Construction delay analysis techniques

Pages 375-394 | Published online: 21 Oct 2010

References

  • Alkass , S. and Harris , F. 1991 . An integrated system that aids in the analysis of contractor's claims resulting from delays . Building Research and information , 19 : 56 – 64 .
  • Alkass , S. , Mazerolle , M. and Harris , F. An integrated system to aid in the assessment of construction claims with minimum analysis cost . Proceedings of Civil Comp 91, the second International Conference of Artificial Intelligence and Civil Engineering . Oxford, UK. pp. 15 – 22 .
  • Alkass , S. , Mazerolle , M. and Harris , F. 1993 . An integrated system to minimize the cost of analyzing construction claims . Computing Systems in Engineering , 4 ( 2–3 ) : 271 – 280 .
  • Hohns , M. 1979 . Preventing and Solving Construction Contract Disputes , New York : Van Nostrand Reinhold .
  • Kraiem , Z. and Diekmann , J. 1987 . Concurrent delays in construction projects . ASCE Journal of Construction Engineering and Management , 113 ( 4 ) : 591 – 602 .
  • Leary , C. and Bramble , B. 1988 . Schedule analysis models and techniques , 63 – 69 . California : Symposium of Project Management Instirute .
  • Lotus 123 and reference manual , Lotus Development Corporation .
  • Mazerolle , M. and Alkass , S. An integrated system to facilitate the analysis of construction claims . Proceedings of fifth International Conference on Computers in Civil Engineering . Anahaim, California. Vol. 2 , pp. 1509 – 1516 .
  • Mazerolle , M. November 1993 . Cost Effective Approach for Delay Analysis and Claims Preparation , November , Montreal, , Canada : M.Eng. Report, Centre for Building Studies, Concordia University .
  • McCullough , R. B. 1989 . CPM schedules in construction claims . Cost Engineering , 31 ( 5 ) : 18 – 21 .
  • Primavera Systems Inc . 1991 . Primavera Project Planner 5 , USA : Reference manual, Cynwyd .
  • Revay , S. 1990 . Delay Analysis Using the Snapshot Technique Montreal, , Canada Unpublished report
  • Reams , J. 1989 . Delay analysis: a systematic approach . Cost Engineering , 31 ( 2 )
  • Reams , J. 1990 . Substantiation and use of planned schedule in a delay analysis . Cost Engineering , 32 ( 2 ) : 12 – 16 .
  • Rubin , R. 1983 . Construction Claims Analysis, Presentation, Defense , New York, , USA : Van Nostrand Reinhold .
  • Wickwire , J. M. , Driscoll , T. J. and Hurlbut , S. B. 1991 . Construction Scheduling: Preparation Liability, and Claims , New York : John Wiley and Sons .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.