- Ashworth, A. and Skitmore, R. M. (1983) Accuracy in estimating, CIOB, Occasional paper 27.
- Associated Industrial Consultants and Business Operations Research Ltd (1967). Report of the joint consulting team on serial contracting for road construction, Ministry of Transport.
- Barnes, N. M. L. (1971). The design and use of experimental BoQ for civil engineering contracts, PhD thesis, UMIST.
- Beeston , D. T. 1974 . “ One statistician's view of estimating cost study 3 ” . In BCIS RICS
- Department of the Environment, Housing and Construction Statistics (1990) December Quarter, UK.
- Fine , B. and Hackemar , G. 1970 . “ Estimating and bidding strategy ” . In Building Technology and Management 8 – 9 .
- Flanagan, R. (1980). Tender price prediction for construction work, PhD thesis, University of Aston in Birmingham.
- Grinyer , R. H. and Whittaker , J. D. 1973 . Managerial judgement in competitive bidding models . Operations Research Quarterly , 24 : 181 – 191 .
- McCaffer, R. (1976). Contractor's bidding behaviour and tender price prediction, PhD thesis, Loughborough University of Technology.
- Polatsek , A. and Tversky , A. 1970 . A theory of risk . Journal of Mathematical Psychology , 7 : 541
- Quah, L. K. (1988). An evaluation of the risks in estimating and tendering for refurbishment work, PhD Thesis, Heriot-Watt University.
- Skitmore, R. M. (1981). Bidding dispersion-an investigation into a method of measuring the accuracy of cost estimates, MSc thesis, University of Salford.