560
Views
23
CrossRef citations to date
0
Altmetric
Original Articles

Lifetime cost optimization with time-dependent reliability

&
Pages 1389-1410 | Received 26 Feb 2013, Accepted 26 Aug 2013, Published online: 10 Oct 2013

References

  • Ahmad, R., and S. Kamaruddin. 2012. “An Overview of Time-Based and Condition-Based Maintenance in Industrial Application.” Computers and Industrial Engineering 63 (1): 135–149. doi: 10.1016/j.cie.2012.02.002
  • Andrieu-Renaud, C., B. Sudret, and M. Lemaire. 2004. “The PHI2 Method: A Way to Compute Time-Variant Reliability.” Reliability Engineering and System Safety 84 (1): 75–86. doi: 10.1016/j.ress.2003.10.005
  • Bain, L. J., and M. Engelhardt. 1992. Introduction to Probability and Mathematical Statistics. Belmont, CA: Brooks/Cole.
  • Bernard, M. C., and J. W. Shipley. 1972. “The First Passage Problem for Stationary Random Structural Vibration.” Journal of Sound and Vibration 24 (1): 121–132. doi: 10.1016/0022-460X(72)90128-9
  • Chien, Y. H., S. H. Sheu, and Z. G. Zhang. 2012. “Optimal Maintenance Policy for a System Subject to Damage in a Discrete Time Process.” Reliability Engineering and System Safety 103: 1–10. doi: 10.1016/j.ress.2012.03.002
  • Choi, S. K., R. V. Grandhi, and R. A. Canfield. 2007. Reliability-Based Structural Design. London: Springer.
  • Ditlevsen, O. 1979. “Narrow Reliability Bounds for Structural Systems.” Journal of Structural Mechanics 7: 453–472. doi: 10.1080/03601217908905329
  • Ditlevsen, O. 1983. “Gaussian Outcrossings from Safe Convex Polyhedrons.” Journal of Engineering Mechanics 109 (1): 127–148. doi: 10.1061/(ASCE)0733-9399(1983)109:1(127)
  • Doyen, L. 2012. “Reliability Analysis and Joint Assessment of Brown–Proschan Preventive Maintenance Efficiency and Intrinsic Wear-Out.” Computational Statistics and Data Analysis 56 (12): 4433–4449. doi: 10.1016/j.csda.2012.03.012
  • Du, X. 2008. “Saddlepoint Approximation for Sequential Optimization and Reliability Analysis.” Journal of Mechanical Design, Transactions of the ASME 130 (1). doi: 10.1115/1.2717225
  • Du, X., J. Guo, and H. Beeram. 2008. “Sequential Optimization and Reliability Assessment for Multidisciplinary Systems Design.” Structural and Multidisciplinary Optimization 35 (2): 117–130. doi: 10.1007/s00158-007-0121-7
  • Du, X., and B. Huang. 2007. “Reliability-Based Design Optimization with Equality Constraints.” International Journal for Numerical Methods in Engineering 72 (11): 1314–1331. doi: 10.1002/nme.2043
  • Du, X., and A. Sudjianto. 2004. “First-Order Saddlepoint Approximation for Reliability Analysis.” AIAA Journal 42 (6): 1199–1207. doi: 10.2514/1.3877
  • Du, X., A. Sudjianto, and B. Huang. 2005. “Reliability-Based Design with the Mixture of Random and Interval Variables.” Journal of Mechanical Design, Transactions of the ASME 127 (6): 1068–1076. doi: 10.1115/1.1992510
  • Guo, J., and X. Du. 2010. “Reliability Analysis for Multidisciplinary Systems with Random and Interval Variables.” AIAA Journal 48 (1): 82–91. doi: 10.2514/1.39696
  • Herrmann, J. W. 2012. “Finding Optimally Balanced Words for Production Planning and Maintenance Scheduling.” IIE Transactions (Institute of Industrial Engineers) 44 (3): 215–229.
  • Hu, Z., and X. Du. 2012. “Reliability Analysis for Hydrokinetic Turbine Blades.” Renewable Energy 48: 251–262. doi: 10.1016/j.renene.2012.05.002
  • Hu, Z., and X. Du. 2013. “A Sampling Approach to Extreme Value Distribution for Time-Dependent Reliability Analysis.” Journal of Mechanical Design, Transactions of the ASME, 135 (7), 071003 (8 pp). doi: 10.1115/1.4023925
