References
- Ahilan, C., Kumanan, S., Sivakumaran, N., & Dhas, J. E. R. (2013). Modeling and prediction of machining quality in CNC turning process using intelligent hybrid decision making tools. Applied Soft Computing, 13(3), 1543–1551. https://doi.org/https://doi.org/10.1016/j.asoc.2012.03.071
- Albers, S., Müller, F., & Schmelzer, S. (2014). Speed scaling on parallel processors. Algorithmica, 68(2), 404–425. https://doi.org/https://doi.org/10.1007/s00453-012-9678-7
- Amiri, M. F., & Behnamian, J. (2020). Multi-objective green flowshop scheduling problem under uncertainty: Estimation of distribution algorithm. Journal of Cleaner Production, 251, 119734. https://doi.org/https://doi.org/10.1016/j.jclepro.2019.119734
- Bansal, N., Kimbrel, T., & Pruhs, K. (2007). Speed scaling to manage energy and temperature. Journal of the Acm, 54(1), 1–39. https://doi.org/https://doi.org/10.1145/1206035.1206038
- Biel, K., & Glock, C. H. (2016). Systematic literature review of decision support models for energy-efficient production planning. Computers & Industrial Engineering, 101, 243–259. https://doi.org/https://doi.org/10.1016/j.cie.2016.08.021
- Biskup, D., & Feldmann, M. (2006). Lot streaming with variable sublots: An integer programming formulation. Journal of the Operational Research Society, 57(3), 296–303. https://doi.org/https://doi.org/10.1057/palgrave.jors.2602016
- Chang, J., & Chiu, H. (2005). A comprehensive review of lot streaming. International Journal of Production Research, 43(8), 1515–1536. https://doi.org/https://doi.org/10.1080/00207540412331325396
- Che, A., Wu, X., Peng, J., & Yan, P. (2017). Energy-efficient bi-objective single-machine scheduling with power-down mechanism. Computers & Operations Research, 85, 172–183. https://doi.org/https://doi.org/10.1016/j.cor.2017.04.004
- Che, A., Zeng, Y., & Lyu, K. (2016). An efficient greedy insertion heuristic for energy conscious single machine scheduling problem under time-of-use electricity tariffs. Journal of Cleaner Production, 129, 565–577. https://doi.org/https://doi.org/10.1016/j.jclepro.2016.03.150
- Chen, B., & Zhang, X. (2019). Scheduling with time-of-use costs. European Journal of Operational Research, 274(3), 900–908. https://doi.org/https://doi.org/10.1016/j.ejor.2018.11.002
- Chen, J., & Steiner, G. (2003). On discrete lot streaming in no-wait flow shops. IIE Transactions, 35(2), 91–101. https://doi.org/https://doi.org/10.1080/07408170304379
- Chen, J., Wang, L., & Peng, Z. (2019). A collaborative optimization algorithm for energy-efficient multi-objective distributed no-idle flow-shop scheduling. Swarm and Evolutionary Computation, 50(100557), 100557. https://doi.org/https://doi.org/10.1016/j.swevo.2019.100557
- Chen, T.-L., Cheng, C.-Y., & Chou, Y.-H. (2020). Multi-objective genetic algorithm for energy-efficient hybrid flow shop scheduling with lot streaming. Annals of Operations Research, 290(1-2), 813–836. https://doi.org/https://doi.org/10.1007/s10479-018-2969-x
- Cheng, J., Chu, F., Liu, M., Wu, P., & Xia, W. (2017). Bi-criteria single-machine batch scheduling with machine on/off switching under time-of-use tariffs. Computers & Industrial Engineering, 112, 721–734. https://doi.org/https://doi.org/10.1016/j.cie.2017.04.026
- Cheng, M., Mukherjee, N., & Sarin, S. (2013). A review of lot streaming. International Journal of Production Research, 51(23-24), 7023–7046. https://doi.org/https://doi.org/10.1080/00207543.2013.774506
- Ding, J., Song, S., & Wu, C. (2016). Carbon-efficient scheduling of flow shops by multi-objective optimization. European Journal of Operational Research, 248(3), 758–771. https://doi.org/https://doi.org/10.1016/j.ejor.2015.05.019
- Fang, K., Uhan, N., Zhao, F., & Sutherland, J. (2013). Flow shop scheduling with peak power consumption constraints. Annals of Operations Research, 206(1), 115–145. https://doi.org/https://doi.org/10.1007/s10479-012-1294-z
