196
Views
9
CrossRef citations to date
0
Altmetric
Research Articles

An economic manufacturing quantity model with rework process for deteriorating products under maintenance-quality policy

, &
Pages 946-965 | Received 01 May 2021, Accepted 06 Nov 2021, Published online: 04 Jan 2022

References

  • Costa AF, Rahim MA. Economic design of Xˉ and R charts under Weibull shock models. Commun Stat Theory Methods. 2013;42:3902–3925.
  • Cheng L, Tsou CS, Yang DY., et al. Cost-service tradeoff analysis of reorder-point-lot-size inventory models. J Manuf Syst. 2015;37:217–226.
  • Zhou X, Wu C, Li Y, et al. A preventive maintenance model for leased equipment subject to internal degradation and external shock damage. Reliab Eng Syst Saf. 2016;154:1–7.
  • Rahman MS, Manna AK, Shaikh AA, et al. An application of interval differential equation on a production inventory model with interval‐valued demand via center‐radius optimization technique and particle swarm optimization. Int J Intell Syst. 2020;35(8):1280–1326.
  • Manna AK, Benerjee T, Mondal SP, et al. Two-plant production model with customers’ demand dependent on warranty period of the product and carbon emission level of the manufacturer via different meta-heuristic algorithms. Neural Comput Appl. 2021;(21). In Press. DOI:10.1007/s00521-021-06073-9.
  • Gan S, Zhang Z, Zhou Y, et al. Joint optimization of maintenance, buffer, and spare parts for a production system. Appl Math Modell. 2015;39(19):6032–6042.
  • Wen D, Ershun P, Ying W, et al. An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy. J Intell Manuf. 2016;27(6):1323–1333.
  • Sarkar B, Sett BK, Sarkar S., et al. Optimal production run time and inspection errors in an imperfect production system with warranty. J Ind Manage Opt. 2018;14(1):267–282.
  • Sett BK, Sarkar S, Sarkar B., et al. Optimal buffer inventory and inspection errors in an imperfect production system with preventive maintenance. Int J Adv Manuf Technol. 2017;90(1–4):545–560.
  • Salmasnia A, Namdar M, Noroozi M., et al. Robust design of a VP-NCS chart for joint monitoring mean and variability in series systems under maintenance policy. Comput Ind Eng. 2018;124:220–236.
  • Salmasnia A, Namdar M, Abdzadeh B., et al. An integrated quality and maintenance model for two-unit series systems. Commun Stat Simul Comput. 2020;49(4):886–917.
  • Bouslah B, Gharbi A, Pellerin R., et al. Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint. Omega (Westport). 2016;61:110–126.
  • Nourelfath M, Nahas N, Ben-Daya M., et al. Integrated preventive maintenance and production decisions for imperfect processes. Reliab Eng Syst Saf. 2016;148:21–31.
  • Salmasnia A, Kaveie M, Namdar M., et al. An integrated production and maintenance planning model under VP-T2 Hotelling chart. Comput Ind Eng. 2018;118:89–103.
  • Salmasnia A, Soltani F, Heydari E, et al. An integrated model for joint determination of production run length, adaptive control chart parameters and maintenance policy. J Ind Prod Eng. 2019;36:401–417.
  • Rahim MA, Ben-Daya M. Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products. J Oper Res Soc. 2001;52(12):1370–1378.
  • Alfares HK, Khursheed SN, Noman SM., et al. Integrating quality and maintenance decisions in a production-inventory model for deteriorating items. Int J Prod Res. 2005;43(5):899–911.
  • Shaikh AA, Cardenas-Barron LE, and Manna AK, et al. An economic production quantity (EPQ) model for a deteriorating item with partial trade credit policy for price dependent demand under inflation and reliability. Yugosl J Oper Res. 2020;31(2): 139–151 .
  • Manna AK, Akhtar M, Shaikh AA, et al. Optimization of a deteriorated two-warehouse inventory problem with all-unit discount and shortages via tournament differential evolution. Appl Soft Comput. 2021;107:107388.
  • Das SC, Manna AK, Rahman MS, et al. An inventory model for non-instantaneous deteriorating items with preservation technology and multiple credit periods-based trade credit financing via particle swarm optimization. Soft Comput. 2021;25(7):5365–5384.
  • Chiu YP. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng Optim. 2003;35(4):427–437.
