References
- Department of Defence and National Aeronautics and Space Administration . DOD and NASA Guide , PERT Cost Systems Design . Washington , DC , 1962 .
- M. Gates and A. Scarpa Conceptual RMCfTime Synthesis . J. ASCE Construction Division , 102 (C02) , 1976 , 307 – 323 .
- J. D. Wiest and F. K. Levy A Management Guide to PERT/CPM . Prentice-Hall , Engelwood Cliffs , N.J. , 1977 .
- J. J. Moder , C. R. Phillips , and E. W. Davis Project Management with CPM , PERT, and Precedence Diagramming . Van Nostrand Reinhold Company , New York , NY , 1983 .
- J. J. Adrian Construction Productivity Improvement . Elsevier , New York , NY , 1987 .
- D. W. Halpin Computerized Cost Control of Nuclear Power Plants . J. ASCE Construction Division , 105 (C04) , 1978 , 305 – 315 .
- E. A. Wasil , and A. A. Assad Project Management on the PC Software , Applications, and Trends. Interfaces , 18 (2) , 1988 , 75 – 84 .
- M. Gates Bidding Strategies and Probabilities . J. ASCE Construction Division , 93 (CO 1) , 1967 , 75 – 107 .
- R. M. Stark Unbalanced Bidding Models—Theory . J. ASCE Construction Division , 94 (C02) , 1968 , 197 – 209 .
- R. M. Stark Unbalanced Highway Contract Tendering . Operational Research Quarterly , 25 , 1974 , 373 – 388 .
- R. H. Doersch , and J. H. Patterson Scheduling a Project to Maximize its Present Value A Zero-One Programming approach . Management Science , 23 (8) , 1977 , 882 – 889 .
- R. A. Russell A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Constraints . Management Science , 32 (10) , 1980 , 1291 – 1300 .
- J. H. Patterson A Comparison of Exact Approaches for Solving the Multiple Constrained Resource , Project Scheduling Problem. Management Science , 30 (7) , 983 , 854 – 867 .
- K. F. Reinschmidt , and W. E. Frank Construction Cash-Flow Management System . J. ASCE Construction Divisions , 102 (C04) , 1976 , 615 – 627 .
- P. Burman P. Precedence Networks for Project Planning and Control . McGraw-Hill , New York , NY , 1972 .
- J. J. Adrian Quantitative Methods in Construction Management . Elsevier , New York , NY , 1973 .
- D. B. Ashley , and P. M. Teicholz Pre-Estimate Cash Flow Analysis . J. ASCE Construction Division , 103 (C03) , 1977 , 369 – 379 .
- D. G. Carmichael Construction Engineering Networks . Ellis Harwood Limited , New York , NY , 1989 .
- S. M. Easa Resource Levelling in Construction by Optimization . ASCE Journal of Construction Engineering and Management , 115 (2) , 1989 , 302 – 316 .
- H. M. Wagner Principles of Operations Research . Prentice-Hall , Englewood Cliffs , NJ , 1975 .
- F. A. Karaa , and A. Y. Nasr Resource Management in Construction . ASCE Journal of Construction Engineering and Management , 112 (3) , 1987 , 346 – 357 .
- L. Schrage Linear Programming Models with LINDO . The Scientific Press , Palo Alto , Calif , 1981 .
- L. Schrage Linear, Integer, and Quadratic Programming with LINDO User's Manual . The Scientific Press , Palo Alto , Calif , 1984 .