References
- Barba-Gutiérrez, Y., Adenso-Diaz, B., & Gupta, S. M. (2008). Lot sizing in reverse MRP for scheduling disassembly. International Journal of Production Economics, 111(2), 741–751. https://doi.org/https://doi.org/10.1016/j.ijpe.2007.03.017
- Bentaha, M. L., Battaïa, O., & Dolgui, A. (2015). An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times. International Journal of Production Research, 53(6), 1807–1818. https://doi.org/https://doi.org/10.1080/00207543.2014.961212
- Berzi, L., Delogu, M., Pierini, M., & Romoli, F. (2016). Evaluation of the end-of-life performance of a hybrid scooter with the application of recyclability and recoverability assessment methods. Resources, Conservation and Recycling, 108, 140–155. https://doi.org/https://doi.org/10.1016/j.resconrec.2016.01.013
- Bollapragada, R., Kuppusamy, S., & Rao, U. S. (2015). Component procurement and end product assembly in an uncertain supply and demand environment. International Journal of Production Research, 53(3), 969–982. https://doi.org/https://doi.org/10.1080/00207543.2014.951522
- Cai, W., Lai, K-h., Liu, C., Wei, F., Ma, M., Jia, S., Jiang, Z., & Lv, L. (2019). Promoting sustainability of manufacturing industry through the lean energy-saving and emission-reduction strategy. Science of the Total Environment, 665, 23–32. https://doi.org/https://doi.org/10.1016/j.scitotenv.2019.02.069
- Cesaret, B., Oğuz, C., & Salman, F. S. (2012). A tabu search algorithm for order acceptance and scheduling. Computers & Operations Research, 39(6), 1197–1205. https://doi.org/https://doi.org/10.1016/j.cor.2010.09.018
- D’Adamo, I., & Rosa, P. (2016). Remanufacturing in industry: Advices from the field. International Journal of Advanced Manufacturing Technology, 86, 2575–2584. https://doi.org/https://doi.org/10.1007/s00170-016-8346-5.
- Dao, S. D., Abhary, K., Marian, R., & Goh, M. (2019). Optimisation of production scheduling for multi-product orders in VCIM systems using. Soft Computing, 23(20), 10199–10224. https://doi.org/https://doi.org/10.1007/s00500-018-3578-y
- Disney, S. M., Gaalman, G. J. C., Hedenstierna, C. P. T., & Hosoda, T. (2015). Fill rate in a periodic review order-up-to policy under auto-correlated normally distributed, possibly negative, demand. International Journal of Production Economics, 170, 501–512. https://doi.org/https://doi.org/10.1016/j.ijpe.2015.07.019
- Ehm, F. (2019). A data-driven modeling approach for integrated disassembly planning and scheduling. Journal of Remanufacturing, 9(2), 89–107. https://doi.org/https://doi.org/10.1007/s13243-018-0058-6
- Feng, Y., Zhou, M., Tian, G., Li, Z., Zhang, Z., Zhang, Q., & Tan, J. (2019). Target disassembly sequencing and scheme evaluation for CNC machine tools using improved multiobjective ant colony algorithm and fuzzy integral. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 49(12), 2438–2451. https://doi.org/https://doi.org/10.1109/TSMC.2018.2847448
- Ferrenberg, A. M., Xu, J., & Landau, D. P. (2018). Pushing the limits of Monte Carlo simulations for the three-dimensional Ising model. Physical Review. E, 97(4-1), 043301. https://doi.org/https://doi.org/10.1103/PhysRevE.97.043301
- Fleischmann, M., Bloemhof-Ruwaard, J. M., Dekker, R., van der Laan, E., van Nunen, J. A. E. E., & Van Wassenhove, L. N. (1997). Quantitative models for reverse logistics: A review. European Journal of Operational Research, 103(1), 1–17. https://doi.org/https://doi.org/10.1016/S0377-2217(97)00230-0
