References
- Abrahamson , M. 1975 . Engineering Law and International Civil Engineering Contract , London : Applied Science Publisher .
- Alkass , S. and Harris , F. 1987 . An expert system for claim analysis. The application of AI to civil and structured engineering. Proceedings of Civil Comp '87 39 – 46 . England
- Alkass , S. T. and Harris , F. C. 1991 . Construction contractors claims analysis; an integrated system approach . Building Research and Information , 19 ( 1 ) : 57 – 64 .
- Alkass , S. , Mazerolle , M. and Harris , F. C. 1993 . An integrated system to aid in the assessment of construction claims with minimum analysis cost . Computing Systems in Engineering , 4 ( 2 ) : 271 – 280 .
- Bubbers , G. and Christian , J. 1992 . Hypertext and claim analysis . ASCE Journal of Construction Engineering and Management , 118 ( 4 ) : 716 – 730 .
- Cobbi , J. E. and Deikman , J. E. 1986 . A claim analysis expert system . Project Management Journal , XVII ( 2 ) : 39 – 48 .
- Deikman , J. E. and Kruppenbacher , T. A. 1984 . Claim analysis and computer reasoning . ASCE Journal of Construction Engineering and Management , 110 ( 4 ) : 391 – 408 .
- Kraiem , Z. and Diekmann , J. 1987 . Concurrent delays in construction projects . ASCE Journal of Construction Engineering and Management , 113 ( 4 ) : 591 – 602 .
- Leary , C. and Bramble , B. September 1988 . Schedule analysis models and techniques , September , 63 – 69 . Symposium of Project Management Institute .
- Lotus 123 and reference manual, Lotus Development Corporation.
- Lyn , E. and Jones , P. 1979 . A New Approach to International Civil Engineering Contract , NY Longman Inc .
- Mazerolle , M. 1993 . Cost effective approach for delay analysis and claims preparation, MEng Report , Montreal , , Canada : Concordia University .
- Mazerolle , M. and Alkass , S. An integrated system to facilitate the analysis of construction claims . The Fifth International Conference on Computing in Civil and Building Engineering ASCE . pp. 1509 – 1516 . California , , USA
- McCullough , R. B. 1989 . CPM schedules in construction claims . Cost Engineering , 31 ( 5 ) : 18 – 21 .
- Mohan , S. M. 1990 . Expert systems applications in construction management and engineering . ASCE Journal of Construction Engineering and Management , 116 ( 1 ) : 87 – 99 .
- Primavera Systems Inc. 1991 . Primavera Project Planner 5. A Reference Manual Cynwyd , , USA
- Revay and Associates . 1990 . Delay Analysis Using the Snapshot Technique Montreal , , Canada Unpublished report
- Revay and Associates . 1991 . Delay Impact Evaluation on Project No. 43011 Montreal , , Canada Unpublished report
- Reams , J. 1989 . Delay analysis: a systematic approach . Cost Engineering , 31 ( 2 )
- Reams , J. 1990 . Substantiation and use of planned schedule in a delay analysis . Cost Engineering , 32 ( 2 ) : 12 – 16 .
- Rubin , R. 1983 . Construction Claim Analysis, Presentation, Defense , USA : Van Nostrand Reinhold .
- Sawyer , B. 1989 . VP-expert rule-base expert system development tool , Berkely , , CA : Paperback Software .
- Tribaldos , E. 1994 . Delay advisor: an expert system for claim analysis, MEng Report , Montreal , , Canada : Concordia University .
- Wickwire , J. M. , Driscoll , T. J. and Hurlbut , S. B. 1991 . Construction Scheduling: Preparation Liability, and Claims , John Wiley and Sons .