53
Views
2
CrossRef citations to date
0
Altmetric
Articles

Optimization of remanufacturing systems by using a fuzzy multi-objective model to solve the planning problem

, &
Pages 853-881 | Received 01 Jul 2017, Published online: 21 Apr 2019

References

  • Alimoradi, A. Yussuf, R.M. and Zulkifli, N. “A hybrid model for remanufacturing facility location problem in a closed-loop supply chain”, International Journal of Sustainable Engineering, 4(1), pp.16–23 (2011). doi: 10.1080/19397038.2010.533793
  • Aras, N., Verter, V. and Boyaci, T. “Coordination and priority decisions in hybrid manufacturing/remanufacturing systems”, Production and Operations Management 15(4), pp.528–543 (2006). doi: 10.1111/j.1937-5956.2006.tb00161.x
  • Bellman, R.E. and Zadeh, L.A. “Decision making in a fuzzy environment”, Management Science, 17(4), pp.141–164 (1970). doi: 10.1287/mnsc.17.4.B141
  • Cao, H., Du, Y., Liu, F., Shu, L. and Chen, X. “Customised design of remanufactured products and optimisation model for cores reuse”, International Journal of Computer Integrated Manufacturing, 25(8), pp.741–749 (2012). doi: 10.1080/0951192X.2012.665183
  • Chen, M. and Abrishami, P. “A mathematical model for production planning in hybrid manufacturing-remanufacturing systems,” The International Journal of Advanced Manufacturing Technology, 71(5–8), pp.1187–1196 (2014). doi: 10.1007/s00170-013-5538-0
  • Chiu, M.C. and Teng, L.W. “Sustainable product and supply chain design decisions under uncertainties”, International Journal of Precision Engineering and Manufacturing, 14(11), pp.1953–1960 (2013). doi: 10.1007/s12541-013-0265-x
  • Deng, X., Xu, W.J. and Wang, Z.Q. “Dynamic multi-objective fuzzy portfolio model that considers corporate social responsibility and background risk”, Journal of Interdisciplinary Mathematics, 19(2), 413–432 (2016). doi: 10.1080/09720502.2015.1122866
  • Feng, L., Zhang, J. and Tang, W. “Optimal control of production and remanufacturing for a recovery system with perishable items”, International Journal of Production Research, 51(13), pp.3977–3994 (2013). doi: 10.1080/00207543.2012.762133
  • Franke, C., Basdere, B., Ciupek, M. and Seliger, S. “Remanufacturing of mobile phones – capacity, program and facility adaptation planning”, Omega, 34(6), pp.562–570 (2006). doi: 10.1016/j.omega.2005.01.016
  • Georgiadis, P. and Athanasiou, E. “Flexible long-term capacity planning in closed-loop supply chains with remanufacturing”, European Journal of Operational Research, 225(1), pp.44–58 (2013). doi: 10.1016/j.ejor.2012.09.021
  • Hannan, E. L. “Linear programming with multiple fuzzy goals”, Fuzzy Sets and Systems, 6(3), pp.235–248 (1981). doi: 10.1016/0165-0114(81)90002-6
  • Jorjani, S., Leu, J. and Scott, C. “Model for the allocation of electronics components to reuse options”, International Journal of Production Research, 42(6), pp.1131–1145 (2004). doi: 10.1080/00207540310001632466
  • Khalifehzadeh, S., Seifbarghy, M. and Naderi, B. “Solving a fuzzy multi objective model of a production–distribution system using meta-heuristic based approaches”, Journal of Intelligent Manufacturing, 24, pp.1–15 (2014).
  • Kongar, E. and Gupta, S. M. “Disassembly to order system under uncertainty”, Omega, 34(6), pp.550–561 (2006). doi: 10.1016/j.omega.2005.01.006
  • Li, Y., Chen, J. and Cai, X. “Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing”, International Journal of Production Economics, 105(2), pp.301–317 (2007). doi: 10.1016/j.ijpe.2004.11.017
  • Lieckens, K.T., Colen, P.J. and Lambrecht, M.R. “Optimization of a stochastic remanufacturing network with an exchange option”, Decision Support Systems, 54(4), pp.1548–1557 (2013). doi: 10.1016/j.dss.2012.05.057
