161
Views
0
CrossRef citations to date
0
Altmetric
Mechanical Engineering

Research and implementation of order-oriented textile production scheduling system

, , &
Pages 331-344 | Received 08 May 2022, Accepted 06 Feb 2023, Published online: 03 Apr 2023

References

  • Chen, J. C., H. Y. Lee, W. H. Hsieh, and T. L. Chen. 2022. “Applying Hybrid Genetic Algorithm to Multi-Mode Resource Constrained Multi-Project Scheduling Problems.” Journal of the Chinese Institute of Engineers 45 (1): 42–53. doi:10.1080/02533839.2021.1983461.
  • Chen, B. F., and Q. Su. 2011. “Application Research of Computers.” Application Research of Computers 19 (12): 158–160. doi:10.3969/j.issn.1001-3695.2002.12.052.
  • Dai, Q. Y., R. Y. Zhong, G. Q. Huang, T. Qu, T. Zhang, and T. Y. Luo. 2012. “Radio Frequency Identification-Enabled Real-Time Manufacturing Execution System: A Case Study in an Automotive Part Manufacturer.” International Journal of Computer Integrated Manufacturing 25 (1): 51–65. doi:10.1080/0951192X.2011.562546.
  • Dick, S., and D. Volmar. 2019. “DLL Hell: Software Dependencies, Failure, and the Maintenance of Microsoft Windows.” IEEE Annals of the History of Computing 40 (4): 28–51. doi:10.1109/MAHC.2018.2877913.
  • Domagała, A., K. Grobler-Dębska, J. Wąs, and E. Kucharska. 2021. “Post-Implementation ERP Software Development: Upgrade or Reimplementation.” Applied Sciences 11 (11): 4937. doi:10.3390/app11114937.
  • Dong, Y. C., W. C. Hong, Y. F. Xu, and S. Yu. 2013. “Numerical Scales Generated Individually for Analytic Hierarchy Process.” European Journal of Operational Research 229 (3): 654–662. doi:10.1016/j.ejor.2013.03.019.
  • Du, W. J., and M. Ma. 2013. Green Power, Materials and Manufacturing Technology and Applications III. China: Wuhan.
  • Erkayman, B. 2018. “Transition to a JIT Production System Through ERP Implementation: A Case from the Automotive Industry.” International Journal of Production Research 57 (17): 5467–5477. doi:10.1080/00207543.2018.1527048.
  • Fiksel, J., L. R. Jager, J. S. Hardin, and M. A. Taub. 2019. “Using GitHub Classroom to Teach Statistics.” Journal of Statistics Education 27 (2): 110–119. doi:10.1080/10691898.2019.1617089.
  • Gao, H. H., and Y. Y. Zhang. 2020. “Application of Modular Design Method in Product Design.” International Conference on Intelligent Design, China: Xi'an.
  • Gomes, U. T., P. R. Pinheiro, and R. Saraiva. 2021. “Dye Schedule Optimization: A Case Study in a Textile Industry.” Applied Sciences 11 (14): 6467. doi:10.3390/app11146467.
  • Haeussler, S., M. Schneckenreither, and C. Gerhold. 2019. “Adaptive Order Release Planning with Dynamic Lead Times.” IFAC-Papersonline 52 (13): 1890–1895. doi:10.1016/j.ifacol.2019.11.478.
  • Hao, G., and J. Zhang. 2018. “Design and Practice of the Competition Schedule Arrangement System of Swimming Sports Based on Artificial Intelligence.” Lecture Notes in Real-Time Intelligent System 613: 440–454. doi:10.1007/978-3-319-60744-3_48.
  • Hendricks, K. B., V. R. Singhal, and J. K. Stratman. 2007. “The Impact of Enterprise Systems on Corporate Performance: A Study of ERP, SCM, and CRM System Implementations.” Journal of Operations Management 25 (1): 65–82. doi:10.1016/j.jom.2006.02.002.
  • Jemmali, M., I. Agrebi, H. Alquhayz, and T. Ladhari. 2021. “Optimal Algorithm for a Two-Machine Flowshop Scheduling Problem with Release Dates and Blocking Constraints.” Journal of the Chinese Institute of Engineers 44 (5): 440–447. doi:10.1080/02533839.2021.1919560.
  • Kalinowski, K., C. Grabowik, G. Cwikla, I. Paprocka, and B. Balon. 2018. “Production Orders Planning Using Additional Backward Pass Scheduling Approach.” IOP Conference Series-Materials Science and Engineering , edited by E. Oanta and Romania Constanta, 13-16 June 2018: vol: 400 (6). Constanta, Romania: IOP Publishing Ltd.
  • Karacapilidis, N. I., and C. P. Pappis. 1996. “Production Planning and Control in Textile Industry: A Case Study.” Computers in Industry 30 (2): 127–144. doi:10.1016/0166-3615(96)00038-3.
  • Kumar, R., K. Singh, and S. K. Jain. 2020. “A Combined AHP and TOPSIS Approach for Prioritizing the Attributes for Successful Implementation of Agile Manufacturing.” International Journal of Productivity and Performance Management 69 (7): 1395–1417. doi:10.1108/IJPPM-05-2019-0221.
  • Ma, J. F., and G. E. O. Kremer. 2016. “A Systematic Literature Review of Modular Product Design (MPD) from the Perspective of Sustainability.” International Journal of Advanced Manufacturing Technology 86 (5–8): 1509–1539. doi:10.1007/s00170-015-8290-9.
  • Malik, Z. A., R. Kumar, G. Pathak, and H. Roy. 2022. “Application of Goal Programming in the Textile Apparel Industry to Resolve Production Planning Problems-A Meta-Goal Programming Technique Using Weights.” Operations Research and Decisions 32 (2): 74–88. doi:10.37190/ord220205.
  • O’leary, D. E. 2002. “Knowledge Management Across the Enterprise Resource Planning Systems Life Cycle.” International Journal of Accounting Information Systems 3 (2): 99–110. doi:10.1016/S1467-0895(02)00038-6.
  • Saaty, T. L. 1990. “How to Make a Decision: The Analytic Hierarchy Process.” European Journal of Operational Research 48 (1): 9–26. doi:10.1016/0377-2217(90)90057-I.
  • Shoval, P., R. Danoch, and M. Balabam. 2004. “Hierarchical Entity-Relationship Diagrams: The Model, Method of Creation and Experimental Evaluation.” Requirements Engineering 9 (4): 217–228. doi:10.1007/s00766-004-0201-9.
  • Wang, W., T. J. Zhao, G. D. Xin, and B. Xu. 2016. “Multiattribute Ranking Based on Analytic Hierarchy Model.” Journal on Communications 37: 5. doi:10.11959/j.issn.1000-436x.2016096.
  • Wen, H. J., S. W. Hou, Z. H. Liu, and Y. J. Liu. 2017. “An Optimization Algorithm for Integrated Remanufacturing Production Planning and Scheduling System.” Chaos Solitons & Fractals 105: 69–76. doi:10.1016/j.chaos.2017.10.012.
  • Zhang, P. 2014. “The Design and Implementation of Production Management Information System Based on B/S.” Proceesings of 2nd International Conference on Teaching and Computational Science, Shenzhen, China, 29-30 July 2014: 116–118. Paris: Atlantis Press.
  • Zhu, Q., G. M. Jiang, H. L. Cong, and A. J. Zhang. 2013. “Development of Manufacturing Execution System of Warp Knitting Based on B/S Mode.” Journal of Textile Research 34 (1): 128–132. doi:10.3969/j.issn.0253-9721.2013.01.025.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.