- Fu, Y., Zhou, M. C., Guo, X., & Qi, L. (2019). Scheduling dual-objective stochastic hybrid flow shop with deteriorating jobs via bi-population evolutionary algorithm. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 50(12), 5037–5048. https://doi.org/https://doi.org/10.1109/TSMC.2019.2907575
- Gao, K. Z., He, Z. M., Huang, Y., Duan, P. Y., & Suganthan, P. N. (2020). A survey on meta-heuristics for solving disassembly line balancing, planning and scheduling problems in remanufacturing. Swarm and Evolutionary Computation, 57, 100719. https://doi.org/https://doi.org/10.1016/j.swevo.2020.100719
- Go, T. F., Wahab, D. A., Rahman, M. N. A., Ramli, R., & Azhari, C. H. (2011). Disassemblability of end-of-life vehicle: A critical review of evaluation methods. Journal of Cleaner Production, 19(13), 1536–1546. https://doi.org/https://doi.org/10.1016/j.jclepro.2011.05.003
- Godichaud, M., & Amodeo, L. (2018). Economic order quantity for multistage disassembly systems. International Journal of Production Economics, 199, 16–25. https://doi.org/https://doi.org/10.1016/j.ijpe.2018.02.008
- Godichaud, M., Tchangani, A., Pérès, F., & Iung, B. (2012). Sustainable management of end-of-life systems. Production Planning & Control, 23(2-3), 216–236. https://doi.org/https://doi.org/10.1080/09537287.2011.591656
- Guijarro, E., Cardós, M., & Babiloni, E. (2012). On the exact calculation of the fill rate in a periodic review inventory policy under discrete demand patterns. European Journal of Operational Research, 218(2), 442–447. https://doi.org/https://doi.org/10.1016/j.ejor.2011.11.025
- Guo, X., & Liu, S. (2014). A scatter search approach for multiobjective selective disassembly sequence problem. Discrete Dynamics in Nature and Society, 2014, 1–9. https://doi.org/https://doi.org/10.1155/2014/756891
- Guo, X., Zhou, M., Liu, S., & Qi, L. (2020). Lexicographic multiobjective scatter search for the optimization of sequence-dependent selective disassembly subject to multiresource constraints. IEEE Transactions on Cybernetics, 50(7), 3307–3317. https://doi.org/https://doi.org/10.1109/TCYB.2019.2901834
- Guo, X., Zhou, M. C., Liu, S., & Qi, L. (2021). Multiresource-constrained selective disassembly with maximal profit and minimal energy consumption. IEEE Transactions on Automation Science and Engineering, 18(2), 804–816. https://doi.org/https://doi.org/10.1109/TASE.2020.2992220
- Gupta, S., & Taleb, K. (1994). Scheduling disassembly. International Journal of Production Research, 32(8), 1857–1866. https://doi.org/https://doi.org/10.1080/00207549408957046
- Hecker, F. T., Stanke, M., Becker, T., & Hitzmann, B. (2014). Application of a modified GA, ACO and a random search procedure to solve the production scheduling of a case study bakery. Expert Systems with Applications, 41(13), 5882–5891. https://doi.org/https://doi.org/10.1016/j.eswa.2014.03.047
- Inderfurth, K., & Langella, I. M. (2006). Heuristics for solving disassemble-to-order problems with stochastic yields. OR Spectrum, 28(1), 73–99. https://doi.org/https://doi.org/10.1007/s00291-005-0007-2
- Jaehn, F. (2016). Sustainable Operations. European Journal of Operational Research, 253(2), 243–264. https://doi.org/https://doi.org/10.1016/j.ejor.2016.02.046
- Ji, X., Zhang, Z., Huang, S., & Li, L. (2016). Capacitated disassembly scheduling with parts commonality and start-up cost and its industrial application. International Journal of Production Research, 54(4), 1225–1243. https://doi.org/https://doi.org/10.1080/00207543.2015.1058536