- Fang, K., Uhan, N., Zhao, F., & Sutherland, J. (2016). Scheduling on a single machine under time-of-use electricity tariffs. Annals of Operations Research, 238(1-2), 199–227. https://doi.org/https://doi.org/10.1007/s10479-015-2003-5
- Fang, K., Uhan, N., Zhao, F., & Sutherland, J. W. (2011). A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction. Journal of Manufacturing Systems, 30(4), 234–240. https://doi.org/https://doi.org/10.1016/j.jmsy.2011.08.004
- Gahm, C., Denz, F., Dirr, M., & Tuma, A. (2016). Energy-efficient scheduling in manufacturing companies: A review and research framework. European Journal of Operational Research, 248(3), 744–757. https://doi.org/https://doi.org/10.1016/j.ejor.2015.07.017
- Giret, A., Trentesaux, D., & Prabhu, V. (2015). Sustainability in manufacturing operations scheduling: A state of the art review. Journal of Manufacturing Systems, 37(1), 126–140. https://doi.org/https://doi.org/10.1016/j.jmsy.2015.08.002
- Glass, C., & Potts, C. (1998). Structural properties of lot streaming in a flow shop. Mathematics of Operations Research, 23(3), 624–639. https://doi.org/https://doi.org/10.1287/moor.23.3.624
- Jiang, E., & Wang, L. (2019). An improved multi-objective evolutionary algorithm based on decomposition for energy-efficient permutation flow shop scheduling problem with sequence-dependent setup time. International Journal of Production Research, 57(6), 1756–1771. https://doi.org/https://doi.org/10.1080/00207543.2018.1504251
- Lei, D., Zheng, Y., & Guo, X. (2017). A shuffled frog-leaping algorithm for flexible job shop scheduling with the consideration of energy consumption. International Journal of Production Research, 55(11), 3126–3140. https://doi.org/https://doi.org/10.1080/00207543.2016.1262082
- Liu, G.-S., Yang, H.-D., & Cheng, M.-B. (2017). A three-stage decomposition approach for energy-aware scheduling with processing-time-dependent product quality. International Journal of Production Research, 55(11), 3073–3091. https://doi.org/https://doi.org/10.1080/00207543.2016.1241446
- Lu, C., Gao, L., Li, X., Pan, Q., & Wang, Q. (2017). Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm. Journal of Cleaner Production, 144, 228–238. https://doi.org/https://doi.org/10.1016/j.jclepro.2017.01.011
- Lu, C., Gao, L., Pan, Q., Li, X., & Zheng, J. (2019). A multi-objective cellular grey wolf optimizer for hybrid flowshop scheduling problem considering noise pollution. Applied Soft Computing, 75, 728–749. https://doi.org/https://doi.org/10.1016/j.asoc.2018.11.043
- Luo, S., Zhang, L., & Fan, Y. (2019). Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization. Journal of Cleaner Production, 234, 1365–1384. https://doi.org/https://doi.org/10.1016/j.jclepro.2019.06.151
- Mansouri, S. A., & Aktas, E. (2016). Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem. Journal of the Operational Research Society, 67(11), 1382–1394. https://doi.org/https://doi.org/10.1057/jors.2016.4
- Mansouri, S. A., Aktas, E., & Besikci, U. (2016). Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption. European Journal of Operational Research, 248(3), 772–788. https://doi.org/https://doi.org/10.1016/j.ejor.2015.08.064
- Mu, Z., & Li, M. (2015). DVS scheduling in a line or a star network of processors. Journal of Combinatorial Optimization, 29(1), 16–35. https://doi.org/https://doi.org/10.1007/s10878-013-9668-y
- Öztop, H., Tasgetiren, M. F., Eliiyi, D. T., Pan, Q., & Kandiller, L. (2020). An energy-efficient permutation flowshop scheduling problem. Expert Systems with Applications, 150, 113279. https://doi.org/https://doi.org/10.1016/j.eswa.2020.113279
- Panwalkar, S., Dudek, R., & Smith, M. (1973). Sequencing research and the industrial scheduling problem. In S. Elmaghraby, ed., Symposium on the Theory of Scheduling and Its Applications, volume 86 of Lecture Notes in Economics and Mathematical Systems (Operations Research, Computer Science, Social Science) (pp. 29–38). Springer.
