References
- Avikal, Shwetank, Rajeev Jain, P. K. Mishra, and H. C. Yadav. 2013. “A Heuristic Approach for U-Shaped Assembly Line Balancing to Improve Labor Productivity.” Computers & Industrial Engineering 64 (4): 895–901. doi:10.1016/j.cie.2013.01.001.
- Aydoğan, Emel Kızılkaya, Yılmaz Delice, Uğur Özcan, Cevriye Gencer, and Özkan Bali. 2019. “Balancing Stochastic U-Lines Using Particle Swarm Optimization.” Journal of Intelligent Manufacturing 30 (1): 97–111. doi:10.1007/s10845-016-1234-x.
- Babazadeh, Hossein, and Nikbakhsh Javadian. 2019. “A Novel Meta-heuristic Approach to Solve Fuzzy Multi-Objective Straight and U-Shaped Assembly Line Balancing Problems.” Soft Computing 23 (17): 8217–8245. doi:10.1007/s00500-018-3457-6.
- Bagher, M., M. Zandieh, and H. Farsijani. 2011. “Balancing of Stochastic U-Type Assembly Lines: An Imperialist Competitive Algorithm.” International Journal of Advanced Manufacturing Technology 54 (1-4): 271–285. doi:10.1007/s00170-010-2937-3.
- Battaïa, O., and A. Dolgui. 2013. “A Taxonomy of Line Balancing Problems and Their Solution Approaches.” International Journal of Production Economics 142 (2): 259–277.
- Baykasoglu, A., and T. Dereli. 2009. “Simple and U-Type Assembly Line Balancing by Using an Ant Colony Based Algorithm.” Mathematical & Computational Applications 14 (1): 1–12.
- Baykasoğlu, Adil, and Lale Özbakır. 2007. “Stochastic U-Line Balancing Using Genetic Algorithms.” The International Journal of Advanced Manufacturing Technology 32 (1): 139–147. doi:10.1007/s00170-005-0322-4.
- Blum, Christian. 2008. “Beam-ACO for Simple Assembly Line Balancing.” INFORMS Journal on Computing 20 (4): 618–627. doi:10.1287/ijoc.1080.0271.
- Blum, Christian. 2010. “Iterative Beam Search for Simple Assembly Line Balancing with a Fixed Number of Work Stations.” arXiv preprint arXiv:1012.3273.
- Blum, Christian, and Cristobal Miralles. 2011. “On Solving the Assembly Line Worker Assignment and Balancing Problem Via Beam Search.” Computers & Operations Research 38 (1): 328–339. doi:10.1016/j.cor.2010.05.008.
- Borba, Leonardo, and Marcus Ritt. 2014. “A Heuristic and a Branch-and-Bound Algorithm for the Assembly Line Worker Assignment and Balancing Problem.” Computers & Operations Research 45: 87–96. doi:10.1016/j.cor.2013.12.002.
- Borba, Leonardo, Marcus Ritt, and Cristóbal Miralles. 2018. “Exact and Heuristic Methods for Solving the Robotic Assembly Line Balancing Problem.” European Journal of Operational Research 270 (1): 146–156. doi:10.1016/j.ejor.2018.03.011.
- Boysen, Nils, Malte Fliedner, and Armin Scholl. 2008. “Assembly Line Balancing: Which Model to Use When?” International Journal of Production Economics 111 (2): 509–528. doi:10.1016/j.ijpe.2007.02.026.
- Chiang, Wen-Chyuan, and Timothy L. Urban. 2006. “The Stochastic U-Line Balancing Problem: A Heuristic Procedure.” European Journal of Operational Research 175 (3): 1767–1781. doi:10.1016/j.ejor.2004.10.031.
- Çil, Zeynel Abidin, Süleyman Mete, and Kürşad Ağpak. 2017. “Analysis of the Type II Robotic Mixed-Model Assembly Line Balancing Problem.” Engineering Optimization 49 (6): 990–1009. doi:10.1080/0305215X.2016.1230208.
- Erel, E., I. Sabuncuoglu, and B. A. Aksu. 2001. “Balancing of U-Type Assembly Systems Using Simulated Annealing.” International Journal of Production Research 39 (13): 3003–3015. doi:10.1080/00207540110051905.
- Erel, E., I. Sabuncuoglu, and H. Sekerci. 2005. “Stochastic Assembly Line Balancing Using Beam Search.” International Journal of Production Research 43 (7): 1411–1426. doi:10.1080/00207540412331320526.
- Fathi, Masood, María Jesús Álvarez, and Victoria Rodríguez. 2016. “A New Heuristic-Based Bi-objective Simulated Annealing Method for U-Shaped Assembly Line Balancing.” European Journal of Industrial Engineering 10 (2): 145–169. doi:10.1504/Ejie.2016.075849.
