134
Views
2
CrossRef citations to date
0
Altmetric
Original Articles

Cost optimization for series–parallel execution of a collection of intersecting operation sets

, , &
Pages 756-771 | Received 19 Dec 2014, Accepted 21 May 2015, Published online: 06 Jul 2015

References

  • Alting, L., and H. Zhang. 1989. “Computer Aided Process Planning: The State-of-the-Art Survey.” International Journal of Production Research 27 (4): 553–585. doi: 10.1080/00207548908942569
  • Arezoo, B., K. Ridgway, and A. M. A. Al-Ahmari. 2000. “Selection of Cutting Tools and Conditions of Machining Operations Using an Expert System.” Computers in Industry 42: 43–58. doi: 10.1016/S0166-3615(99)00051-2
  • Barkalov, P. S., I. V. Burkova, A. V. Glagolev, and V. N. Kolpachev. 2002. Resource Allocation Problems in Project Management. Moscow: ICS RAS. (In Russian).
  • Battaïa, O., and A. Dolgui. 2013. “A Taxonomy of Line Balancing Problems and their Solution Approaches.” International Journal of Production Economics 142 (2): 259–277. doi: 10.1016/j.ijpe.2012.10.020
  • Battaïa, O., A. Dolgui, N. Guschinsky, and G. Levin. 2014. “Integrated Configurable Equipment Selection and Line Balancing for Mass Production with Serial–Parallel Machining Systems.” Engineering Optimization 46 (10): 1369–1388. doi: 10.1080/0305215X.2013.841904
  • Bennett, D. P., and C. A. Yano. 2004. “A Decomposition Approach for an Equipment Selection and Multiple Product Routing Problem Incorporating Environmental Factors.” European Journal of Operational Research 156: 643–664. doi: 10.1016/S0377-2217(03)00138-3
  • Boysen, N. A., M. Fliedner, and A. Scholl. 2007. “A Classification of Assembly Line Balancing Problems.” European Journal of Operational Research 183: 674–693. doi: 10.1016/j.ejor.2006.10.010
  • Bukchin, J., and J. Rubinovitz. 2003. “A Weighted Approach for Assembly Line Design with Station Paralleling and Equipment Selection.” IIE Transactions 35: 73–85. doi: 10.1080/07408170304429
  • Bukchin, J., and M. Tzur. 2000. “Design of Flexible Assembly Line to Minimize Equipment Cost.” IIE Transactions 32: 585–598.
  • Burkov, V. N., and D. A. Novikov. 1999. “Models and Methods of Multiprojects' Management.” Systems Science 25b (2): 5–14.
  • Cheng, T. C. E., J. J. Yuan, and A. F. Yang. 2005. “Scheduling a Batch-processing Machine Subject to Precedence Constraints, Release Dates and Identical Processing Times.” Computers & Operations Research 32: 849–859. doi: 10.1016/j.cor.2003.09.001
  • Dolgui, A., V. Gordon, and V. Strusevich. 2012. “Single Machine Scheduling with Precedence Constraints and Positionally Dependent Processing Times.” Computers & Operations Research 39: 1218–1224. doi: 10.1016/j.cor.2010.06.004
  • Dolgui, A., N. Guschinsky, and G. Levin. 2006. “A Special Case of Transfer Lines Balancing by Graph Approach.” European Journal of Operational Research 168: 732–746. doi: 10.1016/j.ejor.2004.07.025
  • Grazia Speranza, M., and C. Vercellis. 1993. “Hierarchical Models for Multi-project Planning and Scheduling.” European Journal of Operational Research 64 (2): 312–325. doi: 10.1016/0377-2217(93)90185-P
  • Gupta, A. K., and A. I. Sivakumar. 2006. “Optimization of Due-date Objectives in Scheduling Semiconductor Batch Manufacturing.” International Journal of Machine Tools and Manufacture 46: 1671–1679. doi: 10.1016/j.ijmachtools.2005.08.017
