analysis

&
Received 23 May 2023, Accepted 03 Jul 2024, Published online: 21 Jul 2024

References

  • Ab Talib, M.S., Abdul Hamid, A.B., and Thoo, A.C., 2015. Critical success factors of supply chain management: a literature survey and Pareto analysis. Euromed journal of business, 10 (2), 234–263.
  • Abdel-Wahab, M. and Vogl, B., 2011. Trends of productivity growth in the construction industry across Europe, the US, and Japan. Construction management and economics, 29 (6), 635–644.
  • Abdul Kadir, M.R., et al., 2005. Factors affecting construction labor productivity for Malaysian residential projects. Structural survey, 23 (1), 42–54.
  • Abdullah, L. and Khadiah, S., 2011. Fuzzy linguistics for measuring customer satisfaction. International journal of computer trends and technology, 2 (2), 165–177.
  • Bureau of Labor Statistics, 2015. US Bureau of Labor Statistics. www.bls.gov. Available from: https://www.bls.gov/opub/mlr/2019/home.html6+
  • Carson, C. and Abbott, M., 2012. A review of productivity analysis of the New Zealand construction industry. Construction economics and building, 12 (3), 1–15.
  • Charnes, A., Cooper, W.W., and Rhodes, E., 1978. Measuring the efficiency of DMUs. European journal of operational research, 2 (6), 429–444.
  • Coelli, T.J., et al., 2005. An introduction to efficiency and productivity analysis. 2nd ed. New York, NY: Springer.
  • Craft, R.C. and Leake, C., 2002. The Pareto principle in organizational decision-making. Management decision, 40 (8), 729–733.
  • Crawford, P. and Vogl, B., 2006. Measuring productivity in the construction industry. Building research & information, 34, 208–219.
  • de Jong, S.B. and Matthijs Bal, P., 2014. How asymmetrical task dependence and task interdependence interact. Journal of managerial psychology, 29 (8), 1115–1132.
  • Dixit, S., et al., 2019. Study of significant factors affecting construction productivity using relative importance index in Indian construction industry. E3S web of conferences, 140, 09010.
  • Doloi, H., 2008. Application of AHP in improving construction productivity from a management perspective. Construction management and economics, 26 (8), 841–854.
  • Durdyev, S. and Mbachu, J., 2011. On-site labour productivity of New Zealand construction industry: key constraints and improvement measures. Construction economics and building, 11 (3), 18–33.
  • Faridi, A.S. and El-Sayegh, S.M., 2006. Significant factors causing a delay in the UAE construction industry. Construction management and economics, 24 (11), 1167–1176.
  • Gargama, H. and Chaturvedi, S.K., 2011. Criticality assessment models for failure mode effects and criticality analysis using fuzzy logic. IEEE transactions on reliability, 60 (1), 102–110.
  • Hanna, A.S. and Heale, D.G., 1994. Factors affecting construction productivity: Newfoundland versus rest of Canada. Canadian journal of civil engineering, 21 (4), 663–673.
  • Hasan, A., et al., 2018. Factors affecting construction productivity: a 30-year systematic review. Engineering, construction, and architectural management, 25 (7), 916–937.
  • Hashiguchi, N., et al., 2020. The effects of psychological factors on perceptions of productivity in construction sites in Japan by worker age. International journal of environmental research and public health, 17 (10), 3517.
  • Horner, M. and Duff, R., 2001. A contractor’s guide to improving productivity in construction. London: CIRIA.
  • Jarkas, A.M. and Bitar, C.G., 2012. Factors affecting construction labor productivity in Kuwait. Journal of construction engineering and management, 138, 811–820.
  • Jarkas, A.M. and Radosavljevic, M., 2013. Motivational factors impacting the productivity of construction master craftsmen in Kuwait. Journal of management in engineering, 29 (4), 446–454.
  • Kane, M.T., et al., 1989. Combining data on criticality and frequency in developing test plans for licensure and certification examinations. Journal of educational measurement, 26 (1), 17–27.
  • Karunarathna, D.M.T.G.N.M. and Siriwardana, C.S.A., 2018. A tool to assess construction worker productivity. In: 2018 Moratuwa Engineering Research Conference (MERCON).
  • Kumar, M., Misra, L., and Shekhar, G., 2015. A survey in fuzzy logic: an introduction. International journal for scientific research & development, 3 (6), 822–824.
  • Loosemore, M., 2014. Improving construction productivity: a subcontractor’s perspective. Engineering, construction, and architectural management, 21 (3), 245–260.
  • Mojahed, S. and Aghazadeh, F., 2008. Major factors influencing water and wastewater treatment plant construction productivity: evidence from the deep south USA. International journal of project management, 26 (2), 195–202.
  • Naoum, S.G., 2016. Factors influencing labor productivity on construction sites. International journal of productivity and performance management, 65 (3), 401–421.
  • Ofori, G., Zhang, Z., and Ling, F.Y.Y., 2020. Key barriers to increase construction productivity: the Singapore case. International journal of construction management, 22 (14), 2635–2646. https://doi.org/10.1080/15623599.2020.1819521
  • Owens, B. and Coppola, E.A., 2012. Fuzzy set theory (or fuzzy logic) to represent the messy data of complex human (and other) systems. White Paper.
  • Park, H.-S., Thomas, S.R., and Tucker, R.L., 2005. Benchmarking of construction productivity. Journal of construction engineering and management, 131 (7), 772–778.
  • Pekuri, A., et al., 2014. Managing value creation: the business model approach in construction. International journal of business innovation and research, 8 (1), 36.
  • Petrović, D.V., et al., 2014. Risk assessment model of mining equipment failure based on fuzzy logic. Expert systems with applications, 41 (18), 8157–8164.
  • Ranasinghe, U., Ruwanpura, J., and Liu, X., 2012. Streamlining the construction productivity improvement process with the proposed role of a construction productivity improvement officer. Journal of construction engineering and management, 138 (6), 697–706.
  • Soham, M. and Rajiv, B., 2013. Critical factors affecting labor productivity in construction projects: a case study of south Gujarat region of India. International journal of engineering and advanced technology, 2 (4), 583–591.
  • Tan, W., 2000. Total factor productivity in Singapore construction. Engineering, construction and architectural management, 7 (2), 154–158.
  • Thomas, A.V. and Sudhakumar, J., 2013. Critical analysis of the key factors affecting construction labour productivity –an Indian perspective. International journal of construction management, 13 (4), 103–125.
  • US Department of Commerce, 2019. FY 2021 Annual Performance Plan and FY 2019 Annual Performance Report [online]. Available from: https://www.commerce.gov/files/fy-2021-annual-performance-plan-and-fy-2019-annual-performance-report [Accessed 22 Nov 2023].
  • Wong, Y.Y.B., Joyce, S.C., and Blessing, L., 2021. A review of design research in engineering productivity in the architecture, engineering, and construction (AEC) industry. Proceedings of the design society, 1, 201–210.
  • Xue, X., et al., 2008. Measuring the productivity of the construction industry in China by using DEA-based Malmquist productivity indices. Journal of construction engineering and management, 134 (1), 64–71.
  • Zadeh, L.A., 1965. Fuzzy sets. Information and control, 8 (3), 338–353.
  • Zhang, Z. and Chu, X., 2011. Risk prioritization in failure mode and effects analysis under uncertainty. Expert systems with applications, 38 (1), 206–214.