  • Lin, D., Teo, C.C. and Lee, C.K.M. “Heuristics for integrated job assignment and scheduling in the multi-plant remanufacturing system”, International Journal of Production Research, 53(9), pp.2674–2689 (2015). doi: 10.1080/00207543.2014.975851
  • Mirakhorli, A. “Fuzzy multi-objective optimization for closed loop logistics network design in bread-producing industries”, The International Journal of Advanced Manufacturing Technology, 70(1–4), pp.349– 362 (2014). doi: 10.1007/s00170-013-5264-7
  • Naeem, M. A., Dias, D., Tibrewal, R., Chang, P.C. and Tiwari, M.K. “Production planning optimization for manufacturing and remanufacturing system in stochastic environment”, Journal of Intelligent Manufacturing, 24(4), pp.717–728 (2013). doi: 10.1007/s10845-011-0619-0
  • Ouyang, J. and Fu, J. “Fuzzy programming models for manufacturing/ remanufacturing network configuration in supply chains”, Energy Procedia, 13, pp.6747−6751 (2011). doi: 10.1016/S1876-6102(14)00454-8
  • Parvini, M., Atashi, A., Husseini, S.M.M. and Esfahanipour, A. “A two-echelon inventory model with product returns considering demands dependent return rates”, The International Journal of Advanced Manufacturing Technology, 72(1–4), pp.107–118 (2014). doi: 10.1007/s00170-014-5645-6
  • Pasandideh, S. H. R., Niaki, S.T.A. and Maleki, L. “A bi-objective remanufacturing problem within queuing framework: An imperialist competitive algorithm”, International Journal of Management Science and Engineering Management, http://doi.org/10.1080/17509653.2014.945504 (2014).
  • Qiang, Q., Ke, K., Anderson, T. and Dong, J. “The closed-loop supply chain network with competition, distribution channel investment, and uncertainties”, Omega, 41(2), pp.186–194 (2013). doi: 10.1016/j.omega.2011.08.011
  • Qu, X. and Williams, J.A.S. “An analytical model for reverse automotive production planning and pricing”, European Journal of Operational Research, 190(3), pp.756–767 (2008). doi: 10.1016/j.ejor.2007.06.041
  • Rafiei, R., Nourelfath, M., Gaudreault, J., Santa-Eulalia, L.A. and Bouchard, M. “A periodic re-planning approach for demand-driven wood remanufacturing industry: a real-scale application”, International Journal of Production Research, 52(14), pp.4198–4215 (2014). doi: 10.1080/00207543.2013.869631
  • Retel Helmrich, M.J., Jans, R., van den Heuvel, W. and Wagelmans, A.P.M. Economic lot-sizing with remanufacturing: complexity and efficient formulations, IIE Transactions 46(1), pp.67–86 (2014). doi: 10.1080/0740817X.2013.802842
  • Richter, K. and Weber, J. “The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost”, International Journal of Production Economics, 71(1–3), pp.447–456 (2001). doi: 10.1016/S0925-5273(00)00142-0
  • Shi, W. and Min, K. Jo “Remanufacturing decisions and implications under material cost uncertainty”, International Journal of Production Research, http://doi.org/10.1080/00207543.2014.932933 (2014).
  • Shi, W., Feng, T. and Jo Min, K. “Remanufacturing decision and sustainability under product life cycle uncertainty”, The Engineering Economist: A Journal Devoted to the Problems of Capital Investment, http://doi.org/10.1080/0013791X.2014.986352 (2015).
  • Song, S., Liu, M., Ke, Q. and Huang, H. Proactive remanufacturing timing determination method based on residual strength, International Journal of Production Research, http://doi.org/10.1080/00207543.2015.1012599 (2015).
  • Su, C. and Xu, A. “Buffer allocation for hybrid manufacturing/remanufacturing system considering quality grading”, International Journal of Production Research, 52(5), pp.1269–1284 (2014). doi: 10.1080/00207543.2013.828165