  • Halevi, G. 2003. Process and Operation Planning. Dordrecht: Springer.
  • Huang, J., X. Wang, and R. Chen. 2010. “Genetic Algorithms for Optimization of Resource Allocation in Large Scale Construction Project Management.” Journal of Computers 5 (12): 1916–1924. doi: 10.4304/jcp.5.12.1916-1924
  • Kara, Y. 2008. “Line Balancing and Model Sequencing to Reduce Work Overload in Mixed-model U-line Production Environments.” Engineering Optimization 40 (7): 669–684. doi: 10.1080/03052150801982509
  • Kara, Y., C. Ozguven, N. Yalcin, and Y. Atasagun. 2011. “Balancing Straight and U-shaped Assembly Lines with Resource Dependent Task Times.” International Journal of Production Research 49 (21): 6387–6405. doi: 10.1080/00207543.2010.535039
  • Lasdon, L. 1970. Optimization Theory for Large Systems. New York: Macmillan.
  • Levin, G., B. Rozin, and A. Dolgui. 2012. “Optimization of Multi-tool Cutting Modes for Batch Manufacturing in Large Series Machining Environment.” Proceedings of the 14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM12), Bucharest, Romania, May 23–25. T. Borangiu, I. Dumitrache, A. Dolgui, & F. Filip (Eds.), Elsevier Science, IFAC-PapersOnline.net (ISSN 1474–6670): 444–448.
  • Masood, S. 2006. “Line Balancing and Simulation of an Automated Production Transfer Line.” Assembly Automation 26: 69–74. doi: 10.1108/01445150610645684
  • Osman, H., and M. F. Baki. 2014. “Balancing Transfer Lines Using Benders Decomposition and Ant Colony Optimisation Techniques.” International Journal of Production Research 52 (5): 1334–1350. doi: 10.1080/00207543.2013.842017
  • Oulamara, A., and G. Finke. 2001. “Flow Shop Problems with Two Batch Processing Machines.” International Journal of Mathematical Algorithms 2: 269–287.
  • Oulamara, A., G. Finke, and A. Kamgaing Kuiteing. 2009. “Flowshop Scheduling Problem with a Batching Machine and Task Compatibilities.” Computers & Operations Research 36: 391–401. doi: 10.1016/j.cor.2007.10.006
  • Petrovich, R. 1968. “Optimization of Resource Allocation in Project Planning.” Operations Research 16: 559–568. doi: 10.1287/opre.16.3.559
  • Rekiek, B., A. Dolgui, A. Delchambre, and A. Bratcu. 2002. “State of Art of Optimization Methods for Assembly Line Design.” Annual Reviews in Control 26 (2): 163–174. doi: 10.1016/S1367-5788(02)00027-5
  • Sung, C. S., and Y. H. Kim. 2002. “Minimizing Makespan in a Two-Machine Flowshop with Dynamic Arrivals Allowed.” Computers and Operations Research 29: 275–294. doi: 10.1016/S0305-0548(00)00071-X
  • Szadkowski, J. 1971. “An Approach to Machining Process Optimization.” International Journal of Production Research 9 (3): 371–376. doi: 10.1080/00207547108929887
  • Szadkowski, J. 1997. “Critical Path Concept for Multi-tool Cutting Processes Optimization.” Proceedings of the IFAC Symposium on Manufacturing, Modeling, Management and Control. Vienna, Austria: Elsevier: 393–398.
  • Terkaj, W., T. Tolio, and A. Valente. 2009. “Designing Manufacturing Flexibility in Dynamic Production Contexts.” In Design of Flexible Production Systems, edited by T. Tolio, 1–18. Berlin, Heidelberg: Springer.
  • Tolio, T., and M. Urgo. 2013. “Design of Flexible Transfer Lines: A Case-based Reconfiguration Cost Assessment.” Journal of Manufacturing Systems 32: 325–334. doi: 10.1016/j.jmsy.2012.12.003

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.