- Abbasianjahromi, H., Rajaie, H., & Shakeri, E. (2013). A framework for subcontractor selection in the construction industry. Journal of Civil Engineering and Management, 19(2), 158–168. https://doi.org/https://doi.org/10.3846/13923730.2012.743922
- Abbasianjahromi, H., Rajaie, H., Shakeri, E., & Chokan, F. (2014). A new decision making model for subcontractor selection and its order allocation. Project Management Journal, 45(1), 55–66. https://doi.org/https://doi.org/10.1002/pmj.21394
- Abbasianjahromi, H., Sepehri, M., & Abbasi, O. (2018). A decision-making framework for subcontractor selection in construction projects. Engineering Management Journal, 30(2), 141–152. https://doi.org/https://doi.org/10.1080/10429247.2018.1448967
- Afshar, M. R., Alipouri, Y., Sebt, M. H., & Chan, W. T. (2017). A type-2 fuzzy set model for contractor prequalification. Automation in Construction, 84, 356–366. https://doi.org/https://doi.org/10.1016/j.autcon.2017.10.003
- Alipouri, Y., Sebt, M. H., Ardeshir, A., & Chan, W. T. (2019). Solving the FS-RCPSP with hyper-heuristics: A policy-driven approach. Journal of the Operational Research Society, 70(3), 403–419. https://doi.org/https://doi.org/10.1080/01605682.2018.1441636
- Arslan, G., Kivrak, S., Birgonul, M. T., & Dikmen, I. (2008). Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES). Automation in Construction, 17(4), 480–488. https://doi.org/https://doi.org/10.1016/j.autcon.2007.08.004
- Balachandra, R., & Raelin, J. A. (1984). When to kill that R&D project. Research Management, 27(4), 30–33.
- Beşikci, U., Bilge, Ü., & Ulusoy, G. (2015). Multi-mode resource constrained multi-project scheduling and resource portfolio problem. European Journal of Operational Research, 240(1), 22–31. https://doi.org/https://doi.org/10.1016/j.ejor.2014.06.025
- Biruk, S., Jaśkowski, P., & Czarnigowska, A. (2017, October). Minimizing project cost by integrating subcontractor selection decisions with scheduling. In IOP Conference Series: Materials Science and Engineering. IOP Publishing. https://doi.org/https://doi.org/10.1088/1757-899X/245/7/072007
- Chattopadhyay, D. (1999). Application of general algebraic modeling system to power system optimization. IEEE Transactions on Power Systems, 14(1), 15–22. https://doi.org/https://doi.org/10.1109/59.744462
- Cheng, M. Y., Tsai, H. C., & Sudjono, E. (2011). Evaluating subcontractor performance using evolutionary fuzzy hybrid neural network. International Journal of Project Management, 29(3), 349–356. https://doi.org/https://doi.org/10.1016/j.ijproman.2010.03.005
- Choudhry, R. M., Hinze, J. W., Arshad, M., & Gabriel, H. F. (2012). Subcontracting practices in the construction industry of Pakistan. Journal of Construction Engineering and Management, 138(12), 1353–1359. https://doi.org/https://doi.org/10.1061/(ASCE)CO.1943-7862.0000562
- Edwards, S. J., Baatar, D., Smith-Miles, K., & Ernst, A. T. (2019). Symmetry breaking of identical projects in the high-multiplicity RCPSP/max. Journal of the Operational Research Society, 31(4), 1–22. https://doi.org/https://doi.org/10.1080/01605682.2019.1595192
- El-Abbasy, M. S., Elazouni, A., & Zayed, T. (2017). Generic scheduling optimization model for multiple construction projects. Journal of Computing in Civil Engineering, 31(4), 4017003. https://doi.org/https://doi.org/10.1061/(ASCE)CP.1943-5487.0000659
- El-Mashaleh, M. S. (2009). A construction subcontractor selection model. Jordan Journal of Civil Engineering, 3(4), 375–383.