  • Chen JM, Lin YH, Chen YC., et al. Economic optimization for an imperfect production system with rework and scrap rate. Int J Ind Syst Eng. 2010;6:92–109.
  • Moslehi G, Barzoki MR, Bayati MF., et al. The effect of inflation and time value of money on lot sizing by considering of rework in an inventory control model. Int J Ind Eng. 2011;22:181–192.
  • Wee HM, Widyadana GA. Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time. Int J Prod Res. 2012;50(11):2940–2952.
  • Gouiaa-Mtibaa A, Dellagi S, Achour Z, et al. Integrated maintenance-Quality policy with rework process under improved imperfect preventive maintenance. Reliab Eng Syst Saf. 2018;173:1–11.
  • Salmasnia A, Soltany F, Noroozi M, et al. An economic-statistical model for production and maintenance planning under adaptive non-central chi-square control chart. J Ind Syst Eng. 2019;12: 35–65.
  • Nenes G, Tasias KA, Celano G., et al. A general model for the economic-statistical design of adaptive control charts for processes subject to multiple assignable causes. Int J Prod Res. 2015;53(7):2146–2164.
  • Yin H, Zhang G, Zhu H, et al. An integrated model of statistical process control and maintenance based on the delayed monitoring. Reliab Eng Syst Saf. 2015;133:323–333.
  • Salmasnia A, Abdzadeh B, Rahimi A., et al. Joint optimisation of double warning T2-Hotelling chart and maintenance policy with multiple assignable causes. J Stat Comput Simul. 2020;90(3):465–488.
  • Salmasnia A, Rahimi A, Abdzadeh B., et al. An integration of NSGA-II and DEA for economic–statistical design of T2-Hotelling control chart with double warning lines. Neural Comput Appl. 2019;31(S2):1173–1194.
  • Pan E, Jin Y, Wang S, et al. An integrated EPQ model based on a control chart for an imperfect production process. Int J Prod Res. 2012;50(23):6999–7011.
  • Salmasnia A, Abdzadeh B, Namdar M., et al. A joint design of production run length, maintenance policy and control chart with multiple assignable causes. J Manuf Syst. 2017;42:44–56.
  • Wan Q. Economic-statistical design of integrated model of VSI control chart and maintenance incorporating multiple dependent state sampling. IEEE Access. 2020;8:87609–87620.
  • Jafarian S, Fallahnezhad MS, and Tavakkoli-Moghadam R, et al. An integrated model for optimal selection of quality, maintenance, and production parameters with autocorrelated data. Sci Iran. 2021. In press.DOI:10.24200/SCI.2021.56484.4745.
  • Jafarian S, Fallahnezhad MS, Tavakkoli-Moghaddam R, et al. An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart. J Stat Comput Simul. 2021;(13). In Press. DOI:10.1080/00949655.2021.1904241.
  • Salmasnia A, Emamjomeh E, Maleki MR., et al. Integration of production planning, maintenance scheduling and non-central chi-square chart parameters with random failures and multiple assignable causes. J Adv Manuf Syst. 2021. In Press. DOI: 10.1142/S0219686721500414.
  • Van der Laan E. An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing. Int J Prod Econ. 2003;81:317–331.
  • Disney SM, Warburton RD, Zhong QC‏., et al. Net present value analysis of the economic production quantity. IMA J Manage Math. 2013;24(4):423–435.
  • Beullens P, Janssens GK. Adapting inventory models for handling various payment structures using net present value equivalence analysis. Int J Prod Econ. 2014;157:190–200.
  • Salmasnia A, Hajihosseini Z, Namdar M, et al. A joint determination of production cycle length, maintenance policy, and control chart parameters considering time value of money under stochastic shift size. Sci Iran. 2020;27:427–447.
  • Kawabata Y, Kato E, Yokota H, et al. Net present value as an effective indicator leading to preventive maintenance of port mooring facilities. Struct Infrastruct Eng. 2020;16(4):714–725.
  • Ben-Daya M. Integrated production maintenance and quality model for imperfect processes. IIE Trans. 1999;31(6):491–501.
  • El-Kassar AN, Salameh M, Bitar M., et al. Effects of time value of money on the EPQ model with the imperfect quality items of raw material. Proceedings of Academy of Information and Management Sciences; New Orleans; 16, 11–18. 2012.
  • Talbi EG. Metaheuristics from design to implementation. John Wiley & Sons, Inc; 2009.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.