611
Views
0
CrossRef citations to date
0
Altmetric
Original Article

A time-expanded network design model for staff allocation in mail centres

ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Received 02 Dec 2022, Accepted 17 Nov 2023, Published online: 05 Dec 2023

References

  • Ahuja, R. K., Magnanti, T. L., & Orlin, J. B. (1994). Network flows: Theory, algorithms and applications (Vol. 50). Elsevier B.V.
  • Andreatta, G., De Giovanni, L., & Monaci, M. (2014). A fast heuristic for airport ground-service equipment–and–staff allocation. Procedia-Social and Behavioral Sciences, 108, 26–36. https://doi.org/10.1016/j.sbspro.2013.12.817
  • Bard, J. F., Binici, C., & deSilva, A. H. (2003). Staff scheduling at the United States Postal Service. Computers & Operations Research, 30(5), 745–771. https://doi.org/10.1016/S0305-0548(02)00048-5
  • Bard, J. F., DeSilva, A., Feo, T. A., & Wert, S. D. (1993). Design of semi-automated mail processing facilities. IIE Transactions, 25(4), 88–101. https://doi.org/10.1080/07408179308964307
  • Brucker, P., & Knust, S. (2012). Complex scheduling. Springer.
  • Brunner, J. O., Bard, J. F., & Kolisch, R. (2009). Flexible shift scheduling of physicians. Health Care Management Science, 12(3), 285–305. https://doi.org/10.1007/s10729-008-9095-2
  • De Bruecker, P., Van den Bergh, J., Beliën, J., & Demeulemeester, E. (2015). Workforce planning incorporating skills: State of the art. European Journal of Operational Research, 243(1), 1–16. https://doi.org/10.1016/j.ejor.2014.10.038
  • Devesse, V. A. P. A., Akartunalı, K., Arantes, M. d S., & Toledo, C. F. M. (2022). Linear approximations to improve lower bounds of a physician scheduling problem in emergency rooms. Journal of the Operational Research Society, 74(3), 888–904. https://doi.org/10.1080/01605682.2022.2125841
  • Ernst, A. T., Jiang, H., Krishnamoorthy, M., Owens, B., & Sier, D. (2004). An annotated bibliography of personnel scheduling and rostering. Annals of Operations Research, 127(1–4), 21–144. https://doi.org/10.1023/B:ANOR.0000019087.46656.e2
  • Gurobi Optimization, LLC (2022). Gurobi optimizer reference manual. Retrieved from https://www.gurobi.co
  • Jarrah, A. I. Z., Bard, J. F., & deSilva, A. H. (1994a). Equipment selection and machine scheduling in general mail facilities. Management Science, 40(8), 1049–1068. https://doi.org/10.1287/mnsc.40.8.1049
  • Jarrah, A. I. Z., Bard, J. F., & deSilva, A. H. (1994b). Solving large-scale tour scheduling problems. Management Science, 40(9), 1124–1144. https://doi.org/10.1287/mnsc.40.9.1124
  • Kabiru, S., Saidu, B. M., Abdul, A. Z., & Ali, U. A. (2017). An optimal assignment schedule of staff-subject allocation. Journal of Mathematical Finance, 7(4), 805–820. https://doi.org/10.4236/jmf.2017.74042
  • Li, Y., Gao, X., Xu, Z., & Zhou, X. (2018). Network-based queuing model for simulating passenger throughput at an airport security checkpoint. Journal of Air Transport Management, 66, 13–24. https://doi.org/10.1016/j.jairtraman.2017.09.013
  • Louly, M. (2013). A goal programming model for staff scheduling at a telecommunications center. Journal of Mathematical Modelling and Algorithms in Operations Research, 12(2), 167–178. https://doi.org/10.1007/s10852-012-9200-x
  • Ni, H., & Abeledo, H. (2007). A branch-and-price approach for large-scale employee tour scheduling problems. Annals of Operations Research, 155(1), 167–176. https://doi.org/10.1007/s10479-007-0212-2
  • OFCOM (2012). Communications market report 2012. Key Non Parliamentary Papers Ofcom (Office of Communications). Retrieved from https://www.ofcom.org.uk/_data/assets/pdf file/0013/20218/cmruk2012.pdf
  • Paias, A., Mesquita, M., Moz, M., & Pato, M. (2021). A network flow-based algorithm for bus driver rerostering. OR Spectrum, 43(2), 543–576. https://doi.org/10.1007/s00291-021-00622-3
  • Qi, X., & Bard, J. F. (2006). Generating labor requirements and rosters for mail handlers using simulation and optimization [Part special issue: Anniversary focused issue of Computers & Operations Research on tabu search]. Computers & Operations Research, 33(9), 2645–2666. https://doi.org/10.1016/j.cor.2005.02.022
  • Restrepo, M. I., Lozano, L., & Medaglia, A. L. (2012). Constrained network-based column generation for the multi-activity shift scheduling problem. International Journal of Production Economics, 140(1), 466–472. https://doi.org/10.1016/j.ijpe.2012.06.030
  • Skaugset, L. M., Farrell, S., Carney, M., Wolff, M., Santen, S. A., Perry, M., & Cico, S. J. (2016). Can you multitask? Evidence and limitations of task switching and multitasking in emergency medicine. Annals of Emergency Medicine, 68(2), 189–195. https://doi.org/10.1016/j.annemergmed.2015.10.003
  • Tapkan, P., Kulluk, S., Özbakır, L., Bahar, F., & Gülmez, B. (2022). A constraint programming based column generation approach for crew scheduling: A case study for the Kayseri railway. Journal of the Operational Research Society, 74(9), 2028–2042. https://doi.org/10.1080/01605682.2022.2125843
  • Tello, F., Jiménez-Martín, A., Mateos, A., & Lozano, P. (2019). A comparative analysis of simulated annealing and variable neighborhood search in the ATCo work-shift scheduling problem. Mathematics, 7(7), 636. https://doi.org/10.3390/math7070636
  • Van den Bergh, J., Beliën, J., De Bruecker, P., Demeulemeester, E., & De Boeck, L. (2013). Personnel scheduling: A literature review. European Journal of Operational Research, 226(3), 367–385. https://doi.org/10.1016/j.ejor.2012.11.029
  • Xie, L., & Suhl, L. (2015). Cyclic and non-cyclic crew rostering problems in public bus transit. OR Spectrum, 37(1), 99–136. https://doi.org/10.1007/s00291-014-0364-9
  • Zhang, X., Chakravarthy, A., & Gu, Q. (2009). Equipment scheduling problem under disruptions in mail processing and distribution centres. Journal of the Operational Research Society, 60(5), 598–610. https://doi.org/10.1057/palgrave.jors.2602581
  • Zhang, X., & Bard, J. F. (2005). Equipment scheduling at mail processing and distribution centers. IIE Transactions, 37(2), 175–187. https://doi.org/10.1080/07408170590885657