- Jia, S., Yuan, Q., Cai, W., Li, M., & Li, Z. (2018). Energy modeling method of machine-operator system for sustainable machining. Energy Conversion and Management, 172, 265–276. https://doi.org/https://doi.org/10.1016/j.enconman.2018.07.030
- Kadri, R. L., & Boctor, F. F. (2018). An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case. European Journal of Operational Research, 265(2), 454–462. https://doi.org/https://doi.org/10.1016/j.ejor.2017.07.027
- Karmarkar, U. S. (1987). Lot sizes, lead times and in-process inventories. Management Science, 33(3), 409–418. https://doi.org/https://doi.org/10.1287/mnsc.33.3.409
- Kim, H.-J., Lee, D.-H., & Xirouchakis, P. (2007). Disassembly scheduling: Literature review and future research directions. International Journal of Production Research, 45(18-19), 4465–4484. https://doi.org/https://doi.org/10.1080/00207540701440097
- Kim, H.-J., & Xirouchakis, P. (2010). Capacitated disassembly scheduling with random demand. International Journal of Production Research, 48(23), 7177–7194. https://doi.org/https://doi.org/10.1080/00207540903469035
- Kim, H.-J., Lee, D.-H., Xirouchakis, P., & Kwon, O. K. (2009). A branch and bound algorithm for disassembly scheduling with assembly product structure. Journal of the Operational Research Society, 60(3), 419–430. https://doi.org/https://doi.org/10.1057/palgrave.jors.2602568
- Kim, H. J., Lee, D. H., Xirouchakis, P., & Züst, R. (2003). Disassembly scheduling with multiple product types. CIRP Annals, 52(1), 403–406. https://doi.org/https://doi.org/10.1016/S0007-8506(07)60611-8
- Kongar, E., & Gupta, S. M. (2006). Disassembly to order system under uncertainty. Omega, 34(6), 550–561. https://doi.org/https://doi.org/10.1016/j.omega.2005.01.006
- Lee, D.-H., & Xirouchakis, P. (2004). A two-stage heuristic for disassembly scheduling with assembly product structure. Journal of the Operational Research Society, 55(3), 287–297. https://doi.org/https://doi.org/10.1057/palgrave.jors.2601690
- Lee, D. H., Xirouchakis, P., & Zust, R. (2002). Disassembly scheduling with capacity constraints. CIRP Annals, 51(1), 387–390. https://doi.org/https://doi.org/10.1016/S0007-8506(07)61543-1
- Li, B., Krushinsky, D., Van Woensel, T., & Reijers, H. A. (2016). The Share-a-Ride problem with stochastic travel times and stochastic delivery locations. Transportation Research Part C: Emerging Technologies, 67, 95–108. https://doi.org/https://doi.org/10.1016/j.trc.2016.01.014
- Li, M., Yao, L., Yang, J., & Wang, Z. (2015). Due date assignment and dynamic scheduling of one-of-a-kind assembly production with uncertain processing time. International Journal of Computer Integrated Manufacturing, 28(6), 616–627. https://doi.org/https://doi.org/10.1080/0951192X.2014.900859
- Liao, C. J., & Shyu, C. H. (1991). An analytical determination of lead time with normal demand. International Journal of Operations & Production Management, 11(9), 72–78. https://doi.org/https://doi.org/10.1108/EUM0000000001287
- Liu, J., Xu, W., Zhou, Z., & Pham, D. T. (2020). Scheduling of robotic disassembly in remanufacturing using Bees algorithms. In A. H. Gandomi, A. Emrouznejad, M. M. Jamshidi, K. Deb, & I. Rahimi (eds.), Evolutionary Computation in Scheduling (pp. 257–298). John Wiley & Sons, Inc. https://doi.org/https://doi.org/10.1002/9781119574293.ch9.