  • Hu, Z., H. Li, X. Du, and K. Chandrashekhara. 2013. “Simulation-Based Time-Dependent Reliability Analysis for Composite Hydrokinetic Turbine Blades.” Structural and Multidisciplinary Optimization 47 (5): 765–781. doi: 10.1007/s00158-012-0839-8
  • Huang, M. F., C. M. Chan, and W. J. Lou. 2012. “Optimal Performance-Based Design of Wind Sensitive Tall Buildings Considering Uncertainties.” Computers and Structures 98–99: 7–16. doi: 10.1016/j.compstruc.2012.01.012
  • Huang, H. Z., Z. J. Liu, and D. N. P. Murthy. 2007. “Optimal Reliability, Warranty and Price for New Products.” IIE Transactions (Institute of Industrial Engineers) 39 (8): 819–827.
  • Hurtado, J. E., and D. A. Alvarez. 2012. “The Encounter of Interval and Probabilistic Approaches to Structural Reliability at the Design Point.” Computer Methods in Applied Mechanics and Engineering 225: 74–94. doi: 10.1016/j.cma.2012.03.020
  • Jensen, H. A., D. S. Kusanovic, and M. A. Valdebenito. 2012. “Compromise Design of Stochastic Dynamical Systems: A Reliability-Based Approach.” Probabilistic Engineering Mechanics 29: 40–52. doi: 10.1016/j.probengmech.2012.02.001
  • Kalowekamo, J. and E. Baker. 2009. “Estimating the Manufacturing Cost of Purely Organic Solar Cells.” Solar Energy 83 (8): 1224–1231. doi: 10.1016/j.solener.2009.02.003
  • Kang, W. H., Y. J. Lee, J. Song, and B. Gencturk. 2012. “Further Development of Matrix-Based System Reliability Method and Applications to Structural Systems.” Structure and Infrastructure Engineering 8 (5): 441–457. doi: 10.1080/15732479.2010.539060
  • Krishnaswami, M., and R. W. Mayne. 1994. “Optimizing Tolerance Allocation Based on Manufacturing Cost and Quality Loss.” In Proceedings of the 20th ASME Design Automation Conference, DE Vol. 69–1, Minneapolis, MN, USA. 11–14 September, 1994, pp. 211–217.
  • Li, J., Z. Mourelatos, and A. Singh. 2012. “Optimal Preventive Maintenance Schedule Based on Lifecycle Cost and Time-Dependent Reliability.” SAE Technical Paper 2012-01-0070 doi:10.4271/2012-01-0070.
  • Mahadevan, S., and N. Smith. 2006. “Efficient First-Order Reliability Analysis of Multidisciplinary Systems.” International Journal of Reliability and Safety 1 (1): 137–154. doi: 10.1504/IJRS.2006.010694
  • McDonald, M., and S. Mahadevan. 2008. “Design Optimization with System-Level Reliability Constraints.” Journal of Mechanical Design, Transactions of the ASME 130 (2). doi: 10.1115/1.2813782
  • Mettas, A. 2000. Reliability Allocation and Optimization for Complex Systems. Piscataway, NJ: Institute Electrical and Electronics Engineers.
  • Pan, E., W. Liao, and L. Xi. 2012. “A Single Machine-Based Scheduling Optimisation Model Integrated with Preventive Maintenance Policy for Maximising the Availability.” International Journal of Industrial and Systems Engineering 10 (4): 451–469. doi: 10.1504/IJISE.2012.046301
  • Rackwitz, R. 2001. “Reliability Analysis—A Review and Some Perspectives.” Structural Safety 23 (4): 365–395. doi: 10.1016/S0167-4730(02)00009-7
  • Rice, S. O. 1944. “Mathematical Analysis of Random Noise.” Bell System Technical Journal 23: 282–332. doi: 10.1002/j.1538-7305.1944.tb00874.x
  • Rice, S. O. 1945. “Mathematical Analysis of Random Noise.” Bell Systems, Technical Journal 24: 146–156. doi: 10.1002/j.1538-7305.1945.tb00453.x
  • Sanchez-Silva, M., G. A. Klutke, and D. V. Rosowsky, 2012. “Optimisation of the Design of Infrastructure Components Subject to Progressive Deterioration and Extreme Loads.” Structure and Infrastructure Engineering 8 (7): 655–667. doi: 10.1080/15732471003686157