- Enshassi, A., Arain, F. M., & Tayeh, B. (2010). Subcontractor prequalification practices in Palestine. International Journal of Construction Management, 10(4), 45–74. https://doi.org/https://doi.org/10.1080/15623599.2010.10773154
- Fachrurrazi, S. H., & Munirwansyah, H. (2017). The subcontractor selection practice using ANN-multilayer. International Journal of Technology, 8(4), 761–772. https://doi.org/https://doi.org/10.14716/ijtech.v8i4.9490
- Liu, S. S., & Wang, C. J. (2010). Profit optimization for multiproject scheduling problems considering cash flow. Journal of Construction Engineering and Management, 136(12), 1268–1278. https://doi.org/https://doi.org/10.1061/(ASCE)CO.1943-7862.0000235
- Lova, A., & Tormos, P. (2001). Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Annals of Operations Research, 102(1/4), 263–286. https://doi.org/https://doi.org/10.1023/A:1010966401888
- Mokhtari, H., & Abadi, I. N. K. (2013). Scheduling with an outsourcing option on both manufacturer and subcontractors. Computers & Operations Research, 40(5), 1234–1242.
- Mokhtari, H., Abadi, I. N. K., & Amin-Naseri, M. R. (2012). Production scheduling with outsourcing scenarios: A mixed integer programming and efficient solution procedure. International Journal of Production Research, 50(19), 5372–5395. https://doi.org/https://doi.org/10.1080/00207543.2011.627687
- Monghasemi, S., Nikoo, M. R., Fasaee, M. A. K., & Adamowski, J. (2015). A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects. Expert Systems with Applications, 42(6), 3089–3104. https://doi.org/https://doi.org/10.1016/j.eswa.2014.11.032
- Mungle, S., Benyoucef, L., Son, Y. J., & Tiwari, M. K. (2013). A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project. Engineering Applications of Artificial Intelligence, 26(8), 1953–1966. https://doi.org/https://doi.org/10.1016/j.engappai.2013.05.006
- Pells, D. (1993). The AMA handbook of project management AMA-COM. New York.
- Polat, G. (2015). Subcontractor selection using the integration of the AHP and PROMETHEE methods. Journal of Civil Engineering and Management, 22(8), 1042–1054. https://doi.org/https://doi.org/10.3846/13923730.2014.948910
- Polat, G., Kaplan, B., & Bingol, B. N. (2015). Subcontractor selection using genetic algorithm. Procedia Engineering, 123, 432–440. https://doi.org/https://doi.org/10.1016/j.proeng.2015.10.081
- Pollack-Johnson, B., & Liberatore, M. J. (2006). Incorporating quality considerations into project time/cost tradeoff analysis and decision making. IEEE Transactions on Engineering Management, 53(4), 534–542. https://doi.org/https://doi.org/10.1109/TEM.2006.883705
- Siu, M. F. F., Lu, M., & AbouRizk, S. (2016). Zero-one programming approach to determine optimum resource supply under time-dependent resource constraints. Journal of Computing in Civil Engineering, 30(2), 4015028. https://doi.org/https://doi.org/10.1061/(ASCE)CP.1943-5487.0000498
- Sonmez, R., & Gürel, M. (2016). Hybrid optimization method for large-scale multimode resource-constrained project scheduling problem. Journal of Management in Engineering, 32(6), 4016020. https://doi.org/https://doi.org/10.1061/(ASCE)ME.1943-5479.0000468
- Ulubeyli, S., & Kazaz, A. (2015). Fuzzy multi-criteria decision making model for subcontractor selection in international construction projects. Technological and Economic Development of Economy, 22(2), 210–234. https://doi.org/https://doi.org/10.3846/20294913.2014.984363
- Zhang, Z., & Chen, M. (2018). A bi-level multi-agent system model for decentralized multi-project scheduling of wind power plants. Journal of Renewable and Sustainable Energy, 10(3), 35502. https://doi.org/https://doi.org/10.1063/1.5021839