- Liu, K., & Zhang, Z. H. (2018). Capacitated disassembly scheduling under stochastic yield and demand. European Journal of Operational Research, 269(1), 244–257. https://doi.org/https://doi.org/10.1016/j.ejor.2017.08.032
- Liu, Q., Dong, M., Chen, F., Lv, W., & Ye, C. (2019). Single-machine-based joint optimization of predictive maintenance planning and production scheduling. Robotics and Computer-Integrated Manufacturing, 55, 173–182. https://doi.org/https://doi.org/10.1016/j.rcim.2018.09.007
- Ojstersek, R., Brezocnik, M., & Buchmeister, B. (2020). Multi-objective optimization of production scheduling with evolutionary computation: A review. International Journal of Industrial Engineering Computations, 11(3), 359–376. https://doi.org/https://doi.org/10.5267/j.ijiec.2020.1.003
- Prakash, P., Ceglarek, D., & Tiwari, M. K. (2012). Constraint-based simulated annealing (CBSA) approach to solve the disassembly scheduling problem. The International Journal of Advanced Manufacturing Technology, 60(9-12), 1125–1137. https://doi.org/https://doi.org/10.1007/s00170-011-3670-2
- Rossi, R., Kilic, O. A., & Tarim, S. A. (2015). Piecewise linear approximations for the static–dynamic uncertainty strategy in stochastic lot-sizing. Omega, 50, 126–140. https://doi.org/https://doi.org/10.1016/j.omega.2014.08.003
- Senécal, R., & Dimitrakopoulos, R. (2020). Long-term mine production scheduling with multiple processing destinations under mineral supply uncertainty, based on multi-neighbourhood Tabu search. International Journal of Mining, Reclamation and Environment, 34(7), 459–475. https://doi.org/https://doi.org/10.1080/17480930.2019.1595902
- Shi, F., Zhao, S., & Meng, Y. (2020). Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem. International Journal of Production Research, 58(9), 2604–2625. https://doi.org/https://doi.org/10.1080/00207543.2019.1622052
- Silver, E. A., & Bischak, D. P. (2011). The exact fill rate in a periodic review base stock system under normally distributed demand. Omega, 39(3), 346–349. https://doi.org/https://doi.org/10.1016/j.omega.2010.08.003
- Song, J.-S., Yano, C. A., & Lerssrisuriya, P. (2000). Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty. Manufacturing & Service Operations Management, 2(3), 287–296. https://doi.org/https://doi.org/10.1287/msom.2.3.287.12346
- Taleb, K. N., & Gupta, S. M. (1997). Disassembly of multiple product structures. Computers & Industrial Engineering, 32(4), 949–961. https://doi.org/https://doi.org/10.1016/S0360-8352(97)00023-5
- Taleb, K. N., Gupta, S. M., & Brennan, L. (1997). Disassembly of complex product structures with parts and materials commonality. Production Planning & Control, 8(3), 255–269. https://doi.org/https://doi.org/10.1080/095372897235316
- Taş, D., Gendreau, M., Jabali, O., & Jans, R. (2019). A capacitated lot sizing problem with stochastic setup times and overtime. European Journal of Operational Research, 273(1), 146–159. https://doi.org/https://doi.org/10.1016/j.ejor.2018.07.032
- Tempelmeier, H. (2011). A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint. Omega, 39(6), 627–633. https://doi.org/https://doi.org/10.1016/j.omega.2011.01.003
- Tian, G., Ren, Y., Feng, Y., Zhou, M. C., Zhang, H., & Tan, J. (2019). Modeling and planning for dual-objective selective disassembly using and/or graph and discrete artificial Bee colony. IEEE Transactions on Industrial Informatics, 15(4), 2456–2468. https://doi.org/https://doi.org/10.1109/TII.2018.2884845
- Tian, X., & Zhang, Z.-H. (2019). Capacitated disassembly scheduling and pricing of returned products with price-dependent yield. Omega, 84, 160–174. https://doi.org/https://doi.org/10.1016/j.omega.2018.04.010
- Ullerich, C., & Buscher, U. (2013). Flexible disassembly planning considering product conditions. International Journal of Production Research, 51(20), 6209–6228. https://doi.org/https://doi.org/10.1080/00207543.2013.825406
