474
Views
26
CrossRef citations to date
0
Altmetric
Original Articles

Joint optimization of maintenance, buffers and machines in manufacturing lines

&
Pages 37-54 | Received 17 Mar 2016, Accepted 21 Feb 2017, Published online: 28 Mar 2017

References

  • Amiri, M., and A. Mohtashami. 2011. “Buffer Allocation in Unreliable Production Lines Based on Design of Experiments, Simulation, and Genetic Algorithm.” International Journal of Advanced Manufacturing 62 (1–4): 371–383. doi: 10.1007/s00170-011-3802-8
  • Buzzocott, J. A. 1967. “Automatic Transfer Lines with Buffer Stocks.” International Journal of Production Research 5: 183–200. doi: 10.1080/00207546708929751
  • Dallery, Y., R. David, and X. L. Xie. 1989. Approximate Analysis of Transfer Lines with Unreliable Machines and Finite Buffers. IEEE Transactions on Automatic Control 34: 943–953. doi: 10.1109/9.35807
  • Demir, L., S. Tunali, and D. T. Eliiyi. 2014. “The State of the Art on Buffer Allocation Problem: A Comprehensive Survey.” Journal of Intelligent Manufacturing 5 (3): 371–392. doi: 10.1007/s10845-012-0687-9
  • Demir, L., S. Tunali, and A. Løkketangen. 2011. “A Tabu Search Approach for Buffer Allocation in Production Lines with Unreliable Machines.” Engineering Optimization 43 (2): 213–231. doi: 10.1080/0305215X.2010.481022
  • Gershwin, S. B., and J. E. Schor. 2000. “Efficient Algorithms for Buffer Space Allocation.” Annals of Operations Research 93: 117–144. doi: 10.1023/A:1018988226612
  • Hadidi, L. A., U. M. Al-Turki, and A. Rahim. 2012. “Integrated Models in Production Planning and Scheduling, Maintenance and Quality: A Review.” International Journal of Industrial and Systems Engineering 10 (1): 21–50. doi: 10.1504/IJISE.2012.044042
  • Karamatsoukis, C. C., and E. G. Kyriakidis. 2012. “Optimal Maintenance of a Production System with Intermediate Buffers.” Mathematical Problems in Engineering. doi: 10.1155/2012/673864
  • Köse, S. Y., L. Demir, S. Tunali, and D. T. Eliiyi. 2015. “Capacity Improvement Using Simulation Optimization Approaches: A Case Study in the Thermotechnology Industry.” Engineering Optimization 47 (2): 149–164. doi: 10.1080/0305215X.2013.875166
  • Levitin, G., and A. Lisnianski. 2000. “Optimization of Imperfect Preventive Maintenance for Multi-state Systems.” Reliability Engineering and System Safety 67: 193–203. doi: 10.1016/S0951-8320(99)00067-8
  • Meller, R. D., and D. S. Kim. 1996. “The Impact of Preventive Maintenance on System Cost and Buffer Size.” European Journal of Operational Research 95 (3): 577–591. doi: 10.1016/0377-2217(95)00313-4
  • Mohtashami, A. 2014. “A New Hybrid Method for Buffer Sizing and Machine Allocation in Unreliable Production and Assembly Lines with General Distribution Time-Dependent Parameters.” International Journal of Advanced Manufacturing Technology 74: 1577–1593. doi: 10.1007/s00170-014-6098-7
  • Mohtashami, A. 2015. “A Novel Dynamic Genetic Algorithm-Based Method for Vehicle Scheduling in Cross Docking Systems with Frequent Unloading Operation." Computers and Industrial Engineering 90: 221–240. doi: 10.1016/j.cie.2015.09.008
  • Nahas, N. 2017. “Buffer Allocation and Preventive Maintenance Optimization in Unreliable Production Lines." Journal of Intelligent Manufacturing 28 (1): 85–93. doi: 10.1007/s10845-014-0963-y
  • Nahas, N., and M. Nourelfath. 2014. “Non-linear Threshold Accepting Meta-heuristic for Combinatorial Optimization Problems.” International Journal of Metaheuristics 3 (4): 265–290. doi: 10.1504/IJMHEUR.2014.068904
  • Nahas, N., M. Nourelfath, and D. Ait-Kadi. 2006. “A New Approach for Buffer Allocation in Unreliable Production Lines.” International Journal of Production Economics 103 (2): 873–881. doi: 10.1016/j.ijpe.2006.02.011
  • Nahas, N., M. Nourelfath, and D. Ait-Kadi. 2009. “Selecting Machines and Buffers in Unreliable Series-Parallel Production Lines.” International Journal of Production Research 47: 3741–3774. doi: 10.1080/00207540701806883
  • Rezg, N., A. Chelbi, and X. Xie. 2005. “Modeling and Optimizing a Joint Inventory Control and Preventive Maintenance Strategy for a Randomly Failing Production Unit: Analytical and Simulation Approaches.” International Journal of Computer Integrated Manufacturing 18 (2-3): 225–235. doi: 10.1080/0951192052000288152
  • Sabuncuoglu, I., E. Erel, and A. G. Kok. 2002. “Analysis of Assembly Systems for Interdeparture Time Variability and Throughput.” IIE Transactions 34: 23–40.
  • So, K. C. 1997. “Optimal Buffer Allocation Strategy for Minimizing Work-in-Process Inventory in Unpaced Production Lines.” IIE Transactions 29: 81–88. doi: 10.1080/07408179708966314
  • Spinellis, D., and C. T. Papadopoulos. 2000. “Stochastic Algorithms for Buffer Allocation in Reliable Production Lines.” Mathematical Problems in Engineering 5: 441–458. doi: 10.1155/S1024123X99001180
  • Van, F. A., der Duyn Schouten, and S. G. Vanneste. 1995. “Maintenance Optimization of a Production System with Buffer Capacity.” European Journal of Operational Research 82 (2): 323–338. doi: 10.1016/0377-2217(94)00267-G
  • Whitley, D., and J. Kauth. 1988. “GENITOR: A Different Genetic Algorithm. “Technical Report CS-88-101, Colorado State University, Fort Collins, CO.
  • Yao, X., X. Xie, M. C. Fu, and S. I. Marcus. 2005. “Optimal Joint Preventive Maintenance and Production Policies.” Naval Research Logistics 52 (7): 668–681. doi: 10.1002/nav.20107

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.