References
- Acebes, F., Pajares, J., Galán, J. M., & López-Paredes, A. (2013). Beyond earned value management: A graphical framework for integrated cost, schedule and risk monitoring. Procedia-Social and Behavioral Sciences, 74, 181–189.10.1016/j.sbspro.2013.03.027
- Alshibani A., & Moselhi O. (2012). Stochastic method for forecasting project time and cost. Construction Research Congress, 545–555.
- Barraza, G. A., Back, W. E., & Mata, F. (2004). Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), 25–32.10.1061/(ASCE)0733-9364(2004)130:1(25)
- Caron, F., Ruggeri, F., & Merli, A. (2013). A Bayesian approach to improve estimate at completion in earned value management. Project Management Journal, 44(1), 3–16.10.1002/pmj.v44.1
- Cox D. R., & Miller H. D. (1977). The theory of stochastic processes (Vol. 134). CRC Press.
- Elshaer, R. (2013). Impact of sensitivity information on the prediction of project’s duration using earned schedule method. International Journal of Project Management, 31(4), 579–588.10.1016/j.ijproman.2012.10.006
- Fleming Q. W., & Koppelman J. M. (2004). If EVM is so good, why isn’t it used on all projects. The Measurable News, (p. 5).
- Gaoini, E., Dey, D., & Ruggeri, F. (2009). Bayesian modeling of flash floods using generalized extreme value distribution with prior elicitation. University of Connecticut, Department of Statistics. Mansfield: Springer-Verlag.
- Hazır, Ö., & Shtub, A. (2011). Effects of the information presentation format on project control. Journal of the Operational Research Society, 62(12), 2157–2161.10.1057/jors.2011.11
- Kim, B. C., & Reinschmidt, K. F. (2010). Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), 834–843.10.1061/(ASCE)CO.1943-7862.0000192
- Lipke, W. (2004). Connecting earned value to the schedule. The Measurable News, 1, 6–16.
- Lipke W. (2006). Statistical methods applied to EVM: The next frontier. The Measurable News, (pp. 18–30).
- Narbaev, T., & De Marco, A. (2014). An earned schedule-based regression model to improve cost estimate at completion. International Journal of Project Management, 32(6), 1007–1018.10.1016/j.ijproman.2013.12.005
- Revuz D., & Yor M. (1999). Continuous martingales and Brownian motion (p. 293). Springer-Verlag Berlin Heidelberg.
- Si, X. S., Wang, W., Chen, M. Y., Hu, C. H., & Zhou, D. H. (2013). A degradation path-dependent approach for remaining useful life estimation with an exact and closed-form solution. European Journal of Operational Research, 226(1), 53–66.10.1016/j.ejor.2012.10.030
- Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 24(4), 289–302.10.1016/j.ijproman.2005.10.004
- Vanhoucke M. (2009). Measuring time: Improving project performance using earned value management (p. 136). Springer US.
- Vanhoucke, M. (2011). On the dynamic use of project performance and schedule risk information during projecttracking. Omega, 39(4), 416–426.10.1016/j.omega.2010.09.006
- Vanhoucke, M., & Vandevoorde, S. (2007). A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58(10), 1361–1374.10.1057/palgrave.jors.2602296