- Huo, Jiage, Zhengxu Wang, Felix T. S. Chan, Carman K. M. Lee, and Jan Ola Strandhagen. 2018. “Assembly Line Balancing Based on Beam Ant Colony Optimisation.” Mathematical Problems in Engineering 2018: 1–17. doi:10.1155/2018/2481435.
- Hwang, Rea Kook, and Hiroshi Katayama. 2009. “A Multi-decision Genetic Approach for Workload Balancing of Mixed-Model U-Shaped Assembly Line Systems.” International Journal of Production Research 47 (14): 3797–3822. doi:10.1080/00207540701851772.
- Hwang, Rea Kook, Hiroshi Katayama, and Mitsuo Gen. 2008. “U-shaped Assembly Line Balancing Problem with Genetic Algorithm.” International Journal of Production Research 46 (16): 4637–4649. doi:10.1080/00207540701247906.
- Kara, Yakup, and Mahmut Tekin. 2009. “A Mixed Integer Linear Programming Formulation for Optimal Balancing of Mixed-Model U-Lines.” International Journal of Production Research 47 (15): 4201–4233. doi:10.1080/00207540801905486.
- Kazemi, Seyed Mahmood, Reza Ghodsi, Masoud Rabbani, and Reza Tavakkoli-Moghaddam. 2011. “A Novel Two-Stage Genetic Algorithm for a Mixed-Model U-Line Balancing Problem with Duplicated Tasks.” The International Journal of Advanced Manufacturing Technology 55 (9): 1111–1122. doi:10.1007/s00170-010-3120-6.
- Kucukkoc, Ibrahim, and David Z. Zhang. 2017. “Balancing of Mixed-Model Parallel U-Shaped Assembly Lines Considering Model Sequences.” International Journal of Production Research 55 (20): 5958–5975. doi:10.1080/00207543.2017.1312586.
- Li, Zixiang, Mukund Nilakantan Janardhanan, Amira S. Ashour, and Nilanjan Dey. 2019. “Mathematical Models and Migrating Birds Optimization for Robotic U-Shaped Assembly Line Balancing Problem.” Neural Computing & Applications 31 (12): 9095–9111. doi:10.1007/s00521-018-3957-4.
- Li, Zixiang, Ibrahim Kucukkoc, and Qiuhua Tang. 2017. “New MILP Model and Station-Oriented Ant Colony Optimization Algorithm for Balancing U-Type Assembly Lines.” Computers & Industrial Engineering 112: 107–121. doi:10.1016/j.cie.2017.07.005.
- Li, Zixiang, Ibrahim Kucukkoc, and Zikai Zhang. 2018. “Branch, Bound and Remember Algorithm for U-Shaped Assembly Line Balancing Problem.” Computers & Industrial Engineering 124: 24–35. doi:10.1016/j.cie.2018.06.037.
- Li, Ming, Qiuhua Tang, Qiaoxian Zheng, Xuhui Xia, and C. A. Floudas. 2017. “Rules-Based Heuristic Approach for the U-Shaped Assembly Line Balancing Problem.” Applied Mathematical Modelling 48: 423–439. doi:10.1016/j.apm.2016.12.031.
- Mete, Süleyman, Zeynel Abidin Çil, Kürşad Ağpak, Eren Özceylan, and Alexandre Dolgui. 2016. “A Solution Approach Based on Beam Search Algorithm for Disassembly Line Balancing Problem.” Journal of Manufacturing Systems 41: 188–200. doi:10.1016/j.jmsy.2016.09.002.
- Miltenburg, John. 2002. “Balancing and Scheduling Mixed-Model U-Shaped Production Lines.” International Journal of Flexible Manufacturing Systems 14 (2): 119–151. doi:10.1023/a:1014434117888.
- Miltenburg, G. J., and J. Wijngaard. 1994. “The U-Line Line Balancing Problem.” Management Science 40 (10): 1378–1388.
- Nilakantan, J. Mukund, and S. G. Ponnambalam. 2016. “Robotic U-Shaped Assembly Line Balancing Using Particle Swarm Optimization.” Engineering Optimization 48 (2): 231–252.
- Nourmohammadi, A., M. Fathi, M. Zandieh, and M. Ghobakhloo. 2019. “A Water-Flow Like Algorithm for Solving U-Shaped Assembly Line Balancing Problems.” IEEE Access 7: 129824–129833. doi:10.1109/ACCESS.2019.2939724.
- Nourmohammadi, A., M. Zandieh, and R. Tavakkoli-Moghaddam. 2013. “An Imperialist Competitive Algorithm for Multi-objective U-Type Assembly Line Design.” Journal of Computational Science 4 (5): 393–400. doi:10.1016/j.jocs.2012.09.001.