- Potts, C., & Baker, K. (1989). Flow shop scheduling with lot streaming. Operations Research Letters, 8(6), 297–303. https://doi.org/https://doi.org/10.1016/0167-6377(89)90013-8
- Ramezanian, R., Vali-Siar, M. M., & Jalalian, M. (2019). Green permutation flowshop scheduling problem with sequence-dependent setup times: A case study. International Journal of Production Research, 57(10), 3311–3333. https://doi.org/https://doi.org/10.1080/00207543.2019.1581955
- Reiter, S. (1966). A system for managing job-shop production. The Journal of Business, 39(3), 371–393. https://doi.org/https://doi.org/10.1086/294867
- Sarin, S., & Jaiprakash, P. (2007). Flow shop lot streaming. Springer.
- Shabtay, D., Kaspi, M., & Steiner, G. (2007). The no-wait two-machine flow shop scheduling problem with convex resource-dependent processing times. IIE Transactions, 39(5), 539–557. https://doi.org/https://doi.org/10.1080/07408170601181674
- Trick, M. A. (1994). Scheduling multiple variable-speed machines. Operations Research, 42(2), 234–248. https://doi.org/https://doi.org/10.1287/opre.42.2.234
- Trietsch, D., & Baker, K. (1993). Basic techniques for lot streaming. Operations Research, 41(6), 1065–1076. https://doi.org/https://doi.org/10.1287/opre.41.6.1065
- Vickson, R. (1995). Optimal lot streaming for multiple products in a two-machine flow shop. European Journal of Operational Research, 85(3), 556–575. https://doi.org/https://doi.org/10.1016/0377-2217(93)E0366-6
- Wang, J., & Wang, L. (2019). Decoding methods for the flow shop scheduling with peak power consumption constraints. International Journal of Production Research, 57(10), 3200–3218. https://doi.org/https://doi.org/10.1080/00207543.2019.1571252
- Wu, X., & Che, A. (2019). A memetic differential evolution algorithm for energy-efficient parallel machine scheduling. Omega, 82, 155–165. https://doi.org/https://doi.org/10.1016/j.omega.2018.01.001
- Wu, X., & Che, A. (2020). Energy-efficient no-wait permutation flow shop scheduling by adaptive multi-objective variable neighborhood search. Omega, 94, 102117. https://doi.org/https://doi.org/10.1016/j.omega.2019.102117
- Yao, F., Demers, A., Shenker, S. (1995). A scheduling model for reduced CPU energy. In Proceedings of the 36th Annual Symposium on Foundations of Computer Science (FOCS95), pages 374–382.
- Zandi, A., Ramezanian, R., & Monplaisir, L. (2020). Green parallel machines scheduling problem: A bi-objective model and a heuristic algorithm to obtain Pareto frontier. Journal of the Operational Research Society, 71(6), 967–978. https://doi.org/https://doi.org/10.1080/01605682.2019.1595190
- Zhang, B., Pan, Q., Gao, L., Li, X., Meng, L., & Peng, K. (2019). A multiobjective evolutionary algorithm based on decomposition for hybrid flowshop green scheduling problem. Computers & Industrial Engineering, 136, 325–344. https://doi.org/https://doi.org/10.1016/j.cie.2019.07.036
- Zhang, R., & Chiong, R. (2016). Solving the energy-efficient job shop scheduling problem: A multi-objective genetic algorithm with enhanced local search for minimizing the total weighted tardiness and total energy consumption. Journal of Cleaner Production, 112, 3361–3375. https://doi.org/https://doi.org/10.1016/j.jclepro.2015.09.097
- Zheng, X., Zhou, S., Xu, R., & Chen, H. (2020). Energy-efficient scheduling for multi-objective two-stage flow shop using a hybrid ant colony optimisation algorithm. International Journal of Production Research. published Online, 58(13), 4103–4120. https://doi.org/https://doi.org/10.1080/00207543.2019.1642529