- Vahdani, B., Soltani, M., Yazdani, M., & Mousavi, S. M. (2017). A three level joint location-inventory problem with correlated demand, shortages and periodic review system: Robust meta-heuristics. Computers & Industrial Engineering, 109, 113–129. https://doi.org/https://doi.org/10.1016/j.cie.2017.04.041
- Wang, Y., & Gerchak, Y. (2003). Capacity games in assembly systems with uncertain demand. Manufacturing & Service Operations Management, 5(3), 252–267. https://doi.org/https://doi.org/10.1287/msom.5.3.252.16030
- Xiao, S., Dong, H., Geng, Y., & Brander, M. (2018). An overview of China’s recyclable waste recycling and recommendations for integrated solutions. Resources Conservation & Recycling, 134, 112–120. https://doi.org/https://doi.org/10.1016/j.resconrec.2018.02.032
- Zhou, F., Lim, M. K., He, Y., Lin, Y., & Chen, S. (2019). End-of-life vehicle (ELV) recycling management: Improving performance using an ISM approach. Journal of Cleaner Production, 228, 231–243. https://doi.org/https://doi.org/10.1016/j.jclepro.2019.04.182
- Zhou, F., Lim, M. K., He, Y., & Pratap, S. (2019). What attracts vehicle consumers' buying A Saaty scale-based VIKOR (SSC-VIKOR) approach from after-sales textual perspective? Industrial Management & Data Systems, 120(1), 57–78. https://doi.org/https://doi.org/10.1108/IMDS-01-2019-0034
- Zhou, F., Lin, Y., Wang, X., Zhou, L., & He, Y. (2016). ELV recycling service provider selection using the hybrid MCDM method: A case application in China. Sustainability, 8(5), 482–496. https://doi.org/https://doi.org/10.3390/su8050482
- Zhou, F., & Ma, P. (2019). End-of-life vehicle (ELV) recycling management practice based on 4R procedure. In: 6th IEEE International Conference on Industrial Engineering and Applications, ICIEA 2019, April 12, 2019 - April 15, 2019 (pp. 230–234). Institute of Electrical and Electronics Engineers Inc.
- Zhou, F., Ma, P., He, Y., Pratap, S., Yu, P., & Yang, B. (2020). Lean production of ship-pipe parts based on lot-sizing optimization and PFB control strategy. Kybernetes (ahead-of-print). https://doi.org/https://doi.org/10.1108/K-06-2019-0389
- Zhou, F., Wang, X., Goh, M., Zhou, L., & He, Y. (2019). Supplier portfolio of key outsourcing parts selection using a two-stage decision making framework for Chinese domestic auto-maker. Computers & Industrial Engineering, 128, 559–575. https://doi.org/https://doi.org/10.1016/j.cie.2018.12.014
- Zhou, F., Wang, X., Lim, M. K., He, Y., & Li, L. (2018). Sustainable recycling partner selection using fuzzy DEMATEL-AEW-FVIKOR: A case study in small-and-medium enterprises (SMEs). Journal of Cleaner Production, 196, 489–504. https://doi.org/https://doi.org/10.1016/j.jclepro.2018.05.247
- Zhou, F. L., Wang, X., He, Y. D., & Goh, M. (2017). Production lot-sizing decision making considering bottleneck drift in multi-stage manufacturing system. Advances in Production Engineering & Management, 12(3), 213–220. https://doi.org/https://doi.org/10.14743/apem2017.3.252
- Zhou, L., Baldacci, R., Vigo, D., & Wang, X. (2018). A multi-depot two-echelon vehicle routing problem with delivery options arising in the last mile distribution. European Journal of Operational Research, 265(2), 765–778. https://doi.org/https://doi.org/10.1016/j.ejor.2017.08.011
- Zhou, L., Lin, Y., Wang, X., & Zhou, F. (2019). Model and algorithm for bilevel multisized terminal location-routing problem for the last mile delivery. International Transactions in Operational Research, 26(1), 131–156. https://doi.org/https://doi.org/10.1111/itor.12399
- Zussman, E., & Zhou, M. (1999). A methodology for modeling and adaptive planning of disassembly processes. IEEE Transactions on Robotics and Automation, 15(1), 190–194. https://doi.org/https://doi.org/10.1109/70.744614