  • Su, T. S. “Fuzzy multi-objective recoverable remanufacturing planning decisions involving multiple components and multiple machines”, Computers & Industrial Engineering, 72, pp.72–83 (2014). doi: 10.1016/j.cie.2014.03.007
  • Su, T. S. and Lin, Y. F. “Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems”, Journal of Manufacturing Systems, 37(1), pp.396–408 (2015). doi: 10.1016/j.jmsy.2014.07.007
  • Su, T. S., Wu, C.C. and Lin, C.H. “Cost-effectiveness analysis of the mobile phone manufacturing sector by using a novel fuzzy multiobjective programming model”, Scientia Iranica E, (2015). (Articles in Press)
  • Subramoniam, R., Huisingh, D., Chinnam, R.B. and Subramoniam, S. “Remanufacturing decision-making framework (RDMF): research validation using the analytical hierarchical process”, Journal of Cleaner Production, 40, pp.212–220 (2013). doi: 10.1016/j.jclepro.2011.09.004
  • Subulan, K. and Tasan, A. S. “Taguchi method for analyzing the tactical planning model in a closed-loop supply chain considering remanufacturing option”, The International Journal of Advanced Manufacturing Technology, 66(1–4), pp.251–269 (2013). doi: 10.1007/s00170-012-4322-x
  • Teunter, R. H. and Flapper, S.D.P. “Optimal core acquisition and remanufacturing policies under uncertain core quality fractions”, European Journal of Operational Research, 210(2), pp.241–248(2011). doi: 10.1016/j.ejor.2010.06.015
  • Türkşen, I. B. “A review of developments in fuzzy system models: fuzzy rule bases to fuzzy functions”, Scientia Iranica D, 18(3), 522–527 (2011). doi: 10.1016/j.scient.2011.04.001
  • Wee, H. M. and Chung, C. J. “Optimising replenishment policy for an integrated production inventory deteriorating model considering green component-value design and remanufacturing”, International Journal of Production Research, 47(5), pp.1343–1368 (2009). doi: 10.1080/00207540701570182
  • Wei, J. and Zhao, J. “Pricing decisions with retail competition in a fuzzy closed-loop supply chain”, Expert Systems with Applications, 38(9), pp.11209–11216 (2011). doi: 10.1016/j.eswa.2011.02.168
  • Wei, J. and Zhao, J. “Reverse channel decisions for a fuzzy closed-loop supply chain”, Applied Mathematical Modelling, 37(3), pp.1502– 1513 (2013). doi: 10.1016/j.apm.2012.04.003
  • Yang, C.H., Wang, J. and Ji, P. “Optimal acquisition policy in remanufacturing under general core quality distributions”, International Journal of Production Research, 53(5), pp.1425–1438 (2015). doi: 10.1080/00207543.2014.944283
  • Yazdian, S.A., Shahanaghi, K. and Makui, A. “Joint optimisation of price, warranty and recovery planning in remanufacturing of used products under linear and non-linear demand, return and cost functions”, International Journal of Systems Science, http://doi.org/10.1080/00207721.2014.915355 (2014).
  • Zhang, X., Zhang, H., Jiang, Z. and Wang, Y. “An integrated model for remanufacturing process route decision”, International Journal of Computer Integrated Manufacturing, 28(5), pp. 451–459 (2015). doi: 10.1080/0951192X.2014.880804
  • Zhao, S.E., Li, Y.L., Fu, R. and Yuan, W. “Fuzzy reasoning Petri nets and its application to disassembly sequence decision-making for the end-of-life product recycling and remanufacturing”, International Journal of Computer Integrated Manufacturing, 27(5), pp.415–421 (2014). doi: 10.1080/0951192X.2012.717714
  • Zhou, J., Huang, P., Zhu, Y. and Deng, J. “A quality evaluation model of reuse parts and its management system development for end-of-life wheel loaders”, Journal of Cleaner Production, 35, pp.239–249 (2012). doi: 10.1016/j.jclepro.2012.05.037

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.