  • Sheu, S. H., R. H. Yeh, Y. B. Lin, and M. G. Juang, 2001. “A Bayesian Approach to an Adaptive Preventive Maintenance Model.” Reliability Engineering and System Safety 71 (1): 33–44. doi: 10.1016/S0951-8320(00)00072-7
  • Singh, A., Z. P. Mourelatos, and J. Li. 2010. “Design for Lifecycle Cost Using Time-Dependent Reliability.” Journal of Mechanical Design, Transactions of the ASME 132 (9): 0910081–09100811. doi: 10.1115/1.4002200
  • Singh, A., Z. P. Mourelatos, and E. Nikolaidis. 2011. “An Importance Sampling Approach for Time-Dependent Reliability.” Proceedings of the ASME Design Engineering Technical Conference, Washington, DC, pp. 1077–1088.
  • Song, J., and A. Der Kiureghian. 2006. “Joint First-Passage Probability and Reliability of Systems Under Stochastic Excitation.” Journal of Engineering Mechanics 132 (1): 65–77. doi: 10.1061/(ASCE)0733-9399(2006)132:1(65)
  • Streicher, H., and R. Rackwitz. 2004. “Time-Variant Reliability-Oriented Structural Optimization and a Renewal Model for Life-Cycle Costing.” Probabilistic Engineering Mechanics 19 (1): 171–183. doi: 10.1016/j.probengmech.2003.11.014
  • Suliman, S. M. A., and S. H. Jawad. 2012. “Optimization of Preventive Maintenance Schedule and Production Lot Size.” International Journal of Production Economics 137 (1): 19–28. doi: 10.1016/j.ijpe.2012.01.006
  • Vanmarcke, E. H. 1975. “On the Distribution of the First-Passage Time for Normal Stationary Random Processes.” Journal of Applied Mechanics 42: 215–220. doi: 10.1115/1.3423521
  • Wang, Z., X. Du, and H. Z. Huang. 2010. “Optimal Design Accounting for Reliability, Maintenance, and Warranty.” Journal of Mechanical Design, Transactions of the ASME 132 (1): 0110071–0110078. doi: 10.1115/1.4000638
  • Wang, Z., and P. Wang. 2012a. “A Nested Extreme Response Surface Approach for Time-Dependent Reliability-Based Design Optimization.” Journal of Mechanical Design, Transactions of the ASME 134 (12). doi: 10.1115/1.4007931
  • Wang, Z., and P. Wang. 2012b. “Reliability-Based Product Design with Time-Dependent Performance Deterioration.” In 2012 IEEE International Conference on Prognostics and Health Management: Enhancing Safety, Efficiency, Availability, and Effectiveness of Systems Through PHM Technology and Application (PHM 2012), Denver, CO; 18 June 2012–21 June 2012; Code 93398.
  • Yang, J. N., and M. Shinozuka. 1971. “On the First Excursion Probability in Stationary Narrow-Band Random Vibration.” Journal of Applied Mechanics, Transactions of the ASME 38 Ser E (4): 1017–1022. doi: 10.1115/1.3408904
  • Ye, Z. S., Y. Shen, and M. Xie. 2012. “Degradation-Based Burn-In with Preventive Maintenance.” European Journal of Operational Research 221 (2): 360–367. doi: 10.1016/j.ejor.2012.03.028
  • Zhang, J., and X. Du. 2011. “Time-Dependent Reliability Analysis for Function Generator Mechanisms.” Journal of Mechanical Design, Transactions of the ASME 133 (3). doi: 10.1115/1.4003539
  • Zhou, Z. J., C. H. Hu, W. B. Wang, B. C. Zhang, D. L. Xu, and J. F. Zheng. 2012. “Condition-Based Maintenance of Dynamic Systems Using Online Failure Prognosis and Belief Rule Base.” Expert Systems with Applications 39 (6): 6140–6149. doi: 10.1016/j.eswa.2011.11.068
  • Zhou, X., Z. Lu, and L. Xi. 2012. “Preventive Maintenance Optimization for a Multi-component System Under Changing Job Shop Schedule.” Reliability Engineering and System Safety 101: 14–20. doi: 10.1016/j.ress.2012.01.005

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.