- Oksuz, Mehmet Kursat, Kadir Buyukozkan, and Sule Itir Satoglu. 2017. “U-shaped Assembly Line Worker Assignment and Balancing Problem: A Mathematical Model and Two Meta-Heuristics.” Computers & Industrial Engineering 112: 246–263. doi:10.1016/j.cie.2017.08.030.
- Otto, Alena, and Christian Otto. 2014. “How to Design Effective Priority Rules: Example of Simple Assembly Line Balancing.” Computers & Industrial Engineering 69: 43–52. doi:10.1016/j.cie.2013.12.013.
- Özcan, Uğur, and Bilal Toklu. 2009. “A New Hybrid Improvement Heuristic Approach to Simple Straight and U-Type Assembly Line Balancing Problems.” Journal of Intelligent Manufacturing 20 (1): 123–136. doi:10.1007/s10845-008-0108-2.
- Rahman, Humyun Fuad, Mukund Nilakantan Janardhanan, and Peter Nielsen. 2020. “An Integrated Approach for Line Balancing and AGV Scheduling Towards Smart Assembly Systems.” Assembly Automation. doi: 10.1108/AA-03-2019-0057
- Sabuncuoglu, Ihsan, Erdal Erel, and Arda Alp. 2009. “Ant Colony Optimization for the Single Model U-Type Assembly Line Balancing Problem.” International Journal of Production Economics 120 (2): 287–300. doi:10.1016/j.ijpe.2008.11.017.
- Şahin, Murat, and Talip Kellegöz. 2017a. “An Efficient Grouping Genetic Algorithm for U-Shaped Assembly Line Balancing Problems with Maximizing Production Rate.” Memetic Computing 9 (3): 213–229. doi:10.1007/s12293-017-0239-0.
- Şahin, Murat, and Talip Kellegöz. 2017b. “Increasing Production Rate in U-Type Assembly Lines with Sequence-Dependent Set-up Times.” Engineering Optimization 49 (8): 1401–1419. doi:10.1080/0305215X.2016.1256394.
- Scholl, Armin, and Christian Becker. 2006. “State-of-the-Art Exact and Heuristic Solution Procedures for Simple Assembly Line Balancing.” European Journal of Operational Research 168 (3): 666–693. doi:10.1016/j.ejor.2004.07.022.
- Scholl, Armin, and Robert Klein. 1997. “SALOME: A Bidirectional Branch-and-Bound Procedure for Assembly Line Balancing.” INFORMS Journal on Computing 9 (4): 319–334. doi:10.1287/ijoc.9.4.319.
- Scholl, A., and R. Klein. 1999. “ULINO: Optimally Balancing U-Shaped JIT Assembly Lines.” International Journal of Production Research 37 (4): 721–736. doi:10.1080/002075499191481.
- Serin, Faruk. 2019. “An Efficient Algorithm for U-Type Assembly Line Re-balancing Problem with Stochastic Task Times.” Assembly Automation 39 (4): 581–595. doi:10.1108/AA-07-2018-106.
- Sewell, E. C., and S. H. Jacobson. 2012. “A Branch, Bound, and Remember Algorithm for the Simple Assembly Line Balancing Problem.” INFORMS Journal on Computing 24 (3): 433–442. doi:10.1287/ijoc.1110.0462.
- Sparling, D., and J. Miltenburg. 1998. “The Mixed-Model U-Line Balancing Problem.” International Journal of Production Research 36 (2): 485–501. doi:10.1080/002075498193859.
- Yolmeh, Abdolmajid, and Najmeh Salehi. 2017. “A Branch, Price and Remember Algorithm for the U Shaped Assembly Line Balancing Problem.” arXiv preprint arXiv:1708.04127.
- Zhang, Zikai, Qiuhua Tang, Dayong Han, and Zixiang Li. 2019a. “Enhanced Migrating Birds Optimization Algorithm for U-Shaped Assembly Line Balancing Problems with Workers Assignment.” Neural Computing and Applications 31 (11): 7501–7515. doi:10.1007/s00521-018-3596-9.
- Zhang, Zikai, Qiuhua Tang, Zixiang Li, and Liping Zhang. 2019b. “Modelling and Optimisation of Energy-Efficient U-Shaped Robotic Assembly Line Balancing Problems.” International Journal of Production Research 57 (17): 5520–5537. doi:10.1080/00207543.2018.1530479.
- Zhang, H. H., C. Y. Zhang, Y. Peng, D. Q. Wang, G. D. Tian, X. Liu, and Y. X. Peng. 2018. “Balancing Problem of Stochastic Large-Scale U-Type Assembly Lines Using a Modified Evolutionary Algorithm.” IEEE Access 6: 78414–78424. doi:10.1109/Access.2018.2885030.